In a Knightsbridge mansion flat the lease comes first: Cadogan says the ability to alter a home on its estate is set by the lease, and that in some cases a lease may prohibit alterations altogether. In a listed building, RBKC adds recessed lighting, vents and removing floorboards to the works that need listed building consent, so both are checked before fittings are chosen.
Lease, listing and regulations for a Knightsbridge bathroom
Where Cadogan's consent is needed for a leaseholder's proposals, Cadogan says the leaseholder must apply for a Licence to Alter. LEASE advises more generally that, depending on the lease, a leaseholder might need the landlord's permission before any alteration, even once building regulations approval has been given.
Listing reaches inside the room. RBKC says the whole of a listed building, its interior and internal features included, is protected, and its list of changes needing consent takes in re-plastering, taking up floorboards, suspended ceilings, recessed lighting and vents; carrying out such work without consent is a criminal offence. In Westminster, City Plan Policy 44 sets out to protect original or significant detail and historic fabric in listed buildings.
Gov.uk lists a straight swap of bath, WC, basin or sink as exempt from building regulations approval, but not new power or lighting points or circuit changes beside a bath or shower, nor work on a heating system.
Sources: Cadogan: residential customer welcome, LEASE: alterations and home improvements, Royal Borough of Kensington and Chelsea: listed buildings explained, Westminster City Plan 2019-2040 (2026, adopted January 2026), GOV.UK: when you don't need building regulations approval
Extract routes and lower floors
An extract fan has to discharge somewhere. In Hans Town the statement says fanlights should never be panelled over or used for services such as flues or air conditioning units, and in a listed building RBKC counts vents among the works that need consent.
Where a bathroom is part of new basement space in Kensington and Chelsea, Policy CD11 requires the basement to be protected from sewer flooding by a suitable pumped device; a non-return valve on its own will not do, the Local Plan explains, since it does not carry sewage away from the building.
Sources: Royal Borough of Kensington and Chelsea: Hans Town Conservation Area Proposals Statement (adopted January 2000), Royal Borough of Kensington and Chelsea: listed buildings explained, Royal Borough of Kensington and Chelsea: Local Plan (adopted July 2024)
Bathrooms in Westminster-side terraces, mews and mansion flats
Terraces on the Westminster side typically stand three to five floors high over a lower floor, behind railed lightwells, and Montpelier Square's houses have four storeys and a basement, Westminster's audit records. A bathroom can go on almost any of those floors, but its waste has to reach the drain at the bottom of the house.
The mews behind the main frontages are low, usually two floors, and as wide as the house they once served; the audit picks out the L-shaped mews behind Ennismore Gardens as particularly well kept. In a mews house a new bathroom usually goes on the first floor, above the former coach house.
Mansion flat blocks replaced houses from the late Victorian period, and many surviving houses have since been divided into flats, the audit notes. In either case the bathroom sits on a stack it shares with the homes above and below.
In the artisans' quarter between the formal squares, rooms are compact and a bathroom has to be planned to the centimetre.
Where a bathroom is moved to a new floor, we trace the route of the new waste through the house before design, so it does not cut through decorative ceilings or original joists.
In a house of five floors, water pressure at the top is tested at the first visit, because it decides whether a shower needs a pump and where that pump can be housed quietly.
Source: Westminster City Council: Knightsbridge, Knightsbridge Green and Albert Gate conservation area audit (SPD, adopted 20 April 2009)
Strip-out, deliveries and neighbours
A bathroom refit inside the existing walls counts in RBKC's code as Category 3, mainly decorative internal work.
Westminster applies lower noise thresholds to all permitted activities on Saturdays, and no noisy work may take place outside the prescribed hours unless prior consent has been obtained under Section 61 of the Control of Pollution Act 1974.
Sources: Royal Borough of Kensington and Chelsea: Code of Construction Practice (April 2019), Westminster City Council: Code of Construction Practice (May 2026)
How we run a Knightsbridge bathroom project
We start with a feasibility visit, measure the room and trace the waste, water and extract routes, then read the lease and any list entry before the layout is fixed. Our in-house designers and architects draw the room, and where a floor or wall is structural our in-house structural engineers design the change.
