Bathroom renovation in Wanstead

Updated 11 November 2026

From the family bathroom of an Aldersbrook house to a shower room above a High Street shop: settle the floor, the waste, the air and the wiring before the tiles.

Discuss your project

One bathroom, in a Wanstead house or flat

We are glad to renovate just one bathroom: the main bathroom of an Edwardian house in Aldersbrook, an upstairs room in a Spratt Hall Road house, or a shower room squeezed into a flat over a High Street shop. The rooms differ, yet the questions repeat themselves: what the floor can carry, where its waste will drain, how stale air leaves, and which electrical work sits near water. Answering them at the survey, before anyone chooses a suite, is what keeps a layout from being redrawn halfway through.

On approvals, the Planning Portal draws a line between refitting and creating. Swapping old fittings for new in an existing bathroom is not usually a Building Regulations matter, according to its guidance on approvals for kitchen and bathroom work; new drainage or electrics within that refit can be, and turning a room that had no bathroom into one probably will be, with its ventilation, drainage, structure, electrical safety and fire safety all checked. GOV.UK separately lists a bathroom installation involving plumbing among the work covered.

Can the floor carry the bath?

Once filled and in use, a bath can overload a floor of timber joists and boards, the Planning Portal warns on its page about whether existing floors are suitable, so a new suite may call for strengthening. It points to an engineer or surveyor to assess the floor and prepare the documents a building control body will ask for. Our engineers measure the joists, which way they run and how far they span, and look for old notches made by plumbers, before anyone settles on a heavy bath, natural stone tiles or a broad shower tray.

The same inspection shows how much depth there is for a level-access shower. A wet room floor must slope to its drain, and on timber that generally means a stiff deck with a formed or prefabricated tray set into the floor. If the joists run across the line the waste must take, or the depth simply is not there, a low raised tray can be the more sensible answer, and we will tell you that at design stage.

Soil stacks, waste runs and waterproofing

Where the stack is decides more bathroom layouts than taste does. A WC or shower set away from it needs enough gradient all the way to the connection, and that route has to pass joists and walls without weakening them. Above a shop, the stack may also serve the shop or other flats, so its route and any change to it are checked against the lease before the plan is settled. Concealed valves and traps are given access panels, so a future repair can be made without lifting tiles.

Waterproofing is the stage we treat as critical. For a wet room or open shower, the floor and the lower walls are sealed with a continuous membrane, lapped into the drain and around every pipe, and the membrane and the waste are tested before a single tile is laid. In a flat, a failed seal shows first in the ceiling below, so we photograph the finished membrane and keep the record in your handover file.

Fans, trickle vents and the outside of the house

Ventilation is easy to leave out of a quotation. The Planning Portal’s page on the need for additional ventilation expects any newly created bathroom or shower room to be given extraction; in a refurbished one, an extract that exists already should stay or be renewed, while a bathroom that never had one is not obliged to gain one. It also expects background ventilation, giving an equivalent area of 4,000mm² for a bathroom, which trickle vents built into the top of a window can supply.

The fan’s outlet is visible from the street or garden. A grille in a front wall, a duct through the roof or a roof light over a top-floor bathroom changes how the house looks. In Aldersbrook the 2020 Article 4 direction reaches roof lights and every elevation, 2–48 The Drive has a direction covering rooflights, and the Spratt Hall Road direction (numbers 1–47) controls changes to a street-facing roof slope, so we check a new outlet or roof light with Redbridge before ordering. Flats in Redbridge do not have householder permitted development rights, so for a flat the council has to be asked about any outside change, and the freeholder too if the lease says so.

Electrics near water, and consent in flats and listed buildings

GOV.UK names electrical changes near a bath or shower as work needing Building Regulations approval, together with a new fuse box and its circuits (the GOV.UK approval page). Where the electrician is registered with a competent person scheme, no separate application is needed; on our bathrooms the wiring for lights, shaver point, towel rail and fan is certified to BS 7671 by a registered competent person, with the certificate kept for your records.

For a flat, check the lease before choosing a layout: LEASE advises that the landlord may have to agree to alterations, and that council approvals do not replace that agreement (the advisory service’s note on alterations). A bathroom moved over a neighbour’s living room, or a new waste run across the flat to the stack, is worth sending to the agent as a drawing first. In a listed building, Redbridge says most works need listed building consent, so even an indoor bathroom refit is raised with the council at the start.

How the bathroom is built and handed over

After the survey we draw the layout and agree fittings, tiles, lighting and storage with you, then decide how the shower will be sealed and where valve access panels will sit before anything is ordered. On site the room is stripped, the floor repaired or strengthened, and the first fix of pipework, waste and cables goes in, followed by the membrane and its test, the tiling and the second fix. Where this is the only bathroom in the home, we work out in advance where everyone will bathe while it is unusable.

At handover you receive the electrical certificate, building control’s completion certificate where one applies, the instructions for the fan and the shower valve, and a walk-round to list any snags. From completion, the 12-month defects period applies.

Continue planning

The Wanstead area guide · Bathroom renovation across London · Hampstead Architecture & Planning · Hampstead Chartered Surveyors & Building Consultancy

Discuss your project

Tell us what you are planning in Wanstead

Share the property location, the work you have in mind and any drawings or permissions you already have.

£5M public liability, £10M employers' liability and contractors' all risks cover.

Design support: Hampstead Architecture & Planning. Surveying support: Hampstead Chartered Surveyors & Building Consultancy.

Your details will be used to respond to your enquiry. Read our privacy policy.