Bathrooms by Hampstead Renovations

Bathroom Renovation in London

En-suites, family bathrooms, wet rooms and cloakrooms across North, Central and South West London, set out from the measured room around drainage falls, tanking and wall build-up.

Ross Alinari, Senior Building Surveyor and Construction Director. Hampstead Renovations Ltd, company number 16838595. £5M public liability, £10M employers' liability and contractors' all risks cover.

Marble bathroom and freestanding bath with wall-mounted brass taps at Royal Court House, Sloane Street
Completed bathroom at Royal Court House, Sloane Street

Book a feasibility visit

We reply within one working day, Monday to Friday, 8am to 6pm.

Or call 020 7101 3168

What our clients say

“We have worked with Ross and his company many times. They are extremely professional and hardworking individuals who can work under any circumstances. There was no variation to the works.”

Cirus RehmanFinance Director, Grosvenor Street, Mayfair

“I would like to thank Ross and his team for their consistent commitment to quality and their unerring reliability. They delivered our property to specification and on time, proving to be an extremely effective, experienced, and proactive contractor.”

James WardInvestment Director, Belgravia

Updated

What a bathroom renovation includes

A bathroom renovation in London covers layout, controlled strip-out, plumbing first-fix, waterproofing tanking, drainage falls, ventilation, tiling and fitting for en-suites, family bathrooms, wet rooms and cloakrooms under one contract. Projects typically fall within £9,000 to £18,000 plus VAT, set by written quotation from a feasibility visit and measured survey. Handover includes a 12-month aftercare/defects period.

We design and build the bathroom under one contract: the layout, waterproofing, drainage, ventilation, tiling and fitting. That covers one en-suite or every bathroom in the home.

The room is set out from a measured survey. A wet room or a shower is tanked, and the floor build-up is checked before the tray or the drain is fixed.

Moving the WC, shower or bath away from the soil stack changes the pipe runs. In a flat, the lease and the home below are part of that decision.

In-house architects, designers and structural engineers plan the room. A written quotation follows the agreed specification.

Find your bathroom renovation guide in North and North West London, Central London or West and South West London.

Bathrooms from published projects

Completed bathrooms within published Hampstead Renovations London projects.

Stages 4, 6 and 10 of our 16-stage process

How we renovate a bathroom

Most bathroom faults are buried behind tiles long before the second-fix brassware goes on: missing waterproofing around a tray, poorly anchored shower valves, or pipe falls stretched beyond what the soil stack allows. These three critical stages from our 16-stage sequence (Stages 4, 6 and 10) set out how the hidden structure is protected, checked and waterproofed before tiling begins.

Stage 4 of 16 · Strip-out

Careful strip-out of the old bathroom

  • What happensProtection mats and floor coverings go down along hallways and stairs before anything is disconnected. Sanitaryware, wall tiles, damaged plasterboard and redundant pipework are stripped back cleanly to sound brick, block or timber studwork.
  • What we checkFloor joists and subfloor boards for damp softening or deflection, existing soil-stack position and material (including cast iron in older houses and flats), and hidden cables or live services before new chases are cut.
  • What the homeowner needs to knowStrip-out can reveal historic leaks or uneven joists previously hidden behind board and tiles. In a leasehold flat, lift protection, skip or bagged waste collection, and permitted noisy-work hours should be cleared with building management before work begins.

Read Stage 4 in the 16-stage guide · Continue to Stage 5: Inspect and repair the structure

Technical guidance drawing showing a controlled bathroom strip-out sequence with protected corridor floor coverings, isolated water and electrical supplies, walls stripped back to bare brick and timber studs, capped redundant pipework, exposed floor joists inspected, and bagged waste kept clear of the access route
Technical guidance drawing: general construction sequence for protecting access routes, isolating water and power, stripping back to sound masonry or studs, capping redundant pipes, inspecting joists and keeping bagged waste clear of the hallway (general guidance, not a photograph of a Hampstead Renovations project).
Stage 6 of 16 · First-fix plumbing

