Church Mount
Hampstead Garden Suburb
Designers, Architects, Engineers & Builders Under One Roof.
One Studio. One Contract. One Team.
Family bathrooms, en-suites and shower rooms for Suburb houses and flats, laid out around the soil stack so that new pipework stays inside wherever it can, with fans, vents and finishes chosen for the room.
Book a feasibility visit
We reply within one working day, Monday to Friday, 8am to 6pm.
Or call 020 7101 3168
Bathroom renovation in Hampstead Garden Suburb needs a workable room layout and a clear route for water, waste and extraction. Our team includes RIBA Chartered Architects, in-house designers and structural engineers who plan the room with the building around it. The first permission question is often whether a new pipe or vent reaches the outside; listed and leasehold homes need additional checks. Our completed Church Mount project in the Suburb included five bathroom renovations, a garage conversion and minor works. Share the rooms you want to change and book a feasibility visit.
| Council | London Borough of Barnet |
|---|---|
| The Trust | Controls relevant external alterations; internal work depends on tenure, listing and the stated exceptions. |
| Conservation area | Designated December 1968. |
| Article 4 | The 2010 direction removes specified permitted development rights at the covered properties. |
| Listed buildings | The 2010 appraisal records two Grade I, forty-one Grade II* and 740 Grade II buildings; check the address. |
| Our studio | Unit 3 Palace Court, 250 Finchley Road, NW3 6DN. |
We plan and fit family bathrooms, en-suites, shower rooms, cloakrooms and wet rooms. A family bathroom may need a bath and storage that suit several people; a small en-suite may depend on making a shower and basin work without obstructing its door. We begin with the room's use and measured limits, then coordinate the fittings, lighting, heating and finishes. The specification identifies what is being retained and the making good needed outside the room.
The WC position has to be considered with the soil stack and the route through the building. Moving it can involve work below the floor, behind joinery or on an outside wall. We review those routes with the layout so a drawn arrangement does not conceal unresolved building work. In the Suburb, the Trust and Barnet's guidance favours internal pipework where possible; an additional outside pipe is a consent question, not simply a fitting choice.
We include preparation, waterproofing and the finish as separate parts of the room specification. For a wet room on a timber floor, the team assesses the floor structure, drainage route and proposed build-up before agreeing the detail. Tiles and a level-looking surface alone do not establish that the underlying floor is suitable. The layout also needs to account for access to valves and concealed connections, so later maintenance is considered before finishes close the room.
Where more than one bathroom is being renewed, we consider the rooms together with shared services and the household's need for usable facilities. Our completed Church Mount project in the Suburb renovated five bathrooms under one coordinated scope. A multi-room brief should identify each room's fittings and finishes, any common selections, and the building work between rooms. That allows the quotation to describe the complete scope instead of treating connected rooms as unrelated refits.
A roof-space bathroom brings the usable height, floor and waste route into the design. If it requires a rooflight, the outside change must be considered with the Trust's roof guidance. Its guidance favours discreet conservation rooflights, generally away from front slopes, fitted flush with matching surrounding tiles. See the Suburb loft-conversion page where the bathroom forms part of a wider roof-space proposal. The bathroom appointment and the loft building work need a coordinated scope.
The feasibility visit establishes which rooms you want to change and how they are used. We examine the existing stack and service routes, floor construction, water supply and electrics as part of planning the work. Tell us about poor pressure, slow drainage, leaks or cold areas, and bring any relevant reports. These observations help define what needs investigation before the new room is specified.
We plan the fittings with the waste route, available floor depth and extraction in view. The proposed shower, bath, basin and WC are considered alongside doors, storage and maintenance access. Our RIBA Chartered Architects and in-house designers prepare the layout drawings and coordinate the room finishes; structural engineers are involved where the proposal affects the floor or another structural element. The specification records the agreed choices and what preparation is included.
We identify any new external pipe or vent, roof alteration, listed fabric or lease condition relevant to the design. The agreed appointment describes the drawings and application information we prepare. The written quotation and contract then set out the building and fitting scope. A concealed route that cannot yet be confirmed is recorded for investigation rather than presented as an agreed detail.
Protection and the agreed service isolations come before removing fittings. First fix establishes the concealed plumbing and electrical work with any necessary floor or wall preparation. We discuss which facilities will be unavailable and how access is managed. In a house with several bathrooms, that discussion covers shared supplies and routes as well as the room being worked on.
The specified waterproofing and surface preparation precede tiling and other finishes. Second fix brings the sanitaryware, brassware, lighting and controls into place. The fitting sequence is coordinated with the chosen products and the prepared room. Changes to a fitting or finish are checked against the agreed detail, particularly where they affect connections, dimensions or the floor build-up.
The relevant installations are tested and the required certificates arranged. At handover we discuss controls, care and access to service points, and record any items to be addressed. Keep the room specification, consent information and certificates together. A 12-month defects period applies under the contract after completion, with the reporting arrangements explained as part of handover.
