Skip to main content

Holborn WC1 · Houses, flats, kitchens & bathrooms

Holborn Renovations & Design-Build — WC1

Updated 10 November 2026

Mansion blocks, Georgian terraces and estate flats

Start your house, flat or bathroom plans with the building: a mansion-block flat on a main road, a townhouse over a basement in a Georgian terrace or a flat on the Bourne Estate. Tell us the rooms you would change, the original detail that survives and the council, lease and listing records that apply.

Serving Holborn from our Hampstead studio · NW3 6DN
020 7101 3168

Hampstead Renovations design and build studio on Finchley Road
Our Hampstead studio · Finchley Road, NW3 6DN

Start with your project

Choose the work your Holborn home needs

Choose a focused room renovation or a coordinated refurbishment. Each service page explains the scope in more detail and gives you a direct route to discuss the work.

01 Terraced townhouses on basements

House refurbishment in Holborn

In the Great James Street and Bedford Row terraces, Holborn townhouses rise three or four storeys over a basement behind cast-iron railings. Plan rooms, heating, wiring and drainage as one scheme, give repairs to original joinery, windows and railings their own section of the brief, and identify any listed interior before walls or floors are opened.

  • Council, conservation area and list entry confirmed
  • Railings, front area, roof and joinery surveyed
  • Services and structure planned floor by floor
Explore house refurbishment in Holborn

02 Mansion blocks and estate flats

Flat renovation in Holborn

A Holborn flat may sit in a mansion block on a main road or in a balcony-access block such as the Bourne Estate, sharing structure, drainage and entrances with neighbours. Check what the lease requires and get any landlord consent in writing before fixing the layout, trace shared stacks and supplies, and agree delivery routes through common parts.

  • Written landlord consent obtained under the lease
  • Soil stack, risers and stopcocks located with the agent
  • List entry checked for the block or estate
Explore flat refurbishment in Holborn

03 Bathrooms in flats and townhouses

Bathroom renovation in Holborn

One room on its own is a complete project: a standalone bathroom, en-suite or shower room in Holborn is welcome. In a mansion-block or estate flat, confirm the connection to the shared stack and where extract air can leave the building; in a townhouse, check the floor structure first. Then bring waterproofing, lighting, tiling and fittings into one specification.

  • Shared stack connection and waste falls confirmed
  • Extract route agreed within the lease and building rules
  • Another shower or basin arranged while the room is closed
Explore bathroom renovation in Holborn

04 Kitchens above shops and in estate flats

Kitchen renovation in Holborn

Many Holborn homes sit above shops and former workshops, where a kitchen's extract, gas and waste have to work around the floor below. In the older council-built blocks near Kingsway, including the listed Bourne Estate, the building's own services and rules set the limits on what can move.

  • Extract and gas routed around the floor below
  • Estate rules and the lease checked
  • Listing confirmed for the block
Explore kitchen renovation in Holborn

Real projects, clearly located

Ideas for your Holborn refurbishment

Photographs of our work elsewhere in London

Explore an apartment on Chesterfield Street in Mayfair and a bathroom in Pimlico. Use these examples to discuss the scale of work and finishes you have in mind for your own home.

More London project records: Carlton Lodge, Belgravia · King’s Road, Chelsea.

Our in-house architects, designers and structural engineers
Structural
Engineering Calculations
Planning
Applications & Consents
Building Control
Compliance Support
Leasehold
Licence for Alteration
£5M
public liability, £10M employers' liability and contractors' all risks cover

Local knowledge with a purpose

Understand the building before changing it

A mansion-block flat on a main road, a terraced townhouse near Bedford Row and a flat in the listed part of the Bourne Estate each lead to a different brief. Establish which council covers the address, what is listed or designated and who else shares the building before deciding the layout.

On the Camden side, Holborn falls partly within the southern sub areas of the Bloomsbury conservation area. Along New Oxford Street, High Holborn and Southampton Row, the appraisal describes large late 19th- and early 20th-century blocks, mainly commercial, where homes are generally in mansion blocks. Lincoln’s Inn and Gray’s Inn, a centre of the legal profession for over five hundred years, have courtyards, squares and narrow lanes, and around them dwellings were converted into legal offices.

