Skip to main content

Golders Green · Houses, flats & bathrooms

Golders Green Renovations & Design-Build — NW11

Early twentieth-century houses, parades and mansion flats

Golders Green homes range from houses on the roads laid out from 1907 to flats above shopping parades and apartments in mansion blocks. Whichever you live in, shape your plans for the house, flat or bathroom around that building, with layout, services and consent questions settled in one clear brief.

Serving Golders Green from our Hampstead studio · NW3 6DN
020 7101 3168

Hampstead Renovations design and build studio on Finchley Road
Our Hampstead studio · Finchley Road, NW3 6DN

Start with your project

Choose the work your Golders Green home needs

Choose a focused room renovation or a coordinated refurbishment. Each service page explains the scope in more detail and gives you a direct route to discuss the work.

01 Early twentieth-century houses

House refurbishment in Golders Green

Start by establishing what survives from the original house and what later owners have changed. Then plan structural alterations, kitchens, bathrooms, heating and finishes as one coordinated project, treating any extension, roof work or front-garden change as a separate item with its own consent check and price.

  • Survey what is original and what has been altered
  • Test new layouts against the structure and services
  • Check the address for conservation, Article 4 and tree controls
Explore house refurbishment in Golders Green

02 Mansion blocks and parade flats

Flat renovation in Golders Green

A flat above a parade or in a mansion block can share structure, entrances and services with neighbouring homes or shops. Read the lease and any managing-agent rules early, and let them shape the bathroom position, floor finishes, sound insulation and the route for deliveries through common parts.

  • Read the lease before the layout is drawn
  • Locate shared stacks, risers and isolation valves
  • Agree how stairs and entrances will be protected
Explore flat refurbishment in Golders Green

03 Standalone bathrooms and en-suites

Bathroom renovation in Golders Green

We welcome a standalone bathroom renovation as much as a whole-home project, whether it is a family bathroom, an en-suite or a shower room. The design follows the floor construction and the routes for water, waste and extraction, with waterproofing, lighting, tiling and fittings chosen to suit how the room is used.

  • Confirm where waste, water and extract air can go
  • Choose a waterproofing system that suits the floor
  • Plan washing arrangements while your only bathroom is out of use
Explore bathroom renovation in Golders Green

Space, light and considered storage

Loft conversions, house extensions and bespoke joinery in Golders Green

Compare a loft conversion, house extension or bespoke joinery for your Golders Green home against the building, its tenure and Barnet’s current guidance before you settle the brief.

Loft conversions

Turn the roof space of a Golders Green house into a bedroom, study or family room, testing the stair, headroom and daylight before choosing between a dormer, rooflights or another roof alteration.

Dormer guidance in Barnet’s SPD

Barnet’s SPD says front dormer windows will generally not be supported (para 4.85). Where a rear dormer is not permitted development, it should be inset at least 0.5 metres from the eaves, ridge and edges of the original roof (para 4.87).

Rooflights and the Suburb directions

In a conservation area, the SPD asks for ‘conservation type’ rooflights that fit flush with the roof slope (para 4.102). Where a Hampstead Garden Suburb direction applies, rights for other alterations to the roof are withdrawn, so check the address first.

Loft conversions

House extensions

Add a larger kitchen, dining space or family room to a Golders Green house while keeping a useful garden and relating the addition to the original rear and side of the home.

Rear depth, garden and height

Barnet’s SPD gives maximum single-storey rear depths of 3 metres for terraced, 3.5 metres for semi-detached and 4 metres for detached houses, no more than half the garden’s length, and a height of up to 4 metres with eaves no higher than 3 metres.

Side extensions and corner plots

Barnet’s SPD says a single-storey side extension should be no more than half the width of the original home (para 4.58), and on a corner site it should be set in 1 metre from the boundary (para 4.65).

