Westminster's Code of Construction Practice says contractors on Level 3 projects without a Section 61 consent will be issued a Section 60 notice before starting work, which sets working hours.
Westminster City Council says parking bay suspension applications received within 10 calendar
Westminster's Code of Construction Practice says contractors on Level 3 projects without a Section 61 consent will be issued a Section 60 notice before starting work, which sets working hours.
Westminster City Council says parking bay suspension applications received within 10 calendar days of the proposed start date are subject to a short-notice fee.
Westminster's Code of Construction Practice says Level 1 and 2 projects submit Appendix A Checklist A with a SEMP, while Level 3 projects submit Appendix A Checklist B with a CMP.
Sources: Westminster City Council: Code of Construction Practice (May 2026), Westminster City Council: parking bay suspensions
Grosvenor says its consent is required for extensions including basements, replacing or
Grosvenor says its consent is required for extensions including basements, replacing or altering windows, works to walls and roofs including external pipework, roof terraces, and air conditioning, comfort cooling or other external plant.
Grosvenor says excavation below floors already below street level is generally not permitted unless the existing floor-to-ceiling height is less than 2400mm, when excavation to achieve that clearance is allowed.
Source: Grosvenor: Belgravia and Mayfair management schemes
Grosvenor says its Estate Management Schemes largely govern repair and alteration of
Grosvenor says its Estate Management Schemes largely govern repair and alteration of external load-bearing structures and decoration of external surfaces, and in Belgravia only, alterations to internal load-bearing structures.
LEASE says that even where a lease allows alterations, other clauses can restrict work, for example a 'floors must be carpeted' clause might prevent laying wooden or laminate flooring.
Sources: Grosvenor: Belgravia and Mayfair management schemes, LEASE: alterations and home improvements
Westminster's 2004 Mayfair mini guide says a Regulation 7 direction covers the
Westminster's 2004 Mayfair mini guide says a Regulation 7 direction covers the whole area, so any advertisement for the sale or letting of land, including estate agents' boards, needs council consent.
Source: Westminster City Council: Mayfair conservation area mini guide
Bespoke joinery in Mayfair: questions
How is bespoke joinery in Mayfair priced?
Pricing: quoted after a feasibility visit.
Joinery in published projects
Rooms and elevations typical of Mayfair
Design, joinery and the build, under one contract in Mayfair
The same team stays with the project from the first visit to handover. In-house RIBA chartered architects, interior designers and IStructE chartered structural engineers draw and specify the work. Master joiners make the fitted furniture. Licence to alter, party wall matters, schedules of condition and Building Regulations sign-off sit with the sister practice, Hampstead Chartered Surveyors & Building Consultancy (RICS Firm No. 923064). One JCT contract covers the building work. Electrical installation is certified to BS 7671 by a registered competent person. Completed structural work carries a 12-month defects liability period. Cover is £5M public liability, £10M employers' liability and contractors' all risks cover. Studios: 2 Eaton Gate, Belgravia, London SW1W 9BJ, and 250 Finchley Road, Hampstead, London NW3 6DN. Telephone 020 7101 3168.
Licence to alter · Surveying support from the sister practice
What clients have said about the work
I would like to thank Ross and his team for their consistent commitment to quality and their unerring reliability.
We have worked with Ross and his company many times. They are extremely professional and hardworking individuals who can work under any circumstances. There was no variation to the works.
Verified Planning, Estate & Conservation Sources