Kitchen renovation in Arkley

Updated 10 November 2026

Kitchens in Arkley bungalows, extended houses and Quinta Drive flats, with walls, gas, wiring and lease consents settled before any units are ordered.

Discuss your project

The kitchens Arkley homes are built around

Arkley housing runs from bungalows to large rebuilt houses, and the kitchen problem changes with each. Barnet’s planning register records owners replacing bungalows with two-storey houses, on Barnet Gate Lane as early as 1993 and on Arkley Lane in 2025, and extending existing houses at the back: a 2018 approval on Arkley View replaced a conservatory and garage with a side and rear extension, and a 2023 approval on Arkley Lane added a single-storey rear extension. Where an older kitchen moves into new space at the rear, its drain run, extract route and gas supply all have to follow it, so the kitchen and the extension are best drawn together; our Arkley house extension page covers the building side.

Flats are part of the picture too. Barnet Homes’ 2017 stock listing records tenanted council flats in Debenham Court, Elvaston Court and Weardale Court, all addressed on Quinta Drive, so if your flat is in one of those courts, find out whether Barnet Council is your landlord. Other flats sit inside houses: in 1979 a side extension holding a self-contained flat over a garage was approved on Barnet Road. A kitchen in either kind of flat shares structure and pipework with other homes, and that changes who has to agree to the work.

Removing walls and chimneys for an open kitchen

An open-plan kitchen usually means taking out a wall, and the first question is what that wall holds up. In a bungalow an internal wall may support ceiling joists or struts from the roof; in a two-storey house it may carry the floor above or a wall on the next storey. Our in-house structural engineers open up enough to see the joist direction and the bearings, then design the beam, its padstones and the temporary support, and the building control route is agreed before anything comes out.

If the beam bears into a party wall, or a chimney is to be taken off one, the party wall procedure may apply: GOV.UK includes cutting into a party wall and removing chimneys from one among the works a neighbour must be told about, while drilling to hang shelves or cabinets and changing wiring or sockets need no notice. In a listed building, such as the farmhouse and adjoining barn mapped near Galley Lane, internal alterations can need consent as well, because section 7 of the Listed Buildings and Conservation Areas Act 1990 requires works affecting a listed building’s character to be authorised.

Gas, electrics and getting cooking fumes outside

Gas is the strictest part of a kitchen refit. The Health and Safety Executive’s domestic gas guidance says anyone employed to work on gas appliances in a home must be Gas Safe registered, and that each engineer carries an ID card showing which appliances they are qualified to work on, which you are strongly encouraged to check before work starts. A freestanding cooker on a bayonet connector may be pulled out briefly for cleaning, but any other installation or reinstallation is gas work for a registered engineer. HSE also strongly recommends carbon monoxide alarms as an early warning.

Wiring follows its own rules. GOV.UK lists replacing a fuse box and its connected electrics, installing or replacing a heating system and adding radiators among the jobs that may need Building Regulations approval, and explains that you need not seek approval yourself if the work is done by someone registered with a competent person scheme. We plan the circuits for the hob, oven and appliances with the electrician at drawing stage, so the consumer unit and the certificates are settled before the walls are closed.

Extraction needs a route, not just a hood. We run the duct to an outside wall or the roof by the shortest workable path, keep the outlet away from windows and from the neighbours’ side, and allow for replacement air to come back into the room. In a house that has been extended, the old outside wall becomes an inside one, so the extract route is decided at the same time as the beam.

Kitchen work in a leasehold or council-owned flat

In any flat the lease comes first. The Leasehold Advisory Service, LEASE, explains that a lease may, depending on its wording, require the landlord’s permission before you alter the flat, and that this applies even where planning or building control approval is already in hand.

Where Barnet Council is the landlord, Barnet Homes’ October 2021 guidance on leasehold alterations applies on top. It counts any material change to a flat’s layout, services or interior as an alteration, including a change in how you connect into service pipes, and asks you to check that the lease allows the work and to obtain written consent before starting. Consent may be given for a new layout or for removing walls that carry no load, but replacing a boiler or doing any electrical work needs written consent, while aesthetic, non-intrusive changes such as new taps need none. New tiles in a kitchen must leave shared service panels, ventilation ducts and service pipes reachable, and an asbestos survey has to be carried out before work begins. Laminate flooring is usually allowed only on the ground floor. An administrative charge applies to each application, which can cover several alterations, so we put the whole kitchen into one request, and nothing starts until the decision arrives.

In a house divided into flats, Barnet’s Part 2 design and technical guidance asks that, as far as practical, bedrooms are not stacked over or under a neighbour’s kitchen, living room or bathroom, and that bedrooms do not sit side by side with them across a dividing wall where that can be avoided. Moving a kitchen within a converted flat is the moment to respect that, and to improve the sound insulation of the floor beneath new units and appliances.

Sequencing the refit and handing the room back

A kitchen refit follows a set order: measured survey and services check, drawings and appliance schedule, consents, then strip-out, first-fix plumbing, gas and wiring, plastering and flooring, cabinet fitting, worktop templating, second fix and testing. If you are living at home, we agree where a temporary sink and cooking point will go and when water, gas and power will be off, and in a flat we protect the shared stair and entrance and keep to any building rules on deliveries and noise.

At handover you receive the gas and electrical certificates the work requires, the building control certificate where approval was needed, appliance manuals and a note of where new pipes and cables run, and the kitchen is covered by our 12-month aftercare/defects period. If the kitchen is part of a wider scheme, our Arkley house refurbishment page and flat refurbishment page explain how the rest of the home is planned.

Continue planning

The Arkley area guide sets out the wider planning picture, and our London kitchen renovation page covers design choices. Design support is available from Hampstead Architecture & Planning, with surveying support from Hampstead Chartered Surveyors & Building Consultancy.

Discuss your project

Tell us what you are planning in Arkley

Share the property location, the work you have in mind and any drawings or permissions you already have.

£5M public liability, £10M employers' liability and contractors' all risks cover.

Design support: Hampstead Architecture & Planning. Surveying support: Hampstead Chartered Surveyors & Building Consultancy.

Your details will be used to respond to your enquiry. Read our privacy policy.