  • Barnet SPD Part 4: residential extensions and alterations
House extensions

Bespoke joinery

Get built-in storage for a Golders Green house or flat, from bedroom wardrobes to living-room shelving, drawn from measured rooms and planned around original details and the pipes or meters that need access.

Flats in the listed parades

The Cheapside and The Promenade parades are listed Grade II. Before replacing windows, doors or fitted interiors in a flat there, check whether the work affects special interest and needs listed building consent.

  • Golders Green Town Centre Conservation Area appraisal, August 2011
  • Historic England: listed building consent

Shared parts and entrance doors

In a mansion block or a flat above a shop, check what the lease says about entrance doors, shared stairs and common parts. Changing a fire-resisting entrance doorset is a separate technical question from fitting internal storage.

  • LEASE: alterations and home improvements
  • GOV.UK: Approved Document B FAQs
Bespoke joinery

Plan the structure and the fitted details together

Tell us how you want to use the space, what needs to stay and which drawings or permissions you already have. A measured brief can connect the roof or extension layout with stairs, storage, lighting and joinery before specifications are priced.

Discuss your project

Real projects, clearly located

Ideas for your Golders Green refurbishment

Photographs of our work elsewhere in London

Explore a whole house in Belsize Park, an apartment on Chesterfield Street in Mayfair and a bathroom in Pimlico. Use these examples to discuss the scale of work and finishes you have in mind for your own home.

More London project records: Carlton Lodge, Belgravia · King’s Road, Chelsea.

Our in-house architects, designers and structural engineers
Structural
Engineering Calculations
Planning
Applications & Consents
Building Control
Compliance Support
Leasehold
Licence for Alteration
£5M
public liability, £10M employers' liability and contractors' all risks cover

Local knowledge with a purpose

Understand the building before changing it

Establish what kind of building you have before choosing finishes. An early twentieth-century house, a flat above a listed parade and a 1930s mansion-block apartment each raise different questions about fabric, tenure and consent.

Barnet’s August 2011 appraisal of the Golders Green Town Centre Conservation Area records that development began about two years before the station opened in 1907. Between 1907 and 1911 roads were laid out and some 744 homes built, and the appraisal describes two building phases, 1907–1918 and 1924–30. Record the age, construction and later alterations of your own building rather than assuming one local type.

Golders Green Town Centre Conservation Area appraisal, August 2011

Barnet describes the conservation area as the town centre together with the railway and bus/coach station. The appraisal identifies parades of shops with apartments and flats above as the main building type and counts seven listed buildings; the Cheapside and The Promenade parades, 78 retail units in all, are listed Grade II. For a flat above a shop, the survey brief should also cover any listing, the lease terms and the shared services.

Barnet: Golders Green conservation area · Golders Green Town Centre Conservation Area appraisal, August 2011 · Historic England: listed-building consent · LEASE: alterations and home improvements

Other buildings raise their own questions: West Heath Court, built in 1936, is a five-storey block of mansion flats in brick and stone, and The Parade on North End Road is two storeys in red brick with slate and lead roofs. Much of Golders Green is residential streets, so check whether your address is inside a conservation area on Barnet’s maps.

Golders Green Town Centre Conservation Area appraisal, August 2011 · Barnet conservation areas, appraisals and maps · Golders Green conservation area boundary map

The first local check

Let the address, not the NW11 postcode, decide

Golders Green describes where we work, not the rules for a particular home. Confirm the council through the official lookup, then check Barnet’s conservation maps, the Golders Green boundary map, the listing, any Article 4 direction and the planning history; neither the neighbourhood name nor an NW11 postcode settles the conservation boundary or the consent route.

Find the council for the property · Barnet conservation areas, appraisals and maps · Golders Green conservation area boundary map · Article 4 directions in Barnet · Historic England: listed-building consent

Separate checks, one coordinated brief

Planning, listed buildings, building control and leases

One approval does not settle every requirement. Identify the applicable routes before ordering work, and record who will prepare submissions, arrange inspections and provide the relevant completion information.

