Hampstead Renovations · London Design and Build

House Refurbishment and Renovation in London

One contract for the whole house, from the measured survey to handover.

Ross Alinari, Senior Building Surveyor and Construction Director. Hampstead Renovations Ltd, company number 16838595. £5M public liability, £10M employers' liability and contractors' all risks cover.

Completed exterior at Belsize Park Gardens after refurbishment
Belsize Park Gardens, NW3

Book a feasibility visit

We reply within one working day, Monday to Friday, 8am to 6pm.

Or call 020 7101 3168

What our clients say

“I would like to thank Ross and his team for their consistent commitment to quality and their unerring reliability. They delivered our property to specification and on time, proving to be an extremely effective, experienced, and proactive contractor.”

James WardInvestment Director, Belgravia

“A company where you get value for your money while at the same time achieving excellent quality. Their work is carried out on time and within budget. We’ve worked with them on multiple projects and they never disappoint.”

Brian InghamDirector, Green Evolution Limited

Updated

What a house refurbishment includes

A house refurbishment in London covers layout, structure, heating, plumbing, wiring, kitchens, bathrooms, joinery and finishes under one written JCT contract. Typical works fall within £150,000 to £300,000 plus VAT, set by written quotation from a feasibility visit and measured survey. In-house architects, designers, structural engineers and builders deliver to handover with a 12-month aftercare/defects period.

We refurbish the whole house under one contract. Layout, structure, heating, plumbing, wiring, kitchens, bathrooms, joinery and finishes are specified together.

The first visit is a feasibility visit. After the measured survey you agree the scope, and the written quotation follows that scope.

A listed building or a conservation area can require consent and like-for-like repair. An extension, a loft or a basement is priced as its own part of the same brief, only where that house needs it.

In-house architects, designers and structural engineers plan the work, and our build team carries it out. Electrical and gas work is carried out by qualified engineers.

Find your house refurbishment guide in North and North West London, Central London or West and South West London.

How a job is run

  1. Feasibility visit. We look at the home and agree the brief.
  2. Measured survey. In-house architects, designers and structural engineers plan the work.
  3. Scope and quotation. You receive a written quotation against the agreed specification.
  4. Consents. Planning, building regulations, the lease or the Party Wall etc. Act are identified where they apply. The decision sits with the council, the freeholder or the neighbour.
  5. Build and handover. One team carries the work through to handover.

The appointment ends with a 12-month aftercare/defects period.

House refurbishments we have published

Queen's Park, NW6

A double-fronted Victorian house, with a loft conversion and a reconfigured ground floor.

What sets the cost

The cost moves with the floor area and how much of the house is stripped back, structural openings, beams or an extension, how much of the heating, plumbing and wiring is renewed, the specification of the kitchens, bathrooms, joinery and finishes, a listing or a conservation area, and access for materials.

Listed status on its own does not remove the VAT. The quotation states the treatment, and a written quotation follows the feasibility visit and the agreed scope and specification.

House refurbishment scopes, cost drivers and quoting inputs

Typical scopeWhat changes the costWhat we need to quote
Targeted interior refurbishmentSelected rooms, finishes, lighting, joinery and targeted service upgrades without structural alteration.Number of rooms in scope, condition of existing plaster and floors, extent of heating, plumbing or electrical renewal, joinery and finish specification, and street-to-room access for materials.Feasibility visit, measured survey of the rooms in scope, room-by-room brief separating retained and replaced elements, and outline finish, lighting and joinery choices.
Whole-house refurbishment (internal layout & services)Full strip-out, internal layout changes, new heating, plumbing, wiring, kitchens, bathrooms, joinery and finishes within the existing shell.Total floor area, strip-out depth and any pre-2000 asbestos survey findings, full renewal of heating, hot water, plumbing and wiring, kitchen, bathroom and bespoke joinery specification, and whether rooms stay occupied during phased work.Feasibility visit, full measured survey of the house, any existing floor plans or surveys, agreed room layouts, kitchen, bathroom and material preferences, and whether you plan to stay or move out.
Whole-house refurbishment with structural openings, extension or loftWhole-house refurbishment combined with load-bearing beams, a rear or side extension, loft conversion or basement element.Load-bearing beam design, temporary support and foundations, external wall openings or glazing, drainage diversions, whether an extension, loft or basement is scoped alongside the core refurbishment, Building Regulations, planning and Party Wall requirements, and site access for deliveries.Feasibility visit, measured survey and structural assessment by our in-house engineers, any existing architectural drawings, planning permissions or Party Wall details, and confirmation of structural openings and finish specification.
Listed house or conservation area refurbishmentWhole-house refurbishment with like-for-like repair of historic windows, brickwork, plasterwork and joinery.Listed Building Consent or conservation area and Article 4 constraints, extent of like-for-like window, brick, stucco, plasterwork and joinery repair, whole-building moisture-safe insulation and heating design, and specialist fabric protection.Feasibility visit and measured survey recording historic fabric to retain or repair, property listing or conservation area details, any existing drawings, heritage advice or prior consents, and agreed repair and finish choices.

