
Pembroke Gardens, Kensington W8
A first-floor Kensington mansion flat with an open-plan bespoke kitchen, integrated seating and upgraded services.
Hampstead Renovations · London Design and Build
Layout, services and fitting under one contract, for houses, leasehold flats and listed homes.
Ross Alinari, Senior Building Surveyor and Construction Director. Hampstead Renovations Ltd, company number 16838595. £5M public liability, £10M employers' liability and contractors' all risks cover.

Book a feasibility visit
We reply within one working day, Monday to Friday, 8am to 6pm.
Or call 020 7101 3168
“We have worked with Ross and his company many times. They are extremely professional and hardworking individuals who can work under any circumstances. There was no variation to the works.”
“A company where you get value for your money while at the same time achieving excellent quality. Their work is carried out on time and within budget. We’ve worked with them on multiple projects and they never disappoint.”
Updated
A kitchen renovation in London covers layout, structural openings, water, waste, gas, electrics, extraction, cabinetry, worktops and fitting under one contract for houses, flats and listed homes. Projects typically fall within £15,000 to £25,000 plus VAT, set by written quotation from a feasibility visit and measured survey. Handover includes a 12-month aftercare/defects period.
We design and build the kitchen under one contract: the layout, any structural opening, the water, waste, gas and electrics, the extract route, and the fitting.
Cabinetry is made to measure by our own joiners or a partner workshop, or supplied as a German-made kitchen. We also fit a kitchen you have already bought.
In a flat, the lease can limit how far the kitchen moves. In a listed home, the opening and the extract have to suit the building.
In-house architects, designers and structural engineers plan the work. A written quotation follows the agreed specification.
Find your kitchen renovation guide in North and North West London, Central London or West and South West London.
The appointment ends with a 12-month aftercare/defects period.

A first-floor Kensington mansion flat with an open-plan bespoke kitchen, integrated seating and upgraded services.

An upper-floor apartment with a terrazzo kitchen island and bespoke steel shelving.

An apartment refurbishment with restored plasterwork and a dark bronze kitchen.

An apartment interior with a bespoke kitchen and marble surfaces.
The cost moves with whether walls, floors or the services move, the extract route, made-to-measure cabinetry or a supplied kitchen, worktops and appliances, a lease or a listing, and how units and waste get in and out.
The quotation states the VAT treatment for the agreed scope. A written quotation follows the feasibility visit and the agreed scope and specification.
| Typical scope | What changes the cost | What we need to quote |
|---|---|---|
| Installation of client-supplied kitchenStrip-out, room preparation, first-fix plumbing and electrics, fitting of cabinetry you have bought, stone templating coordination and finishes. | Condition of existing walls and floor, first-fix water, waste, gas, electrical and lighting circuit changes, extract duct routing, stone worktop templating and access for deliveries and waste clearance. | Feasibility visit, measured room survey, your supplier kitchen plans and unit schedule, confirmed appliance list, worktop material choice, and delivery access details. |
| Full kitchen renovation within existing roomLayout design, first-fix services, extraction route, made-to-measure or German-made cabinetry, worktops, lighting and fitting under one contract. | Cabinetry route (our own joiners, a partner workshop or a German-made kitchen), worktop surface (engineered quartz, natural stone, timber, solid surface, stainless steel or concrete), moving water, waste, gas or hob and sink positions, extract duct route, island floor services and multi-circuit lighting. | Feasibility visit, measured survey of the room, walls and existing services, layout priorities (hob, sink, fridge, island or dining table), preferred cabinetry route, and worktop and appliance choices. |
| Open-plan kitchen with structural wall removalFull kitchen renovation including in-house structural engineer beam design, load-bearing wall removal, floor preparation, services and made-to-measure joinery. | Structural beam design, bearings, posts and temporary support for a load-bearing wall, Building Regulations compliance, floor levelling across joined rooms, relocated drainage, gas and extraction, any new external garden opening (requiring separate planning or Party Wall checks), and bespoke cabinetry. | Feasibility visit, measured survey and assessment of the wall to remove by our in-house structural engineer, any existing floor plans, structural drawings or consents, layout and cabinetry brief, and appliance schedule. |
| Leasehold flat or listed building kitchen renovationKitchen design, services, compliant extract routing and bespoke joinery tailored to lease conditions or historic building fabric. | Freeholder Licence to Alter requirements (landlord fees sit outside the build quotation), block working hours and stair or lift access for long stone worktops and tall units, compliant extract routing (ducted versus recirculating where external outlets are restricted), hard-floor acoustic rules, and Listed Building Consent for internal alterations affecting historic joinery or plaster. | Feasibility visit and measured survey including stair or lift turns and extract routes, lease extract and managing agent rules (or listing details), any existing drawings or consents, and cabinetry, worktop and appliance choices. |
Typical London kitchen renovations fall within £15,000 to £25,000 plus VAT (written quotation from a feasibility visit and measured survey) — outline your project in our cost calculator.