When planning permission is needed

Does the work need planning permission at all?

Work affecting only the interior of a home is generally not development and needs no planning permission. Extensions, roof alterations, other external changes and changes of use are assessed separately. Flats, including those above the parades, have no Part 1 householder permitted development rights; for a house, check the limits, any conditions on earlier permissions and whether an Article 4 direction covers the address.

When planning permission is required · Householder permitted development technical guidance · Article 4 directions in Barnet

Listed buildings and conservation areas

Does a listing or conservation designation affect the work?

Listed buildings in Golders Green include the Grade II Clock Tower War Memorial on Golders Green Road, unveiled in 1923, and the Grade II Cheapside and The Promenade parades. Work inside a listed building, not only outside it, can need listed building consent where it affects special architectural or historic interest. Conservation-area designation is a separate control, so check both for the building.

Historic England: Clock Tower War Memorial, list entry 1259680 · Golders Green Town Centre Conservation Area appraisal, August 2011 · Historic England: listed-building consent · Barnet conservation areas, appraisals and maps

Building Regulations and inspections

Which inspections and completion records apply?

Building Regulations can apply to several parts of a refurbishment, including structural alterations, new drainage, ventilation, electrical work and replacement windows. Agree whether building control or a registered competent person will cover each element, when inspections take place and who keeps the completion records. None of this is settled by planning permission, listed building consent or a landlord’s approval.

When Building Regulations approval is needed · Barnet building regulations approval

Lease consent and Party Wall procedures

What does the lease require, and do neighbour notices apply?

If the home is a flat above a shop or in a mansion block, the lease may require the landlord’s written consent and set conditions for floors, services and common parts. The Party Wall Act is a separate question, engaged only by qualifying work such as work to a shared wall or excavation near a neighbour’s foundations; a bathroom refit does not automatically need a Licence to Alter or a Party Wall notice.

LEASE: alterations and home improvements · Party-wall work requiring notice

Local facts that affect the brief

Apply the controls to the work you actually need

Designated March 1998; appraisal dated August 2011

Golders Green Town Centre Conservation Area

Barnet designated the Golders Green Town Centre Conservation Area in March 1998 and publishes a character appraisal and management proposals dated August 2011, with a boundary map. Barnet notes that, of over 16,000 people living in the Golders Green area, approximately 400 live within this conservation area; that figure does not show whether another designation covers your home.

Barnet: Golders Green conservation area · Golders Green Town Centre Conservation Area appraisal, August 2011 · Golders Green conservation area boundary map

The Hampstead Garden Suburb conservation area adjoins it. Designated in 1968 and later extended to include Golders Green Crematorium, it extends on its western side to the east side of Finchley Road. Barnet also lists Hampstead Village (Heath Passage), another adjoining conservation area. Use the published maps for the address rather than a street name or postcode.

Barnet: Hampstead Garden Suburb conservation area · Barnet conservation areas, appraisals and maps

None in the Town Centre area; Suburb directions separate

Check which Article 4 direction, if any, applies

The 2011 appraisal says an Article 4 direction is not applied in the Golders Green Town Centre Conservation Area. Barnet’s Hampstead Garden Suburb directions are different: they withdraw permitted development rights for the enlargement, improvement or other alteration of a house, other roof alterations, porches, hard surfaces, boundary walls and gates, exterior painting and more, for addresses inside the Suburb.

Golders Green Town Centre Conservation Area appraisal, August 2011 · Hampstead Garden Suburb Article 4 directions

A direction removes specified rights for specified land; it does not turn every internal job into a planning matter. From 29 May 2016, planning permission has been required anywhere in Barnet to change a house into a small house in multiple occupation, which is not ordinary householder work. Match the property and the proposed work to the operative direction.