Typical London whole-house refurbishments fall within £150,000 to £300,000 plus VAT (written quotation from a feasibility visit and measured survey) — outline your project in our cost calculator.

Questions

What does a house refurbishment include?

Layout, structure, services, kitchens, bathrooms, joinery and finishes, in one agreed scope. A loft, extension or basement is identified on its own where the house needs it. Not every house needs every element.

How much does a house refurbishment cost?

£150,000 to £300,000 plus VAT. The floor area, how much is stripped back, structural work, new services, the specification, and a listing or difficult access move the price inside that range. A written quotation follows a feasibility visit.

How is a house refurbishment run?

A feasibility visit and a measured survey come first. In-house architects, designers and structural engineers plan the work. You then agree the scope and receive a written quotation. Consents are identified where they apply, the team builds the work, and handover includes a 12-month aftercare/defects period.

Can you refurbish a listed house?

Yes. A listed building or a conservation area can add consents and like-for-like repair. The survey separates what must stay from what can change, and the quotation states that scope.

Is a house renovation the same as a house refurbishment?

On this page the two phrases describe the same appointment: the house is surveyed, the scope is agreed, and one team carries the work. Redecoration of a room, or a single kitchen or bathroom, is a smaller scope and is quoted as that scope.

Does a house refurbishment need planning permission?

Internal alterations do not usually amount to development. External changes, an extension and excavation are checked against the address, the permitted-development limits and any Article 4 direction. Building regulations are a separate approval, and a party-wall notice is separate again where the Party Wall etc. Act applies.

How is a conservation area different from a listing?

A conservation area controls demolition and some external change across a district. A listing protects one building, and listed-building consent can be needed for internal work that affects its special interest. The survey records which of the two applies before the specification is drawn.

Can we live in the house during the work?

It depends on the structural work, the dust, and whether a kitchen and a bathroom can stay in use. Staying, phasing the floors, or moving out for part of the job is agreed before the programme. Temporary accommodation is a household cost and sits outside the build range.

Talk to us about this work

We reply within one working day, Monday to Friday, 8am to 6pm.

Request a call back

Leave your name and phone number and we will call you back about your house refurbishment.

Send us the details

Step 1 of 2: About your project Step 2 of 2: Your contact details
1. About your project
Optional guide range for house refurbishment. A written quotation follows a feasibility visit.
2. Your contact details
Optional. We store your answer with your enquiry to understand how people find us.

House refurbishment in North and North West London

  • Belsize Park

    Stucco villas and later red-brick houses need different repair specifications. Record the existing finish before choosing render or mortar.

  • Brondesbury Park

    For a Cavendish Road villa, record the bay windows and slate roof before deciding which parts need repair or replacement.

  • Crouch End

    Walk the delivery route before planning work in a Weston Park terrace. A side passage makes different arrangements possible from carrying everything through the house.

  • Dartmouth Park

    In a villa west of York Rise, survey the semi-basement together with the rooms above before opening a wall.

  • Golders Green

    Barnet’s town-centre conservation area covers part of Golders Green. Check the map for your house before specifying front-window replacements.

  • Hampstead

    On Church Row and in Frognal, identify the windows, brickwork and garden walls to retain before costing the interior work.

  • Hampstead Garden Suburb

    Set out repairs to the house and proposed external changes separately when preparing the brief for the Suburb Trust.

  • Hampstead Heath

    Compare original sashes, roof drainage and access in South End Green, the Vale of Health and Parliament Hill.

  • Highgate

    Mark the doors, windows and mouldings to keep before plotting routes for new heating pipes and wiring in a period house. See the heating and wiring work at Highgate West Hill.