Bloomsbury conservation area appraisal and management strategy, April 2011

In the Great James Street and Bedford Row sub area, 18th- and 19th-century townhouses of three or four storeys stand on basements behind cast-iron railings, in long terraces with mews behind; the mews are generally two storeys with no basements. Historic England lists 3–16 Great James Street, fourteen terraced houses of 1720–24 built for J Metcalfe, at Grade II*. Check the entry for each address rather than assuming a whole street shares one grade.

Bloomsbury conservation area appraisal and management strategy, April 2011 · Historic England: 3–16 Great James Street and attached railings, Grade II* · Historic England: listed-building consent

Camden’s Hatton Garden appraisal places that area in the Holborn district, against the City of London to the south and Islington to the east. No single period, style or use predominates: Victorian former warehouses and 20th-century commercial buildings stand with a smattering of Georgian houses, and the north-west is more residential. The Bourne Estate forms its own sub-area, and Historic England lists its northern part, a London County Council estate of five-storey balcony-access flats, at Grade II.

Hatton Garden conservation area appraisal, adopted September 2017 · Historic England: Bourne Estate (northern part), Grade II

The first local check

Confirm the council before anything else

Holborn is a district name, not one council area. Camden and the City of London meet along High Holborn, Holborn and Chancery Lane, and the southern end of Kingsway lies in the City of Westminster. Confirm the council for the full address, then check the conservation area map, list entry, Article 4 information, lease or title and planning history; a WC1 or WC2 postcode settles none of these. The Camden rules described here apply only to Camden addresses.

Find the council for the property · City of London: Chancery Lane conservation area SPD, adopted 23 February 2016 · Kingsway conservation area statement, December 2001 · Camden conservation areas and heritage statements · Historic England: listed-building consent · Camden: current heritage Article 4 directions · LEASE: alterations and home improvements

Separate checks, one coordinated brief

Planning, listed buildings, building control and leases

One approval does not settle every requirement. Identify the applicable routes before ordering work, and record who will prepare submissions, arrange inspections and provide the relevant completion information.

Planning, flats and householder rights

Will any part of the work need planning permission?

Work confined to the inside of a Holborn flat or townhouse is generally not development, so it normally needs no planning permission; external alterations, extensions and changes of use each need their own check. A flat, whether in a mansion block or on an estate, has no Part 1 householder rights. For a house, check the limits, earlier conditions and Article 4 position; Camden’s Bloomsbury appraisal notes a limited number of properties there with permitted development rights.

When planning permission is required · Householder permitted development technical guidance · Camden: current heritage Article 4 directions · Bloomsbury conservation area appraisal and management strategy, April 2011

Listed buildings and conservation areas

Does listing reach inside the flat or house?

It can. Listed building consent is needed for work that affects a listed building’s special interest, inside or out, and Camden warns that working without it is a criminal offence, even unknowingly. Holborn examples run from the Grade II* terrace at 3–16 Great James Street to the Grade II northern part of the Bourne Estate. Being in a conservation area is a different matter from listing, and for a Camden application there the council expects a heritage statement.

Historic England: listed-building consent · Camden: listed buildings and listed building consent · Historic England: 3–16 Great James Street and attached railings, Grade II* · Historic England: Bourne Estate (northern part), Grade II · Camden conservation areas and heritage statements

Building Regulations

Who checks the building work as it goes in?

Opening a structural wall in a mansion-block flat, adding a shower room to a townhouse, rewiring or upgrading insulation can each bring Building Regulations requirements. Settle, item by item, whether building control or a registered competent-person scheme will deal with it, which inspections fall due and which certificates you will keep at the end. These requirements sit alongside planning permission, listed building consent and the landlord’s licence; none of those replaces them.

When Building Regulations approval is needed

Lease consent and Party Wall procedures

Who else has to agree before work begins?

The lease of a mansion-block or estate flat decides whether written landlord consent is needed, and it may attach conditions to floors, services, windows and common parts; that consent is separate from planning and listed building consent. The Party Wall Act applies only to qualifying work, such as cutting into a wall shared with the next terrace house, and refitting a bathroom does not engage it by default.