The layout, the units, the worktops, the appliances, the lighting and the building work in that room. Plumbing, wiring and extract are set out before the units are ordered. Structural work is included only where the agreed design needs it.
£15,000 to £25,000 plus VAT. Moving a wall or the services, the extract route, a lease or a listing, how the units reach the room, and the cabinetry and worktops move the price inside that range. A written quotation follows a feasibility visit.
Three routes, agreed on the project: our own joiners, a partner workshop, or a German-made kitchen supplied to the design. We also fit a kitchen you have already bought. The quotation names the route. It does not name a brand.
A feasibility visit and a measured survey come first. The layout and the services are agreed, you receive a written quotation, and the units are ordered against that design. The room is stripped out, the services and any structure are done, and the units and worktops are fitted. Handover includes a 12-month aftercare/defects period.
Often, and in a terrace the wall is frequently carrying the floors above. An in-house structural engineer checks that wall, and any beam is designed for that house. Building regulations apply to the structural work. The kitchen layout is drawn around the beam, not the other way round.
Replacing a kitchen inside the existing rooms does not usually need planning permission. An extension, a new opening in an external wall, a conservation area and a listing are checked separately. Listed-building consent can apply to work that affects the building’s special interest, including some internal change.
The hob, sink and fridge positions, the extract route, the socket and lighting layout, the waste runs, and whether an island can be served from the floor. Stone worktops are templated after the units are fitted. A late change to an appliance can change the unit sizes, so the appliance list is fixed with the drawings.
Most households stay, with a temporary kettle, a hob and water set up in another room, and dust kept to the working area. If the kitchen is the only route through the house, or the work includes a structural opening, that arrangement is agreed before the strip-out.
We reply within one working day, Monday to Friday, 8am to 6pm.
Leave your name and phone number and we will call you back about your kitchen renovation.
A lower-ground kitchen needs a route out for both cooker extract and waste. Locate each before moving the hob or sink.
On Chatsworth Road, measure the original rear kitchen wing and its supporting walls before drawing a full-width opening.
Measure the bay and the chimney breast before choosing cabinets for a period kitchen. See the joinery fitted around the bay at Crouch End Hill.
For a garden-floor kitchen on Dartmouth Park Road, measure the step down to the garden before ordering doors or units.
For a kitchen above the Cheapside or Promenade shops, check the building’s listing and the proposed hood outlet before ordering cabinets.
In a village house, measure chimney breasts, door openings and the route for cooker extraction before ordering cabinets.
Choose a cooker extraction route early. A new grille on an outside wall can need Trust consent even when the units stay in the same room.
For a Heath-side kitchen opening onto a garden, plan the duct outlet alongside any change to the rear wall.
For a garden-floor kitchen, establish what the rear wall and chimney breast support before committing to an open-plan layout.
Measure the width of the rear rooms and the chimney breast before deciding whether the kitchen will open onto the garden.