  • Kentish Town

    On a terraced street, compare sash profiles, glazing bars and brick details before ordering replacements for one house.

  • Maida Vale

    A stucco-fronted pair and a brick terrace call for different repairs. Survey the façade and the route of services through the floors.

  • Muswell Hill

    On the Collins streets, record the brickwork, render and timber details before pricing repairs to an Edwardian frontage. See the Edwardian house refurbishment on Muswell Hill Road.

  • Primrose Hill

    Photograph the stucco, ironwork and sash profiles on a Chalcot terrace before commissioning repairs to the front.

  • Queen’s Park

    A Brent terrace and a Westminster estate cottage can fall under different guidance. Check the address before specifying changes to windows or the rear wall.

  • Regent’s Park

    For a terrace house, check its listing, borough and any estate licence before specifying changes to rooms or openings.

  • South Hampstead

    Check the address against Camden’s direction before specifying front doors, porches, boundary walls or exterior paint.

  • St John’s Wood

    For a house on Abbey Gardens, check which windows and roof details Westminster’s guidance covers before specifying replacements.

  • Swiss Cottage

    Identify whether the house is a former villa and check its conservation-area map before specifying work to the street frontage.

  • Totteridge

    Record the roof covering, chimney details and earlier repairs before combining roof work and insulation on an older village house.

  • West Hampstead

    In a family terrace, plan repairs to brickwork, slate and timber windows alongside the new heating and room layout.

More house refurbishment pages in North and North West London:

House refurbishment in Central London

  • Bayswater

    On Leinster Square, record the stucco mouldings and sash profiles along the terrace before asking for a façade repair quote.

  • Belgravia

    If Grosvenor’s Belgravia scheme covers your freehold, mark the existing and proposed load-bearing walls on the plans for a new opening.

  • Fitzrovia

    On Fitzroy Square, identify whether the frontage is stone or stucco before choosing a repair finish to match the adjoining houses.

  • Knightsbridge

    Trevor Square and Hans Town come under different councils. Check the authority and conservation guidance for your address before drawing a roof extension.

  • Lancaster Gate

    On a park-facing terrace, survey the stucco, first-floor balcony and parapet together so the repair specification fits the whole frontage.

  • Marylebone

    On a Harley Street terrace, photograph the sash depths, door surround and basement railings before specifying external repairs.

  • Mayfair

    If your Mayfair freehold falls within Grosvenor’s scheme, check proposed window and external wall repairs against its estate guidance before commissioning drawings.

  • Pimlico

    Around Warwick Square, survey the first-floor sashes and the stucco around them together before pricing repairs to the front of the house.

  • St James’s

    On Bury Street or Park Place, identify the brick, stone or terracotta before agreeing how the façade should be cleaned.

  • Westminster

    In a Smith Square or Lord North Street terrace, plan how heating and wiring will run between floors around the original stairs and joinery.

More house refurbishment pages in Central London:

House refurbishment in West and South West London

  • Barnes

    On Lonsdale Road, record the surviving stucco and boundary walls before specifying repairs to the front of the house.

  • Battersea

    On the Latchmere Estate, match the yellow stock brick and red bands across the terrace when choosing bricks for repairs.

  • Chelsea

    For a listed Cheyne Walk house, mark the original stairs, partitions and joinery on a plan before deciding where heating and wiring can run. Cheyne Walk listed house.

  • Chiswick

    On the Glebe Estate, record the original sashes and fireplaces before deciding how each room will be heated and ventilated.

  • Earl’s Court

    Use the neighbouring houses on your own terrace as the repair reference. Philbeach Gardens has bays, while Eardley Crescent and Kempsford Gardens have flat fronts.

  • Fulham

    In Moore Park, list which timber sashes, panelled doors and stone entrance steps can be repaired before pricing replacements.

  • Holland Park

    For an Addison Road villa, show the existing gap to the neighbouring house on your drawings before planning a side extension.

  • Kensington

    On the Phillimore Estate, compare the proposed roof alteration with the adjoining villa or terrace before drawing an extra storey.

  • Kew

    In Haverfield Gardens, protect the terracotta door surrounds and surviving tiled paths before bringing in scaffolding or materials.

  • Notting Hill and Notting Hill Gate

    On a Ladbroke house backing onto a communal garden, record the rear elevation as seen from the garden before changing windows or doors. Ladbroke Grove house refurbishment.