LEASE: alterations and home improvements · Party-wall work requiring notice

Local facts that affect the brief

Apply the controls to the work you actually need

Guidance dated 2001, 2011, 2016 and 2017

Match the address to its conservation area guidance

Camden’s Bloomsbury appraisal and management strategy, adopted in April 2011 for an area first designated in 1968, replaced a 1998 statement. Its sub areas covering Holborn are New Oxford Street/High Holborn/Southampton Row, Lincoln’s Inn Fields/Inns of Court/High Holborn, Great James Street/Bedford Row and Queen Square/Red Lion Square. It expects original features to be kept and repaired, but it cites policy since replaced, so read it alongside the current Local Plan.

Bloomsbury conservation area appraisal and management strategy, April 2011 · Camden Local Plan, adopted 3 July 2017

Hatton Garden, designated in 1999, has an appraisal adopted on 12 September 2017. Under it, total or substantial demolition needs planning permission, as do roof alterations, extensions and terraces, which are unlikely to be acceptable where they harm the building, break a terrace’s unified roofscape or are prominent in the townscape or long views.

Hatton Garden conservation area appraisal and management strategy · Hatton Garden conservation area appraisal, adopted September 2017

The Kingsway area, designated on 16 June 1981, has a statement adopted in December 2001 describing it as predominantly commercial with little residential use; it adjoins Bloomsbury at Lincoln’s Inn Fields and the neighbouring Seven Dials area. Across the boundary, the City of London’s Chancery Lane conservation area, between Holborn, Fleet Street, Chancery Lane and Fetter Lane, has its own guidance adopted on 23 February 2016, and Camden’s appraisals do not apply there.

Kingsway conservation area appraisal and management strategy · Kingsway conservation area statement, December 2001 · City of London: Chancery Lane conservation area SPD, adopted 23 February 2016 · Find the council for the property

Article 4 index checked 4 October 2026

Article 4: what applies at a Camden address

As of 4 October 2026, Camden’s heritage Article 4 index lists no direction for the Bloomsbury, Hatton Garden or Kingsway conservation areas. The Bloomsbury appraisal says a direction is not considered appropriate there, given the high proportion of listed buildings and the limited number of properties with permitted development rights. Without a direction, the controls that remain are listing, the conservation-area rules and the normal limits of householder permitted development, which a flat does not have in any case.

Camden: current heritage Article 4 directions · Bloomsbury conservation area appraisal and management strategy, April 2011 · Householder permitted development technical guidance · Historic England: listed-building consent

Camden’s borough-wide basement direction does apply, so every basement excavation at a Camden address needs planning permission. Its Class MA directions, in effect from 29 July 2022 and, as modified, applying from 23 February 2023 in the areas shown on its maps, concern turning commercial premises into homes rather than work to an existing home. For a City of London or Westminster address, check that council’s own Article 4 information.

Camden: borough-wide basement Article 4 direction · Camden: Article 4 directions on changes of use (Class MA) · Find the council for the property

2017 Local Plan; replacement under examination

Work from the adopted plan and the current planning authority

Camden still treats its Local Plan of 3 July 2017 as the basis for planning decisions. Its replacement, submitted on 3 October 2025, had hearings in May and June 2026, and in letter ED102 of 12 August 2026 the Inspector found it unsound as submitted but likely capable of being made sound through main modifications, with at least six weeks’ consultation to follow. When checked on 4 October 2026, no consultation timetable had appeared; the draft is not adopted policy.

Camden Local Plan, adopted 3 July 2017 · Replacement Camden Local Plan: examination news · Inspector’s post-hearings letter ED102, 12 August 2026

Camden lists its January 2021 planning guidance on home improvements, basements and design as adopted, though that guidance carries less weight than the Local Plan. None of Camden’s adopted neighbourhood plans covers Holborn.

Camden: planning policy and guidance documents · Camden: neighbourhood planning

Since 10 August 2026 the Oxford Street Development Corporation has been the local planning authority for its mapped area, which includes land around Tottenham Court Road station and St Giles. Camden says planning applications, pre-application requests and enforcement complaints for that area must not be sent to it, and the corporation decides transferred applications using Camden’s plan. If your address is near there, check the boundary map.