First-fix plumbing and concealed shower valve depth

  • What happensHot and cold supplies, waste gradients, concealed WC frames and concealed shower mixer boxes are piped and bolted solidly to timber noggins or masonry. Before closing the wall, we calculate the full wall build-up (backer board + adhesive bed + confirmed tile thickness) and set the valve sleeve accurately to that finished tile face.
  • What we checkExact plumb and level on the mixer body, full pressure-testing of concealed manifolds before boarding, centring on the planned tile grid, and verification with a straightedge that the finished tile face falls safely inside the valve manufacturer's minimum and maximum depth band so the cover plate sits flush.
  • What the homeowner needs to knowConfirm your brassware and actual tile thickness (for instance 9mm porcelain compared with 20mm natural stone) before first-fix ends. Swapping a concealed valve body or changing tile thickness after boarding means opening the waterproofed wall and resetting the pipework.

Read Stage 6 in the 16-stage guide · Continue to Stage 7: Coordinate electrics, heating and extraction

Technical guidance section drawing showing a concealed shower valve body fixed to timber blocking and set so the cover plate sits flush against the finished tile face made up of backer board, adhesive bed and wall tile
Technical guidance drawing: general section detail showing how the concealed valve min/max tolerance band straddles the finished tile datum (board + adhesive + tile) so the cover plate sits flush with no gap (general guidance, not a photograph of a Hampstead Renovations project).
Stage 10 of 16 · Waterproofing (tanking)

Waterproofing (tanking) the shower area before tiling

  • What happensBecause standard tile adhesive and grout are water-resistant rather than waterproof, the entire shower wet zone is tanked before a single tile is fixed. Waterproof membrane, reinforcing internal corner tape, tray or former perimeter bands, and flexible pipe-entry collars are bonded across the wall-to-floor envelope and allowed to cure completely.
  • What we checkContinuous overlaps at internal 90-degree wall corners and tray upstands, tightly sealed rubber/fleece collars around the concealed valve sleeve and shower outlet, membrane dressed cleanly into the drain clamping flange on wet-room formers, and zero pinholes before tiling starts.
  • What the homeowner needs to knowTanking cannot be skipped or rushed straight to tiling without cure time—especially above an occupied flat below. An unsealed corner joint or missing collar stays hidden behind new stone or porcelain until water tracks down into joists and ceilings.

Read Stage 10 in the 16-stage guide · Continue to Stage 11: Set out and lay the tiles

Technical guidance isometric detail drawing of a shower corner before tiling showing continuous waterproofing tanking membrane, vertical reinforcing corner tape, tray perimeter upstand band, pipe-entry collars and drain clamping flange
Technical guidance drawing: general waterproofing detail showing continuous internal corner fleece tape, floor-to-wall perimeter upstand, sealed pipe-entry collars and drain clamping flange prior to adhesive and tiling (general guidance, not a photograph of a Hampstead Renovations project).

Stages 4, 6 and 10 are three key checkpoints in our 16-stage bathroom sequence. Read every step from survey to handover in our 16-stage bathroom renovation guide.

Book a bathroom consultation

How a job is run

  1. Feasibility visit. We look at the home, inspect access and stack positions, and agree the brief.
  2. Measured survey. In-house architects, designers and structural engineers set out the room.
  3. Scope and quotation. You receive a written quotation against the agreed specification.
  4. Consents. Planning, building regulations, the lease or the Party Wall etc. Act are identified where they apply. The decision sits with the council, the freeholder or the neighbour.
  5. Build and handover. One team carries the work from controlled strip-out and tanking through to handover.

The appointment ends with a 12-month aftercare/defects period.

What sets the cost

The cost moves with moving the WC, shower or bath away from the soil stack, tanking and the floor build-up, the strength of the floor, the extract route, sanitaryware, brassware and tiles, and the lease where the bathroom is in a flat.