Article 4 directions in Barnet · When planning permission is required

Local Plan adopted 4 March 2025; SPD adopted 15 June 2026

Use Barnet’s current plan and design guidance

Barnet adopted its Local Plan 2021–2036 on 4 March 2025. The plan treats Golders Green as one of the borough’s district town centres, and Policy GSS08 names it among five centres that form the council’s priorities for investment and revitalisation. Apply the adopted policies to the actual address and the whole proposal.

Barnet Local Plan 2021–2036 · Barnet Local Plan adoption statement, 4 March 2025

Barnet adopted the Sustainable Design and Development Guidance SPD on 15 June 2026, replacing the 2016 Residential Design Guidance SPD. Its Part 4 covers residential extensions and alterations, including rear and side extensions, dormers, rooflights and basements. Check proposals against this current guidance rather than advice written around the superseded document.

Barnet Sustainable Design and Development Guidance SPD, adopted 15 June 2026 · Barnet SPD Part 4: residential extensions and alterations

Local Plan Policy CDH06 and SPD Part 4

Separate a lower-ground refit from new excavation

Refitting a bathroom inside an existing lower-ground room is a different brief from excavating a new basement, extending one or adding a lightwell. Policy CDH06 expects basement proposals to keep trees and tree roots of value from damage and to be subordinate in size to the building being extended. The SPD adds depth limits of 3, 3.5 and 4 metres by house type and excavation of no more than half the rear garden’s length.

Barnet Local Plan 2021–2036 · Barnet SPD Part 4: residential extensions and alterations

Agree the structural, ground and drainage investigations before fixing a design or excavation method, and identify any qualifying Party Wall procedure early. Treat the long-term flood-risk check as a starting point only; evidence from your own site decides what is feasible.

When Building Regulations approval is needed · Party-wall work requiring notice · Check long-term flood risk in England

Settle which approvals apply before any windows are ordered, the roof is altered or excavation is booked. Planning permission, listed building consent, conservation-area and Article 4 controls, Building Regulations, lease consent and Party Wall procedures are separate regimes, and informal advice from the council does not amount to a decision.

When planning permission is required · Historic England: listed-building consent · Article 4 directions in Barnet · When Building Regulations approval is needed · LEASE: alterations and home improvements · Party-wall work requiring notice

Local guidance checked . The linked sources help you prepare a brief; requirements depend on the address, building and complete proposal.

From retained details to shared services

Original details, flats above shops and the wider building

Windows, doors and listed frontages

Once each window and door has been surveyed for condition and profile, weigh repair, draught-proofing and secondary glazing against replacement. A listed parade can need listed building consent for changes, and where a Hampstead Garden Suburb direction applies, alterations to a house can need permission. New windows can also engage Building Regulations, so confirm every route before ordering.

Historic England: listed-building consent · Hampstead Garden Suburb Article 4 directions · When Building Regulations approval is needed

Bathroom routes, moisture and shared stacks

A bathroom layout only works if the waste can fall to a stack, water can reach the fittings and moist air has a route outside. Above a shop or in a mansion block, find out where shared stacks run and how supplies are isolated without cutting off neighbours. Keep valves and traps accessible, and trace the cause of any staining before new finishes go on.

When Building Regulations approval is needed · LEASE: alterations and home improvements

Floor build-up, sound and loads

Stone, large-format tiles and new timber floors add weight and change how sound travels, so investigate the existing floor before choosing them. In a flat above a parade or within a mansion block, weigh structural capacity, acoustic performance and the lease’s terms together. Approved Document E sets standards for relevant building work rather than one rule for every existing flat.

GOV.UK: Approved Document E, resistance to sound · When Building Regulations approval is needed · LEASE: alterations and home improvements

Protected trees and front gardens

Barnet requires written notice six weeks before work to trees in a conservation area, and an application for work to a tree with a preservation order can take up to eight weeks. Allow for both if trees stand near the work, the skip position or a new foundation. National conditions apply to new front hard surfaces, and the Suburb directions withdraw some hard-surface rights.