Camden: transfer of planning powers to the Oxford Street Development Corporation · Oxford Street Development Corporation area boundary map

Camden basement direction, 1 June 2017

Refitting a lower ground floor is not excavation

At a Camden address, the borough-wide Article 4 direction, which the council lists as adopted on 1 June 2017, means every basement excavation needs planning permission. A new or extended basement also needs a site-specific Basement Impact Assessment covering drainage, flooding, groundwater and structural stability. The basements policy in the draft replacement plan is still under examination and is not adopted.

Camden: borough-wide basement Article 4 direction · Camden: basement development and impact assessments · Replacement Camden Local Plan: examination news

Upgrading a bathroom in a basement that already exists raises different questions from deepening it or cutting a new lightwell. Hatton Garden’s appraisal generally resists new front lightwells and accepts basements under or behind buildings only where they do not harm the area. The Bloomsbury strategy resists infilling lightwells and, where shops have infilled basements and the pavement meets the building, does not normally accept excavation.

Hatton Garden conservation area appraisal, adopted September 2017 · Bloomsbury conservation area appraisal and management strategy, April 2011

Before windows are ordered, a roof is altered or any digging is planned, establish which council covers the address and which consents the work needs. Each regime stands alone: planning permission, listed building consent, conservation-area guidance, Article 4 controls, Building Regulations, the lease’s consent process and the Party Wall Act do not satisfy one another, and Camden’s rules do not reach City of London or Westminster addresses.

Find the council for the property · Camden: current heritage Article 4 directions · Historic England: listed-building consent · Camden conservation areas and heritage statements · When Building Regulations approval is needed · LEASE: alterations and home improvements · Party-wall work requiring notice

Local guidance checked . The linked sources help you prepare a brief; requirements depend on the address, building and complete proposal.

From retained details to shared services

Sashes, shared stacks, railings and lower grounds

Sash windows, front doors and joinery

In the Bloomsbury sub areas, Camden expects original sash windows, joinery, porches and front doors to be retained and repaired, and replaced only where beyond repair. Inspect cords, glass and timber sash by sash before choosing draught-proofing, secondary glazing or new frames. In a listed terrace such as 3–16 Great James Street, check consent first; for a mansion-block flat, read the lease, remembering that a flat has no householder rights.

Bloomsbury conservation area appraisal and management strategy, April 2011 · Historic England: 3–16 Great James Street and attached railings, Grade II* · Historic England: listed-building consent · LEASE: alterations and home improvements · Householder permitted development technical guidance

Bathrooms, shared stacks and extraction

In a mansion block or balcony-access estate block, a bathroom can drain to a stack shared with flats above and below, so locate the stack, the isolation valves and who is responsible for them before planning a layout. Fix the waste gradient, extract duct run and tanking before any tile is chosen, and find the cause of any stain or damp patch instead of hiding it.

When Building Regulations approval is needed · LEASE: alterations and home improvements

Walls, joists and noise between flats

Before removing a partition or laying stone, establish what the wall carries, how the floor is framed and what earlier services have cut into it. Between flats in a mansion block, decide floor build-up, sound insulation and lease conditions together; Approved Document E applies to some building work and not to all, so check whether yours engages it. In a terrace house, ask whether the work touches a party wall.

When Building Regulations approval is needed · GOV.UK: Approved Document E, resistance to sound · LEASE: alterations and home improvements · Party-wall work requiring notice

Railings, front areas, common parts and trees

Townhouses in the Great James Street and Bedford Row terraces stand on basements behind cast-iron railings, and the Bloomsbury strategy resists the loss of original railings and the infilling of basement lightwells. In a mansion block, protect shared entrances and stairs as the lease requires. Work on a tree in a Camden conservation area needs six weeks’ notice if its trunk exceeds 75mm in diameter at 1.5m.

Bloomsbury conservation area appraisal and management strategy, April 2011 · LEASE: alterations and home improvements · Camden: protected trees · Tree preservation orders and conservation-area trees

Lower grounds, archaeology and ground conditions

Before fitting out an existing basement room, look at its damp, drainage and air movement; mews in the Bedford Row area generally have no basement. Digging is a separate project. Historic England’s 2018 appraisal for Camden proposes treating the Roman roads along High Holborn and New Oxford Street as part of a Tier 2 London Suburbs area, and Hatton Garden’s appraisal requires a desk-based archaeological assessment within it.

