Kitchen renovation in Emerson Park
Kitchen renovation in Emerson Park houses and Sector 1 flats: opening up rooms, taking extraction outside and rearranging gas, water and power.
Discuss your projectKitchens in Emerson Park homes
Havering’s Emerson Park Policy Area guidance of 2009 paints the district as one of varied single family houses, mostly detached, with smaller semi-detached homes in some sectors and the flats gathered along Butts Green Road and Ardleigh Green Road in Sector 1. Kitchen work here follows that pattern. In a house, a common request is to join the kitchen to a dining or family room, move the sink or hob, and open the room towards the garden; in a flat, the layout is pinned down far more tightly by the building, the lease and the position of the shared pipes.
Planning law generally leaves purely internal alterations outside “development”, so a kitchen refit inside a house rarely calls for a planning application. The outside is a different matter. A new garden door, a changed window or a vent terminal on a wall facing the road should be checked against the householder permitted development rules and any condition on an earlier consent, and, if an application turns out to be needed, against the Policy Area rules, which judge building work partly by how it sits in the street scene.
Opening up a wall between rooms
Before the wall dividing kitchen from dining room comes down, our in-house architects, designers and structural engineers establish what it holds up: joists, masonry on the storey above, a chimney stack, occasionally part of the roof. The engineer designs the steel or timber beam, its end bearings and any padstones, and Havering’s building control team receives those calculations with the application. On the day the opening is formed, the floor above is propped, the rest of the house is sealed off from the dust, and the beam is inspected before it is boxed in and plastered.
Semi-detached houses add a neighbour to the decision. If the new beam has to sit in the wall you share with next door, or an old chimney breast on that wall is coming out, the Party Wall Act is involved: GOV.UK’s party wall pages name cutting into a shared wall and taking chimneys out of one as work the adjoining owner must be told about. We serve notice with the structural drawings attached, so the neighbour can see exactly what is planned.
Extraction and where the duct can go out
A cooker hood performs only as well as its route to open air. Kitchen extraction falls under Approved Document F, the ventilation guidance within the Building Regulations, and we prefer a hood ducted to the outside, on the shortest and straightest run the layout allows, because every bend and extra length of duct cuts what the fan can actually move.
The terminal position needs early thought. In a house, a route through the rear or side wall is usually the simplest and keeps a new grille off the street elevation. A duct across a ceiling has to work with the direction of the joists, and an island hob needs its duct planned before the ceiling is boarded. Flats are harder: the wall a duct would pass through normally belongs to the freeholder, so its position forms part of the lease consent, and if no outside route is possible that has to be known before the cabinets are drawn.
Gas, power and the boiler
Moving a hob or oven usually means new gas pipework, new circuits, or both. Gas pipework and appliance connections are carried out by a registered gas engineer. On the electrical side, GOV.UK lists replacing a fuse box and the wiring that runs from it among the jobs that need Building Regulations approval unless the electrician belongs to a competent person scheme, and a kitchen carrying more appliances than before sometimes needs exactly that. A registered competent person certifies the cooker, hob and appliance circuits to BS 7671.
Kitchens often house the boiler. Relocating it, or renewing it while the room is stripped, counts as installing or replacing a heating system, which GOV.UK also lists. The flue then becomes an outside question too, and in a flat a lease question as well, so its new position is settled with the rest of the layout rather than squeezed in at the end.
Kitchen work in a leasehold flat
Read the alterations clause of the lease before choosing a layout. Moving the sink or washing machine to another wall may need a fresh connection to a shared stack; a new hard floor can change what the flat below hears; and new holes for a duct or flue go through walls the landlord owns. As the Leasehold Advisory Service (LEASE) explains, consent under a lease is separate from planning and building control, and may still be required when both of those are already in place.
We send the managing agent drawings and a method statement covering protection of the common parts, delivery of units and worktops through the shared entrance, and removal of the old kitchen. Havering’s 2015 nuisance pack regards weekday building noise between 8am and 6pm, and Saturday work that finishes by 1pm, as reasonable, but block rules can be stricter, and where they are we keep to them. Units and worktops are measured and templated in the flat itself, so that long pieces can be carried up the stairs or fitted in the lift without damaging the landings.
Continue planning
The Emerson Park area guide · Kitchen renovation across London · Hampstead Architecture & Planning · Hampstead Chartered Surveyors & Building Consultancy
Discuss your project
Tell us what you are planning in Emerson Park
Share the property location, the work you have in mind and any drawings or permissions you already have.