Bathroom renovation scopes, cost drivers and quoting inputs

Typical scopeWhat changes the costWhat we need to quote
CloakroomWC and basin layout planned around the existing soil stack, controlled strip-out, first-fix plumbing, ventilation, tiling and fitting.Distance and fall to the soil stack (including adapting older cast-iron pipework), wall build-up for a wall-hung WC frame or concealed cistern, extract duct route, tile and sanitaryware specification, and flat lease or listed building constraints where applicable.Feasibility visit, measured room survey checking stack position and extract route, confirmation of who supplies sanitaryware, brassware and tiles, and any flat lease or listing details.
En-suiteWalk-in shower, wall-hung WC and basin beside a bedroom, including strip-out, plumbing first-fix, concealed shower valve setting, wet-zone tanking, ventilation, tiling and fitting.Relocating the WC or shower away from the soil stack, wall build-up for concealed shower valves, niches or a pocket door, wet-zone tanking and tray preparation, extract routing to an external wall or approved duct, porcelain versus natural stone tiling, and flat Licence to Alter or access rules.Feasibility visit, measured survey of room dimensions, joists, stack and ventilation route, confirmed brassware and tile thicknesses before first fix, supply responsibilities, and lease extract if in a flat.
Family bathroomFull strip-out and rebuild accommodating a bath, shower, WC and basin with waterproofing, drainage falls, ventilation, tiling, heating and second-fix fitting.Moving the bath, shower or WC relative to the soil stack, floor joist stiffness and strengthening where needed for heavy fittings or stone, concealed frames and heated towel rail pipework, tile format and natural stone sealing, extract routing, and flat lease, listed consent or hallway access restrictions.Feasibility visit, measured survey checking floor joists, ceiling height, drainage falls and stack position, sanitaryware, brassware and tile selections (plus who supplies them), whether another WC stays usable, and any lease or listing details.
Wet roomTray-free shower room with a floor laid to fall into a linear drain or central gully, continuous floor-to-wall waterproofing tanking, slip-resistant tiling and drainage connection.Floor structure, joist depth and strengthening to prevent tile cracking on upper floors, screed or wet-room former gradients to a linear drain or central gully, full floor and wall tanking membrane with corner tapes, pipe collars and drain flange, slip-resistant stone or porcelain choice, ventilation sizing, and flat lease approval above another home.Feasibility visit and measured survey confirming floor build-up, joist depth and achievable drain fall, linear drain or gully preference, confirmed slip-resistant tiles, concealed valve and rail-blocking positions, and freeholder Licence to Alter or listed details where applicable.

Typical London bathroom renovations fall within £9,000 to £18,000 plus VAT (written quotation from a feasibility visit and measured survey) — outline your project in our cost calculator.

Usually included in a build quotation

  • Floor and hallway protection, controlled strip-out and licensed waste clearance.
  • Plumbing first-fix, waste gradients, concealed cisterns/valves and extract ducting.
  • Substrate boarding (waterproof tile backer board), floor strengthening where specified, and full wet-zone tanking.
  • Tiling, grouting, silicone movement joints, second-fix fitting, testing and the 12-month aftercare/defects period.

Quoted separately or owner-selected

  • Homeowners may supply their own tiles, sanitaryware and brassware directly, or ask us to specify and supply agreed items on the written quotation.
  • Major structural trimmer alterations, full cast-iron soil stack replacements or asbestos removal if uncovered at strip-out (quoted only if required and agreed in writing).
  • Statutory building control fees, freeholder licence-to-alter fees and independent surveying appointments with sister firm Hampstead Chartered Surveyors & Building Consultancy.
  • Temporary accommodation where the home has only one bathroom.

The quotation states the VAT treatment for the agreed scope. A written quotation follows the feasibility visit and the agreed scope and specification.

Questions

What does a bathroom renovation include?

The layout, the waterproofing, the drainage, the ventilation, the sanitaryware, the tiles and the finishes. The survey checks the stack, the falls and the floor before the layout is fixed.

How much does a bathroom renovation cost?