You receive a written quotation after the visit, with No Deposit Required, and the strip-out is booked within the hours of the council for the address.
Knightsbridge bathrooms: questions
Does a bathroom refit in a Cadogan flat need a Licence to Alter?
If the lease requires Cadogan's consent for the work, yes. Cadogan says the lease's terms define what can be altered and in some cases may prohibit alterations altogether; where its consent is needed, the leaseholder applies for a Licence to Alter.
Do recessed lights or an extract need listed building consent?
In a listed building in Kensington and Chelsea, yes: RBKC lists recessed lighting and vents among the smaller changes that need listed building consent. In Westminster, City Plan Policy 44 expects works to a listed building to preserve its special interest and historic fabric.
Can the noisy strip-out happen on a Saturday?
Not on the Kensington and Chelsea side: RBKC's construction code stopped noisy Saturday work, and only the council's written permission, given in advance, allows it. In Westminster, building work is allowed from 8am to 1pm on Saturdays, with lower noise thresholds than on weekdays.
Does replacing a bath need building regulations approval?
Not for like-for-like fittings: gov.uk lists swapping a bath, toilet, basin or sink as exempt. New power or lighting points around the bath or shower, and work on the heating system, are outside that exemption.
How much does a bathroom renovation cost in Knightsbridge?
The position of the soil stack is the first thing that prices a Knightsbridge bathroom, because moving a WC away from it means a longer fall through the floor. After that come the floor build-up needed for waterproofing and heating, the extract route, whether the lease or a listing restricts the work, and the stone chosen. At a feasibility visit we check all of these; with the scope and specification agreed you receive a written quotation.
Sources: Cadogan: residential customer welcome, Royal Borough of Kensington and Chelsea: listed buildings explained, Westminster City Plan 2019-2040 (2026, adopted January 2026), Royal Borough of Kensington and Chelsea: Code of Construction Practice (April 2019), Royal Borough of Kensington and Chelsea: construction site enforcement, Westminster City Council: noise problems we can investigate, Westminster City Council: Code of Construction Practice (May 2026), GOV.UK: when you don't need building regulations approval
Bathrooms in Knightsbridge and nearby
Two more bathrooms of the same kind, from apartments nearby:
Rooms and elevations typical of Knightsbridge
Design, joinery and the build, under one contract in Knightsbridge
The same team stays with the project from the first visit to handover. Our in-house architects, designers and structural engineers draw and specify the work. Master joiners make the fitted furniture. Building Regulations approval comes from the building control body appointed for the project. Independent surveying is a separate appointment: Hampstead Chartered Surveyors & Building Consultancy, our RICS-regulated sister practice, is a separate firm that a homeowner instructs directly. One JCT contract covers the building work. Electrical and gas work is carried out by appropriately registered engineers. Completed structural work carries a 12-month aftercare/defects period. Cover is £5M public liability, £10M employers' liability and contractors' all risks cover. Main office: 250 Finchley Road, Hampstead, London NW3 6DN. Central London client consultation address: 2 Eaton Gate, Belgravia, London SW1W 9BJ. Telephone 020 7101 3168.
Licence to alter · Independent surveying by our sister practice
What clients have said about the work
I would like to thank Ross and his team for their consistent commitment to quality and their unerring reliability.
We have worked with Ross and his company many times. They are extremely professional and hardworking individuals who can work under any circumstances. There was no variation to the works.
Verified Planning, Estate & Conservation Sources
- Cadogan: residential customer welcome
- LEASE: alterations and home improvements
- Royal Borough of Kensington and Chelsea: listed buildings explained
- Westminster City Plan 2019-2040 (2026, adopted January 2026)
- GOV.UK: when you don't need building regulations approval
- Royal Borough of Kensington and Chelsea: Hans Town Conservation Area Proposals Statement (adopted January 2000)
- Royal Borough of Kensington and Chelsea: Local Plan (adopted July 2024)
- Westminster City Council: Knightsbridge, Knightsbridge Green and Albert Gate conservation area audit (SPD, adopted 20 April 2009)