Bloomsbury conservation area appraisal and management strategy, April 2011 · Historic England: Camden Archaeological Priority Areas appraisal, October 2018 · Hatton Garden conservation area appraisal, adopted September 2017

Warmer homes without harming historic fabric

Treat insulation, heating and ventilation as one decision so that moisture is not trapped in older walls. The Bloomsbury strategy warns that insensitive repointing, painting or render harms historic brickwork, and that intrusive dormers or poor roof materials will not be acceptable. Before adding external plant, flues or grilles, check the list entry, the conservation guidance and, for a flat, the lease.

Historic England: a whole-building approach · Bloomsbury conservation area appraisal and management strategy, April 2011 · Historic England: listed-building consent · LEASE: alterations and home improvements

A practical plan for the street and building

Working hours, deliveries and shared access

Street access, skips and scaffolding

Camden’s skip licences are applied for by the skip firm, at least five working days ahead; skips cannot sit on the pavement, and one in a parking bay also needs a suspension, which Camden asks you to book at least 17 days ahead. Scaffolds and hoardings need a building licence. TfL licenses scaffolds and skips on its own roads, though a red line alone does not prove a road is TfL’s, so check its map. City and Westminster addresses follow their own council’s process.

Camden: skip licences · Camden: parking bay suspensions · Camden: building licences for scaffolds and hoardings · TfL: red routes and the TLRN map · TfL: highway licences on red routes · Find the council for the property · LEASE: alterations and home improvements

Noisy work, neighbours and occupation

Camden permits noisy work without authorisation 8am–6pm on weekdays and 8am–1pm on Saturdays, but not on Sundays or bank holidays; anything outside that window requires a section 61 prior consent from the council (Control of Pollution Act 1974), applied for 28 or more days beforehand. City and Westminster addresses follow their own council’s hours. Around Hatton Garden, where the jewellery trade and Leather Lane market shape the streets, agree quiet periods with businesses and the building manager, and decide early whether you will live in.

Camden: noisy building works and prior consent · Find the council for the property · Hatton Garden conservation area appraisal, adopted September 2017 · LEASE: alterations and home improvements

A clear scope before a price

Plan your renovation budget and quotation

Let a measured survey and a written scope, not the WC1 postcode, drive the price for a Holborn home. Set room work, repairs to original fabric, listed elements and costs that arise from sharing a building on separate lines, so competing quotations line up item by item.

What survives and what needs opening up

Know what is there, and what is hidden, before anyone prices it.

  • Plans drawn from a survey and a dated condition report
  • Original doors, sashes, railings and roof to mend
  • Opening-up for damp, joists and drains

Rooms, fittings and shared services

Specify every room so tightly that two contractors cannot read it differently.

  • Layouts, quantities and chosen finishes
  • Pipework, heat source, fans and wiring
  • Connections to shared stacks, risers and supplies

Approvals, licences and building rules

Include only the approvals and street arrangements your address and design call for.

  • Council decisions, listed building consent and lease licence
  • Party Wall Act steps, if any wall work qualifies
  • Street licences and protection of lifts, halls and stairs

Open items, exclusions and timing of orders

Name each unknown and who bears it before anyone signs.

  • What is provisional, excluded or VAT-rated
  • When sashes, joinery and sanitaryware must be ordered
  • Building control sign-off and a handover file

The Holborn address itself adds no fixed uplift and sets no programme. Ask every contractor to say how VAT, professional fees, consents, street licences and conditions found on opening up are dealt with. A bathroom on its own gets a separate quotation written for that room alone, as a standalone job.

From an idea to a workable scope

Prepare your brief and renovation budget

  1. Describe the building and the rooms

    Send the full address and say whether the home is a mansion-block flat, a flat on an estate or a terraced townhouse, and which council covers it if you know. List the rooms you want to change and add photographs of the entrance, stair, basement or roof and any damp.

  2. Collect the records you already hold

    Gather plans, the lease and the block’s regulations, contact details for the managing agent, and any earlier planning, listed building or building control paperwork. Say whether the building is listed and which conservation area applies, and mention it if the address is near Tottenham Court Road station or St Giles.

  3. Separate what is known from what is not

    Write down what is already decided: repairs you know about, rooms you want rearranged and the finishes you like. Keep a second list of anything that waits on opening up a floor, an engineer’s view of a wall or the freeholder’s answer, so those items can be priced as provisional.

