Kitchen renovation in Victoria Park Village

Updated 11 November 2026

Kitchens in cottages, crescent terraces and converted flats around Lauriston Road, designed around the structure, the extract route and the services.

Discuss your project

Where a kitchen fits in local houses and flats

The houses around Victoria Park were planned with a clear order of rooms, and a modern kitchen is usually asked to do more than the space it occupies was first built for. In the larger terraces and villas, which stand three or four floors tall above a basement, the opening design question can be which floor the kitchen belongs on: the lower level, or the floor that steps out to the garden. In the two-storey terraces of Danesdale, Brookfield and Christie Roads and the small cottages off Lauriston Road, a rear kitchen in a slim plan has to fit its runs of units around doors, windows and a chimney breast.

Flats are different again. The council’s 2012 appraisal records that many large Lauriston Road, Southborough Road and Victoria Park Road houses were split into flats after the war, so a flat’s kitchen may stand in what was once a bedroom or a landing, with its waste and ventilation arranged however the conversion allowed. That is why our kitchen survey follows the waste pipe, the gas supply, the cabling and any existing extract back to the point where each leaves the room, not just the walls and windows.

Taking out a wall: the structural checks

A bigger kitchen often begins with a wall coming down. Inside a house, the Planning Portal says, altering walls should not call for a planning application, but the structure still has to be resolved. The first question for our in-house structural engineers is whether the wall bears load, and if so what bears on it; in a tall house over a basement, a ground-floor wall may hold up floors, partitions and a chimney breast. Under the Planning Portal’s load-bearing walls guidance, a new beam has to take whatever the wall used to carry, rest on at least 150mm of bearing either side and, if steel, normally be given fire protection. Building control sees the calculations before demolition starts.

Listing changes the question. Policy LP3 of Hackney’s Local Plan wants works to a listed building to keep faith with its original layout and the ranking of its rooms, so knocking two principal rooms together may not be accepted, and the appraisal puts fireplace removal on its list of jobs often requiring listed building consent. Seating a beam end in the party wall is the kind of cutting the Party Wall etc. Act 1996 may make notifiable, and the neighbour then gets notice before it happens.

Cooker extract and the route outside

Cooking produces steam and smells that have to be taken out of the house. New kitchens need a means of extract ventilation, according to the Planning Portal’s ventilation advice, and a refitted kitchen must hold on to or renew any extract it already has. A hood ducted to the open air is the arrangement we aim for, and the duct often fixes the hob’s position, since a short, straight run to an outside wall works better than a long one full of bends.

Where the duct breaks through needs thought in this conservation area. Hackney’s appraisal found original features largely intact here, so our preference is a vent at the back or side of the building. Listed status, under Hackney’s 2025 SPD, brings external works into the consent regime, and a new hole for a duct is one. The same SPD withholds permitted development rights from flats altogether, so we ask Hackney whether a grille on a flat’s wall calls for an application, and we read the lease, since the external walls may belong to the freeholder.

Hob, oven, sink and boiler

Moving the cooking moves the services with it. Gas pipework to a hob or range is the job of a Gas Safe registered engineer. Fresh circuits for the oven, induction hob and extractor are certified to BS 7671 by a registered competent person. GOV.UK counts a replacement fuse box and its connected electrics among works that may need Building Regulations approval, though an electrician in a competent person scheme spares you applying. Relocating a boiler out of the kitchen can bring approval into play too, since installing or replacing a heating system is on that same list.

A sink on an island or against the far wall needs a waste with enough fall to reach the drain, sometimes carried through the floor void, which in an older timber floor brings the conversation back to the joists and how much of them can be notched. In a converted house the sink waste may run into a stack several flats depend on, and the services clause in the lease tells you if the landlord’s agreement is needed for a new connection.

Kitchens in leasehold flats

A lease may put alterations behind the landlord’s permission, the Leasehold Advisory Service explains, and approvals from the council do not replace it. Where the kitchen is going into a room with no previous kitchen, the Planning Portal regards Building Regulations approval as likely, so that the room is adequately ventilated and drained, stays structurally sound and is safe for electrics and in a fire. Knocking the kitchen through to the sitting room may alter the means of escape from the flat, and that is agreed with building control while the scheme is still on paper.

Tall larder units, long worktops and appliances come through the communal entrance and round every landing, so each turn is measured before anything is ordered, the hall and stair are protected while deliveries come in, and delivery slots are fixed with the managing agent.

From layout to handover

We start from how you cook, wash up and store things, measured against the room with every door and drawer pulled open, then settle structure, ducting and service points before cabinet choices are made. The units may come from our own joiners’ bench, from a partner workshop, or be bought in ready-made, and all of them are drawn to the survey. On site, structural work and first-fix services come first, then plastering, the floor, cabinetry, worktops, appliances and decoration. Noisy days follow Hackney’s limits, weekdays 8am to 6pm and Saturdays 8am to 1pm; across the Tower Hamlets boundary, Saturday noise needs that council’s approval first. At handover you receive the electrical and gas paperwork and any building control completion certificate, and our 12-month aftercare/defects period begins.

Continue planning

The Victoria Park Village area guide · Kitchen renovation across London · Hampstead Architecture & Planning · Hampstead Chartered Surveyors & Building Consultancy

Discuss your project

Tell us what you are planning in Victoria Park Village

Share the property location, the work you have in mind and any drawings or permissions you already have.

£5M public liability, £10M employers' liability and contractors' all risks cover.

Design support: Hampstead Architecture & Planning. Surveying support: Hampstead Chartered Surveyors & Building Consultancy.

Your details will be used to respond to your enquiry. Read our privacy policy.