Barnet protected trees and tree works · Tree preservation orders and conservation-area trees · Householder permitted development technical guidance · Hampstead Garden Suburb Article 4 directions

Existing lower floors and new basements

While a lower-ground room is still being planned, look for signs of damp, check how it drains and record the existing levels. Digging a new or larger basement is a different scale of work: commission site-specific structural, ground and drainage investigations and test the design against Policy CDH06 and the SPD. A neighbour’s experience or a flood-map result cannot stand in for that evidence.

Barnet Local Plan 2021–2036 · Barnet SPD Part 4: residential extensions and alterations · Check long-term flood risk in England · When Building Regulations approval is needed

Comfort and energy across the whole house

Insulation changes how a building handles moisture, so decide heating, ventilation and insulation as one package. Historic England’s whole-building approach for historic buildings is a useful reference for an older house. Before choosing external plant, solar panels or flues, check what the address allows: the Suburb’s Article 4 directions and a parade’s listing each need their own check.

Historic England: a whole-building approach · Householder permitted development technical guidance · Hampstead Garden Suburb Article 4 directions · Historic England: listed-building consent

A practical plan for the street and building

Working hours, deliveries and shared access

Access, licences and skips

Plan how materials and waste will move between the street and the room, and how shared entrances will be protected. Barnet requires a highways licence wherever works use or infringe upon the public highway or footway, such as scaffold or hoarding. Only registered skip companies are licensed to place skips on the highway, and a skip licence needs an approved bay suspension first, so apply well in advance and check the current notice period.

Barnet highways licences and skip licences · Barnet parking suspensions and dispensations · LEASE: alterations and home improvements

Working hours, neighbours and occupation

Barnet’s published construction working hours are Monday to Friday, 8am to 6pm, and Saturday, 8am to 1pm, with no work at any time on a Sunday or Bank Holiday; the council says this also applies to householders extending their own home. A lease or building may set tighter rules. If you live at home during the work, plan which rooms stay usable, when supplies will be off and how neighbours will be told.

Barnet construction working hours · LEASE: alterations and home improvements

A clear scope before a price

Plan your renovation budget and quotation

Quotations can only be compared fairly when they describe the same scope. Start from the building’s condition, and price the rooms separately from the roof, structure, outside works and anything involving the shared building.

Existing condition and original details

List what is already known to need repair and what can only be confirmed by opening up.

  • A measured survey and record of condition
  • Original windows, joinery and features to keep
  • Opening-up for damp, structure or hidden services

Room scope, finishes and services

Specify each room clearly enough that every contractor is pricing identical work.

  • Room layouts, fittings and finish choices with quantities
  • Plumbing, heating, ventilation and electrical work
  • Built-in joinery, access panels and items you supply

Approvals and site arrangements

Allow for the consents, notices and street arrangements your particular proposal involves.

  • Planning, listed building, lease and Party Wall requirements
  • Highways licence, skip and bay-suspension arrangements
  • Protection of shared areas and any temporary facilities

Written allowances and the sequence

Put open decisions, exclusions and who does what in writing before the contract is signed.

  • VAT treatment, exclusions and provisional sums
  • Order dates, supplier lead times and how changes are priced
  • Inspection stages, certificates and the handover pack

A Golders Green location does not add a fixed premium or set a programme. Ask each contractor to explain VAT, professional fees and how unknown conditions will be dealt with. A standalone bathroom is quoted on its own, room-specific basis rather than as a share of a larger refurbishment.

From an idea to a workable scope

Prepare your brief and renovation budget

  1. Describe the home and what you want to change

    Tell us the full address and what kind of home it is, whether a house, a flat above a shop or a mansion-block apartment. Photographs help most when they show the rooms to change, the way in and up through the building, any features to keep and any damp or plumbing concerns.

  2. Find the paperwork you already have

    Look out existing drawings, the lease, any managing-agent rules and past planning decisions or building-control certificates. If you already know the building is listed, in a conservation area or covered by an Article 4 direction, say so, and mention shared drains and nearby trees.