  4. Agree roles before work starts

    Agree who will submit each application or notice, who books inspections and who speaks to the building manager. Work out skips, scaffolding and parking, how lifts, halls and stairs will be protected and whether you will live in during the works, then fix how changes and completion paperwork will be logged.

Ready to take the next step? Send the property address and a short outline of what you want to change.

Discuss your Holborn project

Our Hampstead base, serving Holborn

Talk to our Finchley Road studio

Our studio is in Hampstead on Finchley Road, at NW3 6DN. We serve Holborn from this office. Bring us the practical questions about your house, flat or bathroom and the result you want to achieve.

Contact the studio to discuss your brief and arrange the next step. If you already have drawings, a lease or planning correspondence, tell us what is available.

Book a feasibility visit
Hampstead Renovations
Unit 3 Palace Court
250 Finchley Road
London NW3 6DN

020 7101 3168
contact@hampsteadrenovations.co.uk

Find our studio on Google Maps

Questions before you begin

Renovating in Holborn: practical answers

Can I book a standalone bathroom renovation in Holborn?

Yes. You can bring us one bathroom, an en-suite or a shower room in a Holborn flat or townhouse as a job on its own, without a wider refurbishment around it. Send measurements, photographs and whatever you know about the soil stack, and say whether you will have another bathroom to use while the work is carried out.

Which conservation area covers my Holborn address?

That depends on the exact address. On the Camden side, the southern sub areas of Bloomsbury, the Hatton Garden area and the Kingsway area cover parts of Holborn; across the boundary, the City of London has its own Chancery Lane conservation area. Confirm the council for the full address first, then check that council’s map rather than relying on the WC1 or WC2 postcode.

Camden conservation areas and heritage statements · Bloomsbury conservation area appraisal and management strategy, April 2011 · Hatton Garden conservation area appraisal and management strategy · Kingsway conservation area appraisal and management strategy · City of London: Chancery Lane conservation area SPD, adopted 23 February 2016 · Find the council for the property

Does an Article 4 direction or listing affect my Holborn home?

Check each separately. As of 4 October 2026, Camden’s heritage Article 4 index lists no direction for the Bloomsbury, Hatton Garden or Kingsway conservation areas, but the borough-wide basement direction applies at Camden addresses. Listing is checked address by address: 3–16 Great James Street is Grade II*, and the northern part of the Bourne Estate is Grade II. For a City address, check the City’s own information.

Camden: current heritage Article 4 directions · Camden: borough-wide basement Article 4 direction · Historic England: 3–16 Great James Street and attached railings, Grade II* · Historic England: Bourne Estate (northern part), Grade II · Historic England: listed-building consent · Find the council for the property

Can I replace old sash windows with double glazing?

Start with repair. In the Bloomsbury sub areas, Camden expects original sash windows to be kept and repaired, and replaced only where they are beyond repair. A listed building needs listed building consent for relevant changes, a flat has no Part 1 householder rights to rely on, and the lease may control windows, so compare draught-proofing and secondary glazing before ordering replacements.

Bloomsbury conservation area appraisal and management strategy, April 2011 · Historic England: listed-building consent · Householder permitted development technical guidance · LEASE: alterations and home improvements

My flat is in a mansion block: who has to approve internal changes?

Changing the layout or finishes inside a Holborn flat is not normally development, and planning permission is not usually required. Landlord consent is a separate question: read the lease for any requirement for written consent and its conditions. Where the block is listed, as part of the Bourne Estate is, listed building consent may be required for internal work that affects its special interest, and the Building Regulations apply regardless.

When planning permission is required · LEASE: alterations and home improvements · Historic England: Bourne Estate (northern part), Grade II · Historic England: listed-building consent · When Building Regulations approval is needed

Can I take down a wall or move the bathroom to another room?

Start with the structure: an engineer should say whether the wall carries load and which way the joists span. Then map the waste, water and extract routes to the proposed bathroom position. In a mansion block, check the lease, the shared stack and the sound requirements between flats. In a terraced townhouse, check whether the work is notifiable under the Party Wall Act and whether listing reaches the interior.