£9,000 to £18,000 plus VAT. The room size, how far the plumbing moves, a wet room, the tiles and sanitaryware, and access move the price inside that range. A written quotation follows a feasibility visit.

Can the shower or WC move?

Often. A WC needs a connection to the soil stack with a workable fall, and a shower or bath needs a fall to its waste. The survey confirms what the stack and the floor allow before the layout is drawn.

How is a bathroom renovation run?

A feasibility visit and a measured survey come first. Waterproofing, falls, ventilation and the fittings are agreed, you receive a written quotation, and the room is stripped out. First fix, tanking, tiling and the fittings follow, and handover includes a 12-month aftercare/defects period.

What is a wet room?

A room whose floor is waterproofed and drained to a floor-level gully, with no tray. The floor is laid to a fall, and the tanking is carried up the walls and around every pipe before the tiles go on. It is specified only where the floor build-up and the drain can do that job.

What has to be settled before the bathroom is stripped out?

The drainage falls, the extract route, the lighting positions, the tile setting-out, the storage, and how a valve or a trap will be reached later. A niche, a pocket door or a wall-hung WC changes the wall build-up, so those choices are on the drawing before the old fittings come out.

Can a bathroom be added where there is not one now?

Where a soil connection, a water supply and a floor that can carry the fittings can all be shown. In a loft the waste is usually boxed through a chase. In a flat the lease has to allow the new connection. The survey says whether that route exists before the room is promised.

Can we use the rest of the house?

Yes, where another WC and a water supply stay available. If this is the only bathroom, the days without it are agreed before the strip-out, including dust protection and the route the fitters will use.

Talk to us about this work

We reply within one working day, Monday to Friday, 8am to 6pm.

Request a call back

Leave your name and phone number and we will call you back about your bathroom renovation.

Send us the details

Step 1 of 2: About your project Step 2 of 2: Your contact details
1. About your project
Optional guide range for bathroom renovation. A written quotation follows a feasibility visit.
2. Your contact details
Optional. We store your answer with your enquiry to understand how people find us.

Bathroom renovation in North and North West London

  • Belsize Park

    For a new bathroom in a villa flat, look for a side or rear route for soil and vent pipes before fixing the layout.

  • Brondesbury Park

    For a lower-ground bathroom on Cavendish Road, check the level of the existing drain before choosing the WC position.

  • Crouch End

    When adding an en-suite beside the family bathroom in a period terrace, decide which showers need to run together before sizing the hot-water supply.

  • Dartmouth Park

    On Boscastle Road, draw the proposed waste and vent routes on the rear wing so you can see which floors they pass.

  • Golders Green

    In a West Heath Court mansion flat, trace where the bathroom waste joins the shared stack before choosing a new shower position.

  • Hampstead

    Trace the waste and extract routes through the existing house before choosing a wet room or en-suite.

  • Hampstead Garden Suburb

    A new vent or outside pipe can bring the Suburb Trust into a bathroom refit. Mark each outlet on the drawing.

  • Hampstead Heath

    For a semi-basement bathroom near South End Green, establish the drain level before choosing a shower position.

  • Highgate

    Trace any staining around the existing bathroom back to its source. The joists, waste pipe and fan route can all affect where the shower will fit.

  • Kentish Town

    A shower under a loft slope needs standing height as well as a fall to the rear stack. Check both in section.

  • Maida Vale

    If a mansion-flat bathroom has no outside wall, establish how steam can reach an approved outlet.

  • Muswell Hill

    In a divided Queen’s Avenue house, trace the shared stack before taking space from a bedroom for an en-suite.

  • Primrose Hill

    In a Chalcot Crescent house, show the proposed fan outlet or soil pipe on the same drawings as the new en-suite.

  • Queen’s Park

    Before moving the WC in a Queen’s Park terrace, measure the fall to the stack and mark where any new pipe would appear outside. See the four bathrooms in a double-fronted Queen’s Park house.

  • Regent’s Park

    For a bathroom in a listed terrace, trace waste pipes and ventilation around the rooms and fabric to be retained.

