Kitchen renovation in Wanstead
Open up the back rooms of a late Victorian or Edwardian house, or refit the kitchen of a flat: settle the structure, the extract route and the services before the units are drawn.
Discuss your projectKitchens in Wanstead’s houses and flats
Kitchen work in Wanstead tends to fall into two kinds. In a house, whether part of the late Victorian terrace on Spratt Hall Road, an Edwardian house in Aldersbrook or on the Lake House Estate, or one of the individually designed detached houses along The Drive, a new kitchen often means rethinking how the rooms at the back connect, and sometimes removing a wall. In a flat, whether above a High Street shop, in the 1980s Eagle Lodge development or in one of the newer blocks in Wanstead Grove, the kitchen usually stays near the services it already uses, and the work is about layout, storage, extraction and the people living around you.
Either way, the order of decisions matters. Structure, the extract route, the gas supply and the electrical circuits come first, because together they fix where the hob, sink and tall units can go; cabinet doors, worktops and handles come last. Our designers and structural engineers lay out the room around those fixed points, so the joinery is ordered against a plan that is not going to move.
Knocking two rooms into one
An open-plan kitchen usually depends on the wall between two rooms, and in Redbridge that is a Building Regulations matter. The council’s building control guidance on load-bearing walls calls them fundamental to the structure of a house and says consent is needed before one is altered or removed. On more complicated work an engineer assesses the load the wall carries and designs a beam and any further supports; the engineer’s design is sent to the council to assess, and Redbridge advises holding off until it is approved. We supply the calculations, and on site the floors above are propped before the wall is cut.
Opening up near the stairs needs extra thought. Redbridge explains that walls around a staircase can offer protection in a fire, that altering them also needs consent, and that if they are removed the house must have adequate smoke detection and every room a window suitable for escape. Building control can tell you whether a given wall is part of that protection, so we ask early, while the plan can still change.
In a terrace, the ends of the new beam may sit in the party wall. Under the Party Wall Act, as GOV.UK’s guidance on neighbours and shared walls explains, the neighbour must be told before building work on or near the shared boundary, and cutting a pocket for a beam is a familiar trigger. Serving the notice early keeps it from becoming the thing everyone is waiting on.
Hoods, ducts and where the air comes out
An extractor works only as well as the duct behind it lets it. The Planning Portal’s note on extra ventilation for kitchens and bathrooms expects extraction in any newly formed kitchen. In a refit, existing extraction is kept or renewed, and a kitchen that has none is not required to add it. We settle the duct path before drawing cabinets, keeping it short, with few bends and sized to suit the hood, so that the hood’s position follows from the duct.
Where the duct ends, the change is visible from outside. Aldersbrook’s 2020 direction reaches the sides and back of a house as well as the front, so a new grille on any face is worth raising with Redbridge before the hole is made, and Spratt Hall Road’s direction applies to work facing the highway. Flats lack householder permitted development rights altogether, as Redbridge’s 2014 conservation area guidance confirms, which makes a vent through an outside wall a matter for the planning department and, if the lease reserves it, for the freeholder.
Gas, electrics and heating in a new kitchen
Moving a hob or adding circuits brings the regulations in. The GOV.UK approval page catches a new consumer unit and the circuits fed from it, and any new heating system or added radiators. The Planning Portal’s page on approval for kitchen work says new cabinets alone rarely need it, though wiring or drainage done during the refit may, and a kitchen in a room that has never had one will probably need approval so that its air, drains, structure, wiring and fire precautions are checked. Using a tradesperson registered under a competent person scheme means you do not apply for approval yourself.
Every kitchen circuit we install is certified to BS 7671 by a registered competent person, and hob, oven and boiler connections are made by a registered gas engineer. A boiler on the kitchen wall is a decision for the first design meeting, to keep, relocate or renew it, because its flue and the clearances around it set the wall units on either side.
A new kitchen in a flat
Kitchen plans in a flat start with the lease. Its alterations clause decides whether the freeholder’s agreement is needed, and LEASE is clear that approval from the council, for planning or building control, is no substitute (LEASE alterations advice). Relocating the sink means a new waste route to a stack that may serve other flats, and a hard floor in place of vinyl or carpet changes the sound reaching the home below, so both go on the drawing sent to the managing agent.
Deliveries are bulkier than for most rooms: base and tall units, worktops and appliances all travel up the common stair, so we measure stairs, door openings and the lift car before ordering, and book deliveries with the agent. Templating for worktops happens after the carcasses are fixed, and shared hallways are protected throughout and cleaned at the end.
Survey, fitting and handover
Each kitchen starts with a measured survey, a check of the floor, walls and services, and a talk about the way you cook and what has to fit. The design follows, with appliance sizes confirmed against the plan. On site, strip-out comes first, then any structural work and its inspection, the first fix of gas, water, waste and cables, plastering and the fitting of units; the worktops are templated and installed, and the second fix connects appliances and lighting.
At handover we run the appliances and the extract, pass on the electrical and gas certificates together with building control’s completion certificate where the work needed one, and go through the kitchen with you to note any snags. The 12-month defects period starts on completion.
Continue planning
The Wanstead area guide · Kitchen renovation across London · Hampstead Architecture & Planning · Hampstead Chartered Surveyors & Building Consultancy
Discuss your project
Tell us what you are planning in Wanstead
Share the property location, the work you have in mind and any drawings or permissions you already have.
£5M public liability, £10M employers' liability and contractors' all risks cover.
Design support: Hampstead Architecture & Planning. Surveying support: Hampstead Chartered Surveyors & Building Consultancy.