When Building Regulations approval is needed · LEASE: alterations and home improvements · GOV.UK: Approved Document E, resistance to sound · Party-wall work requiring notice · Historic England: listed-building consent

Can I dig out or extend a basement under a Holborn building?

Updating a basement that already exists is one thing; digging a new or deeper one is another. At a Camden address every basement excavation needs planning permission, and a new or extended basement needs a Basement Impact Assessment. Hatton Garden’s appraisal generally resists new front lightwells and places much of that area in the London Suburbs archaeological priority area, where a desk-based assessment will be required.

Camden: borough-wide basement Article 4 direction · Camden: basement development and impact assessments · Hatton Garden conservation area appraisal, adopted September 2017

When can noisy building work take place in Holborn?

Under Camden’s published hours, noisy work needs no authorisation from 8am to 6pm on weekdays and 8am to 1pm on Saturdays, and is not allowed on Sundays or bank holidays without it. At other times it needs Camden’s prior consent under section 61 of the Control of Pollution Act 1974, sought 28 days or more ahead. City of London and Westminster addresses follow their own council’s rules.

Camden: noisy building works and prior consent · Find the council for the property

Two Holborn quotations differ widely: how do I compare them?

Line them up item by item: the same rooms, quantities, repairs and finishes should appear in both, and each should state its provisional sums, exclusions and VAT. Ask how sash and railing repairs, listed fabric, protection of common parts, licences and consents are priced. Neither should treat the Holborn postcode as a reason for an uplift or a fixed finish date; resolve the big unknowns first, then agree the order of work.

Which office handles Holborn enquiries, and what should I send?

The studio is at Unit 3 Palace Court, 250 Finchley Road, London NW3 6DN; there is no Holborn office, and we serve Holborn from this one. To begin, tell us the address and the rooms you would change, and attach some photographs plus any plans, lease extracts or planning papers you have, with a note of your budget priorities.

Book a feasibility visit

We reply within one working day, Monday to Friday, 8am to 6pm.

Consultations by appointment

Private consultations near Sloane Square

We offer renovation consultations by appointment at 2 Eaton Gate for Central and South West London clients.

This gives clients a convenient Prime Central London meeting location for high-end refurbishments, listed homes, conservation properties, basements, extensions and full home renovations.

Client Reviews
“

I would like to thank Ross and his team for their consistent commitment to quality and their unerring reliability. They delivered our property to specification and on time, proving to be an extremely effective, experienced, and proactive contractor.

JW
James WardInvestment Director, Belgravia
“

We have worked with Ross and his company many times. They are extremely professional and hardworking individuals who can work under any circumstances. There was no variation to the works.

CR
Cirus RehmanFinance Director, Grosvenor Street, Mayfair
“

A company where you get value for your money while at the same time achieving excellent quality. Their work is carried out on time and within budget. We've worked with them on multiple projects and they never disappoint.

BI
Brian InghamDirector, Green Evolution Limited
Independent
Surveying
Hampstead Renovations operates alongside Hampstead Chartered Surveyors & Building Consultancy — a firm providing chartered building surveying, fire safety and project advisory services, under shared directorship. Both practices are covering Holborn WC1, giving our clients local professional oversight from survey through to handover.
Other areas we serve
Design-Build in Holborn

Looking for a Local Builder in Holborn?

One team, one contract — from feasibility drawing to handover photograph. Our in-house architects, designers and structural engineers, surveying support through Hampstead Chartered Surveyors & Building Consultancy, and our own build teams, all under a fixed-price design-build contract.

View Our Holborn Builders Page
Central London overview
Property Refurbishment Company in Central London →

See how Holborn fits within our wider Central London refurbishment service — house, flat and apartment refurbishment, extensions, lofts, basements and listed work under one team.

Full Service Directory

Services relevant to Holborn, WC1

Explore 8 service routes for Holborn properties, grouped by project type and delivered by the same design-build team.

Loft Conversions

Loft Conversions in Holborn →

Extensions

House Extensions in Holborn →

Basements

Basement Conversions in Holborn →

Refurbishment

House Refurbishment in Holborn →

Flat refurbishment

Kitchens

Kitchen Renovation in Holborn →

Bathrooms

Bathroom Renovation in Holborn →

Interiors & Joinery

Bespoke Joinery in Holborn →

Chat with us!