  • South Hampstead

    Find the shared soil stack and the rooms below the proposed shower before setting the floor height.

  • St John’s Wood

    In a mansion flat, locate the shared soil stack and measure the fall to it before moving the WC.

  • Swiss Cottage

    For a windowless bathroom in a shared block, check the fan route and soil stack before deciding where the shower can go.

  • Totteridge

    In a listed village cottage, plot the waste route around surviving timbers before stripping out the bathroom.

  • West Hampstead

    For an internal bathroom in a mansion flat, find a workable ventilation route before agreeing the layout.

More bathroom renovation pages in North and North West London:

Bathroom renovation in Central London

  • Bayswater

    In a Hallfield Estate flat, work out how to ventilate the bathroom while keeping the original steel window pattern.

  • Belgravia

    For a lower-ground bathroom on Chester Row, check how the room drains and whether the existing system protects it against backflow.

  • Fitzrovia

    In a listed Goodge Place townhouse, record original partitions and floor levels before deciding which room can take a bath or shower.

  • Knightsbridge

    In Hans Town, plan a bathroom fan outlet that leaves the fanlight above the door intact. Cadogan Square marble bathrooms.

  • Lancaster Gate

    In the listed terrace at 10–22 Lancaster Gate, trace the bathroom stack through the divided floors before proposing a new WC position.

  • Marylebone

    On the Harley Street grid, show the waste and ventilation routes on the rear elevation as well as the bathroom plan.

  • Mayfair

    Before relocating the basin or WC in a Mayfair apartment, mark which waste connections are private and which connect to a shared stack.

  • Pimlico

    In a converted Cubitt terrace, follow the stack from the upper bathroom down to the basement before shifting the WC. Marble bathrooms at St George’s Square.

  • St James’s

    At St James’s Place, trace the soil stack through the terrace before deciding whether an upstairs bathroom can change position.

  • Westminster

    In a Matthew Parker Street conversion, locate the soil stack and find out who controls the shut-off valves before moving the WC.

More bathroom renovation pages in Central London:

Bathroom renovation in West and South West London

  • Barnes

    Above a Church Street shop, trace the waste pipe and agree access for testing before lifting the bathroom floor.

  • Battersea

    Some Park Town terraces were built as flats. Establish which home lies below the proposed shower before deciding the floor build-up.

  • Chelsea

    In a Sloane Stanley half-basement, measure the outlet level and trace a waste route that keeps new pipes away from the railed street frontage.

  • Chiswick

    At Strand-on-the-Green, trace a bathroom extract route before cutting into a surviving sash or the river-facing brickwork.

  • Earl’s Court

    In a converted Philbeach house, check the joist depth and the ceiling below before specifying a flush shower tray.

  • Fulham

    Trace the existing external soil pipe on a Moore Park house and record its material before deciding where to move the WC.

  • Holland Park

    In a Holland Park half-basement, measure the drain level and check whether the proposed bathroom needs pumped drainage.

  • Kensington

    In a half-basement behind a Kensington lightwell, measure the floor level against the route to the drain before fixing the shower position.

  • Kew

    On the lower-lying terrace at 68–110 Kew Green, measure the drain level before moving a ground-floor WC.

  • Notting Hill and Notting Hill Gate

    In a divided house near Powis Square, find which flats use the soil stack before moving a WC or arranging a water shut-off.

  • Parsons Green

    In a mansard bathroom, mark the standing headroom beside the bath and the position of the existing stack before moving the door.

  • Putney

    In a Lower Richmond Road mansion flat, locate the shared stack and check how the new bathroom floor will insulate the flat below.

  • Richmond

    In a tall Richmond Hill terrace, follow the soil stack between floors before deciding where an upper-floor bathroom can go.

  • South Kensington

    For an upper-floor bathroom in a Queen’s Gate mansion block, check the fall to the shared stack and who can isolate the water before moving the shower.

  • Wimbledon

    On Malcolm Road, plan the bathroom extract route around any surviving leaded casement window.