The joint guidance has one line for anyone planning a Suburb bathroom: think about the plumbing at an early stage. Every new outside pipe needs consent from the Trust and Barnet, so the best layouts keep their waste runs inside the house.
We fix the soil stack position before choosing tiles or sanitaryware.
Source: Hampstead Garden Suburb Trust and Barnet Council: Conservation Area Design Guidance (2010)
All new or altered external pipework needs consent; careful internal planning can reduce outside runs, and additional soil and waste pipes should be inside where possible.
Where a stack has to be outside, new and replacement plumbing stacks should be cast iron except in exceptional circumstances.
A Trust application should show the position and material of all external pipework, flues and vents, both existing and proposed.
We look first for an existing stack the new bathroom can join, then a boxed riser in a cupboard or a route under the floor, before proposing any new pipe on an outside wall.
Sources: Hampstead Garden Suburb Trust and Barnet Council: Conservation Area Design Guidance (2010), Hampstead Garden Suburb Trust: Planning FAQs
Approved Document F says that where building work is carried out in a bathroom, existing fans should be kept or replaced and checked to see that they work.
The Trust's retrofit guidance describes extract ventilation from wet rooms such as bathrooms, and says any external vent must be agreed with the Trust before installation.
We choose the vent position with the bathroom layout, so the duct is short and the outlet sits on a side or rear wall rather than across a principal elevation.
Sources: Approved Document F, Volume 1: Dwellings (2021 edition), Hampstead Garden Suburb Trust: Home Retrofit Guidance
GOV.UK lists installing a bathroom that involves plumbing and changing electrics near a bath or shower among work that might need building regulations approval.
Under the Water Supply (Water Fittings) Regulations 1999, installing a bath holding more than 230 litres needs notice to the water undertaker.
Straight replacement is usually exempt: GOV.UK says most repairs, replacements and maintenance need no building regulations approval.
Sources: GOV.UK: Building regulations approval, The Water Supply (Water Fittings) Regulations 1999, regulation 5, GOV.UK: when you don't need building regulations approval
Underfloor heating needs no Trust consent, and the Trust notes it suits an air source heat pump because it runs at a lower flow temperature.
A heat pump, a boiler flue or a new ventilation system does need the Trust's consent.
Listed houses need more care: the Trust cautions that insulating a floor can damage a listed building's special interest, and Barnet's Listed Building Consent covers interior alterations.
Source: Hampstead Garden Suburb Trust: Home Retrofit Guidance
In a flat or a leasehold house, check two things before the design: whether the Trust owns the freehold, in which case it wants to hear about internal work, and whether the lease brings internal alterations under its consent.
LEASE gives two examples: a clause forbidding cuts to external walls would stop new openings for pipes, and underfloor heating passing through another flat needs the landlord's permission where the landlord owns the shared floor.
We read the clauses on pipe openings, floors and waterproofing before drawing the bathroom layout.
Sources: Hampstead Garden Suburb Trust: Planning FAQs, Hampstead Garden Suburb Trust and Barnet Council: Conservation Area Design Guidance (2010), LEASE: Alterations and home improvements
For intermittent bathroom extraction, Approved Document F, Volume 1, gives 15 litres per second. Continuous systems follow a separate table. Refurbishing an existing bathroom is addressed separately from adding a new wet room: existing fans should be retained or replaced and their operation checked. The correct approach depends on the work and the applicable standards, so the fan and duct route are considered together. A suitable technical design still needs the Trust's consent where it adds a vent outside.
Approved Document P identifies a new circuit, replacement consumer unit and additions or alterations to circuits in a special location as notifiable work. Around a bath or shower tray, that special location extends 0.6 metres horizontally and up to 2.25 metres, or the shower-head height if higher. A shower without a tray has a different horizontal extent. A registered competent person checks the actual layout, with the installation inspected, tested and certified to BS 7671. The notification boundary is not a guide for positioning fittings yourself.
The Suburb's 2010 appraisal counted two Grade I, forty-one Grade II* and 740 Grade II listed buildings. The figures describe the area at that date; the address must still be checked individually. In a listed house, new pipes, floor build-up and removal of old material may affect protected fabric even when the proposed bathroom cannot be seen from the street. Barnet's listed-building decision is separate from the Trust's control and the technical Building Regulations requirements.