In a lower-ground villa kitchen, check the structure above any proposed opening before settling the cabinet plan.
In a narrow Edwardian terrace, draw the extractor route to the garden side before fixing the layout of the rear kitchen.
In a narrow rear kitchen, compare a rooflit side return with a wider rear opening before deciding where the dining table will fit. See the rear extension and kitchen in Primrose Hill.
In a Salusbury Road flat, agree a route for the cooker hood through the building before fixing the hob position.
On a terrace’s former service floor, establish which walls, openings and flues can be used for the new kitchen.
A kitchen on the raised ground floor can sit well above the garden. Measure that change in level before positioning the doors.
Measure the lift, stair turns and flat entrance before deciding how long each stone worktop section can be.
Compare the raised ground floor and semi-basement for headroom, structural openings and an extract route to the outside.
In an older Totteridge Green farmhouse, establish whether the wall is part of the original timber frame before planning an open kitchen.
In a terrace, decide how the kitchen will reach the garden and which rear wall or chimney breast the layout depends on.
More kitchen renovation pages in North and North West London:
Above a Queensway restaurant, establish which duct serves the flat before choosing the hob and extractor position.
For a kitchen off one of Belgravia’s garden squares, draw where the extract duct would leave the terrace before fixing the cabinet layout.
In a Fitzrovia flat over a shop, trace the kitchen duct separately from the shop’s extraction and confirm who controls each route.
For a Brompton Road apartment, measure the service entrance, lift and tightest turn before ordering a worktop in one piece.
At 1–9 Lancaster Gate, check the lease and the existing duct route before choosing where an extractor would leave the listed terrace.
Before choosing stone or porcelain for a Portman Estate flat, check whether your lease restricts hard floors and what acoustic treatment the landlord expects. Walnut kitchen on Wimpole Street.
Measure the journey from the mews entrance to the kitchen before settling the length of a worktop or the height of a tall cabinet. Grosvenor Street kitchen.
For a converted Pimlico mews, draw the proposed extractor outlet in relation to the windows opposite before agreeing the ventilation design.
In a side street off Pall Mall, look for an internal extract route before considering a grille through a surviving sash window.
For a basement kitchen on Cowley Street, trace the extract duct all the way to its outlet and identify any listed interiors above that route.
More kitchen renovation pages in Central London:
In a Henry Boot house in north Barnes, identify the original concrete frame and any later rebuilding before planning an opening into the kitchen.
Draw the L-shaped rear addition and yard of a Park Town terrace to scale before positioning kitchen units and the garden door.
In a narrow terrace near Markham Square, check the floor can carry a stone island and the worktop can make the turn in from the street.
Glebe Street gardens vary in depth. Measure the yard and check daylight to the room behind before choosing a rear kitchen extension.
In a former hotel converted to flats near Earl’s Court Square, trace the existing supply and extract routes before committing to a new kitchen layout.
Measure the narrow rear addition of a Sands End terrace before drawing an island or positioning the cooker extract.
Behind a Holland Park terrace, compare the proposed kitchen opening with the rear windows and building line on either side.
Before moving a kitchen into another room in a listed Kensington house, identify its original doors, cornices and floorboards. Bespoke kitchen in Pembroke Gardens.
At the cottages on Thetis Terrace facing Westerly Ware, measure the route from the road before ordering a worktop in one piece.
In the Pembridge streets near Notting Hill Gate, mark the outside end of the extractor on an elevation as well as setting out the cabinets inside.
In one of the narrower Nichols houses on Coniger Road, measure the working width along the route to the garden before fixing cabinet depths.
In a Lifford Street cottage, allow for the route from the front door to the narrow rear kitchen before ordering full-height units.
In an Alberts terrace, have the remaining chimney stack assessed before removing a breast to open up the kitchen. Kitchen installation at The Green, Richmond.
In a Thurloe terrace, measure the daylight from the railed lower-ground lightwell before deciding where tall kitchen cabinets will stand.