More bathroom renovation pages in West and South West London:

Bathroom renovation in South East London

Bathroom renovation in East London

Where we work across London

See what sets the bathroom renovation cost or use the cost calculator. Related work: house refurbishment, flat refurbishment, kitchen renovation and published case studies.

Surveying is a separate instruction to Hampstead Chartered Surveyors & Building Consultancy.

The room, the waterproofing and the finishes

A bathroom packs drainage, waterproofing, ventilation and finishes into a small room. The decisions that matter are made before the old fittings come out.

Which room it is

A family bathroom has to hold a bath, a shower, a WC and a basin, with enough clear floor to use them. An en-suite is usually a shower, a wall-hung WC and a basin beside a bedroom. A cloakroom is a WC and a basin, often the first room a guest sees, and it is planned around the stack rather than around a style. The survey records the ceiling height, the joists and the soil stack before any of those layouts is promised.

Small rooms

A wall-hung WC and a wall-hung basin leave the floor clear, with the cistern and the waste inside the wall or a slim unit. In a very small room, a walk-in shower in place of a bath returns floor area, and a compact bath is the alternative where a bath has to stay. A door that swings into the room takes floor space a pocket door or a sliding door can give back, where the wall is deep enough. Larger tiles mean fewer grout joints, and a niche built into the shower wall replaces a hanging rack. A heated towel rail can take the place of a separate radiator where the heating design allows it. These are choices on the drawing, and each one changes the wall build-up.

Wet rooms and waterproofing

A wet room is a floor that is tanked and drained, with no tray. The tanking runs across the whole floor, up the walls and around every pipe, and it is completed before the tiles. The floor falls to a linear drain along one wall, or to a central gully. A linear drain lets the tiles fall in one direction. A central gully needs the floor to fall from four sides. The gradient and the drain are set out in the screed or a former, not adjusted in the adhesive.

The floor has to be stiff enough that the tiles do not crack, which on an upper floor can mean checking the joists and boarding over them. Slip resistance is specified for the wet area. Polished stone is a poor choice underfoot once it is wet. A level threshold, reinforcement in the wall for a rail that may be wanted later, and a thermostatic valve are specified where the household needs them. They are drawn with the layout so the blocking and the valve are in place before the tiles.

Moving the plumbing, and adding a bathroom

A WC moves only as far as a fall to the soil stack allows. A shower or a bath moves only as far as its waste can fall. In an older house the stack may be cast iron, and adapting or replacing the section that is opened up is part of the survey, not a surprise in the strip-out. Extract has its own route, to an external wall or a duct the building allows, and it is fixed before the ceiling is closed.

A new bathroom, in a bedroom or a loft, needs a soil connection, a water supply and a floor that can carry the fittings. The waste is boxed in a chase where it cannot sit in the floor. In a flat the lease has to allow the connection, the hours and the route through the common parts. Listed-building consent is checked where the new openings or the loss of historic fabric would affect the building’s special interest.

Materials and what moves the price

Porcelain, natural stone, encaustic tiles and a micro-cement finish behave differently once they are wet and once they are cleaned. Natural stone is sealed before it is grouted and it is resealed as it wears. The quotation names the tile, the sanitaryware, the brassware, the tanking and who supplies each of them. It does not name a brand.

Inside the published range, the price moves with the room size, how far the plumbing moves, whether the floor is tanked as a wet room, the tile and sanitaryware specification, and the access. The 12-month aftercare/defects period applies to the completed work. If the household has to be out because this is the only bathroom, that stay is a household cost and it is not part of the build range.

Ventilation is sized for the room and given a route before the ceiling is closed. A fan that only recirculates does not deal with the moisture, and a duct with nowhere to go is found at the survey. The same drawing marks an access panel for the shower valve and the trap, so a later repair does not mean taking the tiles off. Where a rail may be wanted later, timber is fixed behind the tile now, in the positions on the drawing. The rail can wait. The wall cannot be opened again without disturbing the waterproofing.

Chat with us!