This is a starting point for a specific proposal. The Trust, planning, listed-building and technical approvals are separate decisions; lease permission and party wall notices may also be needed.
| Work proposed | The Trust | Barnet planning | Listed building consent, if listed | Building Regulations |
|---|---|---|---|---|
| Replacing the suite in the same positions | No for an internal freehold refit without external changes | Depends on any other development in the proposal | Depends on alterations to the listed building | No for replacing baths, toilets and basins alone; associated work can differ |
| Moving the WC to a new outside stack | Yes for the external pipe | Yes under the joint guidance for new outside pipework | Depends on its effect on protected fabric | Depends on the new drainage and plumbing installation |
| An en-suite with a new rooflight | Yes for the roof alteration or loft conversion | Depends on the roof proposal and Article 4 controls | Depends on the alterations to the listed building | Depends on structure, services and room formation |
| A new extract through a wall or roof | Yes for the external vent | Depends on the outside change and planning controls | Depends on the effect of the installation | Depends on ventilation and electrical requirements |
| A bathroom in a listed house | Depends on tenure and external changes | Depends on any external development included | Yes for internal changes under the Trust guidance | Depends on the actual building and service work |
| A bathroom in a leasehold flat | Depends on the lease and whether the Trust is freeholder | Depends on the proposal, particularly external changes | Depends on listing and the proposed work | Depends on the installation; landlord permission remains separate |
Rows that need more address-specific information are discussed at the feasibility visit. Check the actual work with the relevant authority before starting.
Hampstead Garden Suburb · Completed bathrooms
Our Church Mount project included five bathroom renovations, a garage conversion and minor works. All five bathrooms are now completed; the exterior site image below was taken while site works were under way.

Hampstead Garden Suburb
Our completed work at Church Mount in Hampstead Garden Suburb brought five bathroom renovations together as one project (alongside a recorded garage conversion and minor works). Planning all five rooms under a single brief shows how the stages in our 16-stage bathroom renovation process apply when more than one room in a Suburb house is renewed.
All five bathrooms at Church Mount are now completed; the exterior site image shown above was taken during the works. Read our London bathroom renovation guide for the full service overview, or walk through all 16 process stages before booking a feasibility visit.
Each of these Hampstead flats has two bathrooms; the case studies record the flat renovation.
Bathroom quotations depend on the room's preparation as well as its fittings. A retained layout with sound underlying construction differs from relocating a WC, altering a floor or forming a new en-suite. The route to the stack, new extraction, waterproofing detail, tiling extent and selected sanitaryware all belong in the scope. Listing, lease conditions and any consent for outside work can require further design information.
For several rooms, the quotation should identify each bathroom and the work to shared services between them. We agree a specification and written quotation, with inclusions, exclusions and provisional items clear before the contract is settled. The sequence and any occupation arrangements should be discussed with that scope. Application fees are separate considerations where approval is needed; the Trust's fee guidance gives its current arrangements without relying on an old figure copied into a bathroom guide.
Inside a freehold house, not normally. If the bathroom needs a new outside soil pipe, waste pipe, flue or vent, the Trust's consent is needed.
Only with consent from the Trust and Barnet, and normally in cast iron. The joint guidance asks for additional soil and waste pipes to run inside where possible.
Possibly. GOV.UK lists installing a bathroom with plumbing and changes to electrics near a bath or shower as work that might need it.
Yes, without Trust consent. The Trust notes it suits an air source heat pump, which itself needs consent.
Listed Building Consent from Barnet is then needed for internal changes, whether the house is freehold or leasehold.
A bathroom in the Suburb is priced around its waste route and the building's rules. How far the fittings sit from the stack, the path for extract to the outside without altering a protected front, any Trust consent, listing or lease conditions, and the hours neighbours can expect are the main points. We check them on a feasibility visit, agree a scope and specification, and give you a written quotation.
We discuss the available bathrooms, shared services, access and planned isolations before strip-out. The answer depends on the layout and scope. Tell us if it is the only bathroom, so the need for other arrangements is addressed before work starts.
Yes, several rooms can be planned under one scope. Our completed Church Mount project in the Suburb included five bathrooms planned under one scope. Each room and the shared services must be specified, with the sequence and occupation arrangements agreed for that house.
Electrical work is inspected, tested and certified to BS 7671 by a registered competent person, with notification where required. Plumbing and other building work follow the applicable Building Regulations approval and inspection route. We identify the relevant certificates for the agreed scope at handover.
It depends on the floor, drainage route and waterproofing build-up. We assess these before agreeing the design, including any structural changes and the junction with adjoining rooms. The choice of tiles alone does not establish that the floor is suitable.
Start with the street, the number and type of rooms, and photographs of the existing arrangements. A plan helps explain which bathroom serves which bedrooms and where a new en-suite might sit. Include any known listing, lease restrictions or previous consent correspondence. If the work follows a leak or a condition survey, send that information so the repair and the new room can be considered together.
Describe what is uncomfortable or inconvenient now: shower space, storage, heating, pressure or access. List what you want to keep and any fittings already chosen. Tell us whether there is another bathroom the household can use and whether all rooms are intended to be renewed together. A working budget and priorities help us discuss a suitable scope at the feasibility visit; product choices and the building detail are developed from there.
Whether it is one bathroom or several, we look at each room and the outside walls its pipes and vents would use, and talk through layouts and likely costs.
Say how many bathrooms and which floors they are on.