  3. Separate repairs, improvements and taste

    Decide which items are repairs, which are improvements and which are matters of taste. Where the answer depends on what is hidden, arrange a measured survey, opening-up or a structural, drainage or tree assessment before quantities are fixed, so quotations compare like with like.

  4. Assign responsibilities before work starts

    Before work starts, name the person responsible for each consent, notice, street licence and inspection. Build the sequence around deliveries, protection of shared parts, the council’s working hours and whether you stay at home, and agree in writing how changes and the handover documents will be handled.

Ready to take the next step? Send the property address and a short outline of what you want to change.

Discuss your Golders Green project

Our Hampstead base, serving Golders Green

Talk to our Finchley Road studio

Our studio is in Hampstead on Finchley Road, at NW3 6DN. We serve Golders Green from this office. Bring us the practical questions about your house, flat or bathroom and the result you want to achieve.

Contact the studio to discuss your brief and arrange the next step. If you already have drawings, a lease or planning correspondence, tell us what is available.

Book a feasibility visit
Hampstead Renovations
Unit 3 Palace Court
250 Finchley Road
London NW3 6DN

020 7101 3168
contact@hampsteadrenovations.co.uk

Find our studio on Google Maps

Questions before you begin

Renovating in Golders Green: practical answers

Do you take on standalone bathroom renovations in Golders Green?

Yes. We take on a single family bathroom, en-suite or shower room as its own project, not only as part of a larger refurbishment. Start by sending measurements, photographs and the current layout. In a flat above a shop or a mansion block, mention any shared stacks, and tell us if the household has no other bathroom.

Does the Golders Green conservation area cover every NW11 home?

No. Barnet’s Golders Green Town Centre Conservation Area, designated in March 1998, covers the town centre together with the railway and bus/coach station. Hampstead Garden Suburb and Hampstead Village (Heath Passage) are separate adjoining conservation areas. Much of Golders Green is residential streets, so check whether the full address falls inside any conservation area on Barnet’s maps.

Barnet: Golders Green conservation area · Golders Green conservation area boundary map · Barnet conservation areas, appraisals and maps · Barnet: Hampstead Garden Suburb conservation area

Do Article 4 directions apply in Golders Green?

It depends on the address. The 2011 appraisal says an Article 4 direction is not applied in the Town Centre Conservation Area. Inside Hampstead Garden Suburb, Barnet’s directions withdraw rights for alterations to a house, roof changes, porches, hard surfaces, boundary walls and gates, exterior painting and more. Since 29 May 2016, changing a house to a small HMO has needed permission anywhere in Barnet.

Golders Green Town Centre Conservation Area appraisal, August 2011 · Hampstead Garden Suburb Article 4 directions · Article 4 directions in Barnet

What should I check before replacing windows or adding double glazing?

Survey the existing frames first; repair, draught-proofing or secondary glazing may meet your aims without replacement. Flats have no Part 1 householder rights, so external changes need their own planning check; a listed parade may need listed building consent; and where a Hampstead Garden Suburb direction applies, alterations to a house can need permission. New windows can also engage Building Regulations.

Householder permitted development technical guidance · When planning permission is required · Historic England: listed-building consent · Hampstead Garden Suburb Article 4 directions · When Building Regulations approval is needed

Will I need planning permission to renovate the inside of my flat?

Usually not for purely internal work, which is generally not development. Anything external, an extension or a change of use is a different matter, and flats have no Part 1 householder permitted development rights to fall back on. In a listed parade, listed building consent may still be needed for interior changes affecting special interest; Building Regulations and lease consent are separate checks.

When planning permission is required · Householder permitted development technical guidance · Historic England: listed-building consent · When Building Regulations approval is needed · LEASE: alterations and home improvements

Can I move the bathroom or remove a wall in my Golders Green home?