  • Parsons Green

    On a Peterborough Estate lion house, photograph the surviving terracotta finial and decorative brickwork before agreeing façade repairs.

  • Putney

    The West Putney conservation area has six character areas. Identify yours before specifying repairs to the windows, roof and frontage.

  • Richmond

    Around Richmond Green, specify which original sashes, plasterwork and front boundary details to keep before pricing the refurbishment.

  • South Kensington

    On a Thurloe Estate crescent, photograph the row as a whole and record what survives on each storey before altering the street elevation.

  • Wimbledon

    Around the Ridgway in Wimbledon Village, record the brickwork and timber detailing before choosing materials for repairs.

More house refurbishment pages in West and South West London:

House refurbishment in South East London

House refurbishment in East London

Where we work across London

Related work: flat refurbishment, kitchen renovation, bathroom renovation, house refurbishment costs, cost calculator and published case studies.

Surveying is a separate instruction to Hampstead Chartered Surveyors & Building Consultancy.

Planning, listing and the building itself

Two houses on the same street can need different consents. The survey records the address against the council’s planning map before anyone draws an extension.

What needs an application

Internal alterations do not usually amount to development. A new opening in an external wall, a rear or side extension, a loft dormer and any excavation are checked against when planning permission is required, the permitted-development limits, and any Article 4 direction that withdraws those limits on that street. An Article 4 direction is specific to the address. It is not assumed from the age of the house.

Where a planning application is made, GOV.UK sets a statutory time of 8 weeks, or 13 weeks for major development. That is the council’s period, not a promise of how long the building work will take.

Conservation area and listing

A conservation area and a listing are different controls. The conservation area limits demolition and some external change across a district. A listing protects one building. Historic England explains that listed-building consent can be needed for internal work that affects the special architectural or historic interest, not only for work that shows from the street. The Planning Portal says the council should decide a valid application within 8 weeks of validation. Like-for-like repair of windows, brick and joinery is specified from what is there, and it is written as its own line in the scope.

Building regulations and the party wall

Building regulations are separate from planning. A structural opening, a new stair, replacement windows, drainage and the electrical and heating work are checked against them. GOV.UK says a full-plans decision is expected within 5 weeks, or 2 months where you agree a longer period.

The Party Wall etc. Act is separate again, and it does not apply to every house. Where notice is required, GOV.UK says it is given between 2 months and a year before the work, and the neighbour should reply in writing within 14 days. A party-wall award is not planning permission.

The fabric

Terraces and semis share walls, a narrow route from the street to the garden, and neighbours on both sides. A detached house is checked for how the rooms, the services and the garden connect, and for whether one floor can stay in use while another is stripped. Roofs, external walls, floors, windows and any retained plaster or joinery are recorded before a specification is chosen.

Insulation, airtightness, heating and ventilation are designed as one. Historic England’s whole-building approach is the reference for older fabric: more insulation on its own does not settle where the moisture goes. Heating and hot water are sized to the house that remains after the layout changes, not to the house as it was.

Materials in a building put up or refurbished before 2000 can contain asbestos. HSE describes where it is found. The survey of the areas that will be opened is agreed before strip-out, and the work is done by the right contractor for that material. Temporary support, beam bearings and foundations are designed for that house. HSE guidance on structural stability is the reason a beam size is not copied from a similar terrace.

Materials and the specification

The written quotation names the joinery, the floor build-up, the worktops, the sanitaryware, the tiles, the heating and the electrical layout. Samples are chosen before the orders are placed. Allowances, exclusions, who supplies the appliances, and how a change is instructed are written down, so two quotations can be compared on the same brief. The contract is a written JCT contract. The 12-month aftercare/defects period applies to the completed work.

Listed status on its own does not remove the VAT. GOV.UK’s VAT guidance for builders is the reference, and the quotation states the treatment. Temporary accommodation, furnishings and garden work stay in the household budget. They are not folded into the build range.

Windows, external doors and the junction between a new floor and an old wall are specified from the survey, because those are the places a period house lets the weather in. The drawing says which windows are repaired, which are replaced, and which openings are new. The rooms that stay in use are agreed at the same time. A kitchen and a bathroom have to remain available if the household is staying, and the route from the street to the working area has to stay safe. Dust, a structural opening or the loss of a stair can make that impractical, which is why the decision is made at the survey rather than on the first morning of the strip-out.