Bathroom renovation in Victoria Park Village
A bathroom in a Church Crescent cottage, a Gore Road family house or a divided villa near the park, planned around the floor, the drain and the extract.
Discuss your projectThree settings for a bathroom near the park
Bathrooms in Victoria Park Village tend to sit in one of three kinds of building. On Ruthven Street, Connor Street and Shafton Road the cottages rise just two storeys and are tight on space, so wherever the soil pipe runs can decide the plan before a single basin is chosen. Family houses on Gore Road, and the taller terraces and villas on the main roads, can stand three or four floors high above a basement, which may leave an attic bathroom a long way from the drain. Then there are the flats in the big Victorian houses split up along Lauriston Road, Southborough Road and Victoria Park Road, where a bathroom usually empties into a vertical stack shared with the flats overhead and underneath.
We are happy to take on a single bathroom with nothing else attached. It gets a survey, a design and a quotation of its own, whether the room is in a cottage, a family house or a flat.
Can the floor carry the bath?
Victorian joists were never sized with a filled tub and its bather in mind. The Planning Portal describes a significant risk that a bath, once full and in use, overloads the floor beneath it, and adds that an engineer or surveyor can judge the floor and draw up the documents building control will want if it needs strengthening. If you want a cast-iron tub, a stone bath or a heavy stone floor, our structural engineers first measure joist depth, spacing and span, note which way the joists run, and look for places where past plumbers have cut notches or holes in them.
A wet room raises the same question from another angle. Water must find the drain from every corner of the room, which on timber joists may involve dropping, firring or packing them in one zone. That slope is designed and drawn beforehand, not left for the tiler to work out on the day.
Drains, tanking and access for maintenance
Every waste needs enough fall to reach the stack, so the stack is the anchor of the plan. In a cottage or terrace house, moving the WC to the opposite wall can be easy or unworkable according to the joist direction and the stack’s position. In a flat, the shared stack restricts where the WC may go, and a fresh connection to it may need the freeholder’s say-so, since several households rely on it.
For a wet room or a level shower we lay a waterproof membrane across the floor, turned up the walls, before tiling starts, seal each pipe and waste where it pierces the membrane, and test it before it is covered. Valves, traps and the extract fan’s isolator go behind removable panels, so servicing them in later years never means chiselling out tiles.
Extract air, electrics and approval
The Planning Portal’s page on extra ventilation asks for a new bathroom to have a means of extracting air, to cut condensation and odours; on a refit, whatever extract the room already has must stay or be renewed. We draw the duct’s path when we draw the waste, since its exit point matters near the park. For a listed house, Hackney’s 2025 SPD makes listed building consent necessary for work outside as well as within, and anywhere in the conservation area we would rather the vent came out at the back or side than on the street front. Hackney’s Retrofit SPD makes the matching point that a draught-proofed home still needs some air movement if damp is not to gather.
Two items any bathroom refit is likely to touch sit on GOV.UK’s list of alterations that can require Building Regulations approval: putting in a bathroom with plumbing, and changing electrics close to a bath or shower. Electrical work in the room is certified to BS 7671 by a registered competent person. Using an installer registered with a competent person scheme means, GOV.UK says, that you have no separate approval to obtain.
Listed houses and leasehold flats
Grade II listing covers houses such as 1 to 3 and 4 to 7 Church Crescent, along with Cassland Road’s Hackney Terrace. Hackney’s appraisal puts taking out fireplaces, shutters and other internal features on its list of work for which listed building consent is often required, so a bathroom slotted into a listed bedroom is planned to leave the cornice, skirting and shutter boxes where they are, with pipes threaded through existing voids or behind boxing that can come away again cleanly.
For a flat, your lease sets out whether the landlord has to consent first, and the Leasehold Advisory Service is clear that a planning permission or Building Regulations approval is no replacement for that consent. Relocating a bathroom above the bedroom of the flat below calls for particular care, over both sound and the damage a leak could do, and a landlord is likely to ask to see the plan before agreeing.
From survey to a working room
Our survey notes the room’s size, the fittings in it now, how the floor is built (with a board lifted to see the joists), the waste route, the hot and cold pipes and any extract already in place. The design then settles the layout, the bath or shower, storage, lighting and the duct’s path, and the quotation prices that room and nothing else. Work runs from stripping out, through any joist strengthening and first-fix pipes and cables, to tanking and its test, and then tiles, fittings, sealant and paint. Where this is the household’s only bathroom, we settle in advance how you will wash while it is out of action. You are handed the electrician’s certificate, a completion certificate from building control where approval was needed and the care notes for the fittings, and our 12-month aftercare/defects period starts.
Continue planning
The Victoria Park Village area guide · Bathroom renovation across London · Hampstead Architecture & Planning · Hampstead Chartered Surveyors & Building Consultancy
Discuss your project
Tell us what you are planning in Victoria Park Village
Share the property location, the work you have in mind and any drawings or permissions you already have.