In a Mansel Road semi, mark the existing rear wall and the rooms it supports before sizing an opening for the kitchen.
More kitchen renovation pages in West and South West London:
Browse kitchen renovation guides for North London, Central London and South West London.
The same range is in the kitchen cost guide and the cost calculator. Related work: house refurbishment, flat refurbishment, bathroom renovation and published case studies.
Surveying is a separate instruction to Hampstead Chartered Surveyors & Building Consultancy.
A London kitchen is usually a room that was not built as a kitchen, or a kitchen that has to work harder than the one it replaces. The useful choices are the layout, the services, and the materials, made before anything is ordered.
An L-shaped run suits the rear room of a Victorian or Edwardian house, where two walls can hold the hob, the sink and the storage and the rest of the floor stays clear for a table. An island needs enough clear width to walk around it while someone is standing at the run behind. A galley, with two parallel runs, is the efficient layout for a narrow terrace kitchen or a flat. A U-shape suits a room that can give up a wall to storage. The drawing starts from the hob, the sink and the fridge, then from how many people stand in the room at once.
In a compact kitchen the same plan uses handleless or rail doors, appliances behind panels, and drawers rather than a dead corner. A door to the garden is a separate piece of work: it is an external opening, and it is checked for structure, building regulations and planning before it is drawn as part of the kitchen.
Taking down the wall between a kitchen and a dining room is common, and in a terrace that wall is often carrying the floors above. The beam is designed by an in-house structural engineer for that house, and the units are drawn around the bearings and any post. Building regulations apply to the structural work, the drainage and the electrical work. Sockets, lighting, the hob supply and the waste are on the drawing before first fix, because a late appliance change alters the units and the worktop joints.
Extract is planned with the layout. A duct to an outside wall, a route through a ceiling, or a recirculating hood are different bits of work, and a lease or a listing can rule one of them out. Stone worktops are templated after the units are in, so the joints follow the walls as they are, not as the plan hoped they were.
In a flat the lease comes first. GOV.UK’s leasehold guidance is the reason the lease is read before the layout is fixed: it says what you have agreed you may alter. The extract route, the stack, the hours of work and the way units and worktops get up the stair or into the lift are agreed with the freeholder before the units are ordered.
In a listed house the control can reach inside the room. The Planning Portal says listed-building consent covers alteration that is likely to affect the building’s character. A new opening, or the removal of historic joinery or plaster, is checked before the kitchen is drawn, and the application goes in before anything is ordered. Replacing a kitchen inside an unlisted house does not usually need planning permission. An extension does, and that is a different page of the brief.
Worktops are chosen for how the kitchen is used. Quartz and other engineered stones are non-porous and need little sealing. Marble and other natural stones are chosen for their appearance and need sealing, and acid marks them. Timber suits a room where oiling and the occasional sanding are acceptable. A solid surface can be joined without a visible seam and can be repaired. Stainless steel and concrete are specified where the use justifies the upkeep. The quotation names the material and who supplies it. It does not name a brand.
Cabinetry is made to the room, because few London rooms are square. The three routes are our own joiners, a partner workshop, or a German-made kitchen supplied to the design. We also fit a kitchen you have already bought, and we coordinate that delivery with the site. The fitting, the lighting under the units, the splashback and the floor are in the same scope, so the room is not priced as a furniture order with the building work added later.
Inside the published range, the price moves with structural openings, how far the services move, the extract, a lease or a listing, access for the worktops, and the cabinetry and the surface you choose. The 12-month aftercare/defects period applies to the completed work. Appliance warranties stay with the manufacturer, in your name.
Lighting is drawn with the units. A light on the work surface, a light in the room and a light over a table are three circuits, and they are in the first fix. A pantry or a utility cupboard is included only where the plan has a wall for it. If the household is staying, a kettle, a small hob and water are set up in another room before the existing kitchen is stripped. That is a temporary arrangement, not a second kitchen.