Possibly, but establish the facts first. An engineer can confirm whether the wall carries load and how the floor is built. A new bathroom position needs a workable waste fall, water supply and extract route, which may involve a shared stack in a flat. Lease terms, Building Regulations and any Party Wall procedure also need checking.

When Building Regulations approval is needed · LEASE: alterations and home improvements · Party-wall work requiring notice

How is a new basement treated differently from a lower-ground refit?

A refit works within a room that already exists, whereas excavating, lowering a floor, extending a basement or adding a lightwell is new basement work. For a Barnet address, Policy CDH06 and the SPD then become relevant: protecting trees and roots of value, a size subordinate to the building, depth limits by house type and excavating no more than half the rear garden’s length.

Barnet Local Plan 2021–2036 · Barnet SPD Part 4: residential extensions and alterations · When Building Regulations approval is needed

Which hours does Barnet set for noisy building work?

For a Barnet address, the council’s published construction working hours are Monday to Friday, 8am to 6pm, and Saturday, 8am to 1pm, and at no time on a Sunday or Bank Holiday. The council says this also applies to householders extending their own home. Check any stricter lease or building rules before setting the programme.

Barnet construction working hours · LEASE: alterations and home improvements

What makes two renovation quotations comparable?

Line the quotations up against one written scope: the same rooms, quantities, services and finishes, with original details to keep and repair allowances spelt out. Ask how each treats VAT, professional fees, permissions, licences, protection and temporary facilities. Investigate the main unknowns first; a Golders Green address does not by itself fix a surcharge or a completion date.

Where is your studio, and what do you need from me to begin?

Our studio is at Unit 3 Palace Court, 250 Finchley Road, London NW3 6DN, and we serve Golders Green from this office. To start, share the address, a short list of the rooms involved, photographs and any drawings, lease or planning papers, together with your priorities for the budget.

Client Reviews
“

I would like to thank Ross and his team for their consistent commitment to quality and their unerring reliability. They delivered our property to specification and on time, proving to be an extremely effective, experienced, and proactive contractor.

JW
James WardInvestment Director, Belgravia
“

We have worked with Ross and his company many times. They are extremely professional and hardworking individuals who can work under any circumstances. There was no variation to the works.

CR
Cirus RehmanFinance Director, Grosvenor Street, Mayfair
“

A company where you get value for your money while at the same time achieving excellent quality. Their work is carried out on time and within budget. We've worked with them on multiple projects and they never disappoint.

BI
Brian InghamDirector, Green Evolution Limited
Independent
Surveying
Hampstead Renovations operates alongside Hampstead Chartered Surveyors & Building Consultancy — a firm providing chartered building surveying, fire safety and project advisory services, under shared directorship. Both practices are based in Hampstead NW3 6DN, giving our clients local professional oversight from survey through to handover.
Design-Build in Golders Green

Looking for a Local Builder in Golders Green?

One team, one contract — from feasibility drawing to handover photograph. Our in-house architects, designers and structural engineers, surveying support through Hampstead Chartered Surveyors & Building Consultancy, and our own build teams, all under a fixed-price design-build contract.

View Our Golders Green Builders Page
Prime North London overview
Property Refurbishment Company in Prime North London →

See how Golders Green fits within our wider Prime North London refurbishment service — house, flat and apartment refurbishment, extensions, lofts, basements and listed work under one team.

Full Service Directory

Services relevant to Golders Green, NW11

Explore 8 service routes for Golders Green properties, grouped by project type and delivered by the same design-build team.

Loft Conversions

Loft Conversions in Golders Green →

Extensions

House Extensions in Golders Green →

Basements

Basement Conversions in Golders Green →

Refurbishment

House Refurbishment in Golders Green →

Kitchens

Kitchen Renovation in Golders Green →

Bathrooms

Bathroom Renovation in Golders Green →

Interiors & Joinery

Bespoke Joinery in Golders Green →

Book a feasibility visit

We reply within one working day, Monday to Friday, 8am to 6pm.

Chat with us!