House refurbishment in Emerson Park
Whole-house refurbishment for the detached and semi-detached family houses of Havering’s Emerson Park Policy Area, planned from one survey and one written scope.
Discuss your projectThe houses this page is about
The 2009 Policy Area document for Emerson Park introduces the district as mature and pleasant, with a distinctive character of varied, well kept single family detached houses in spacious and well landscaped grounds. Variety is the word that matters for a refurbishment. The area was not built to one pattern, so there is no standard floor plan to assume and no single house type whose faults can be predicted from the pavement.
The same document splits the area into six sectors. In sectors two, three and four it finds mainly medium-sized family houses and says there is “little scope for any further infilling”. Sector five combines detached houses of middling and generous size with smaller homes, often semi-detached, on more modest plots, and the document accepts semi-detached houses there where they suit. Sector six holds the larger houses on the widest plots. A whole-house job on a big detached house in sector six and one on a semi-detached house in sector five raise different questions: the first is often about long service runs, several bathrooms and a large roof, while the second brings a shared wall, and so a neighbour, into nearly every structural decision.
When outside work needs permission
Emerson Park sits outside Havering’s conservation areas, and the council has made no Article 4 direction for it alone. Most of a refurbishment happens indoors, and planning law generally treats changes confined to the interior as falling outside “development”, so the planning question tends to arise only when the outside of the house changes: different windows, a new roof covering, a porch, a widened drive. Householder permitted development rights may cover some of that, within the limits and conditions the government sets out for householders. Conditions on an old consent for the house can cut those rights back, so we read its planning history before anything is ordered.
When an application is needed, the council weighs it against the 2009 document and against Policy 28 of the Havering Local Plan, which backs well-designed work that sustains or enhances an area of special townscape or landscape character. The 2009 rule a refurbishment meets most often concerns planting: development that would cause a significant loss of the landscape features contributing to the area’s character is not permitted. A parking space cut into a front garden, or a brick wall in place of a hedge, should be weighed with that in mind. Because the appendix schedules properties number by number, and some roads fall in more than one sector, we confirm the sector for the exact house rather than the street.
Capel Nelmes, at 1 Sylvan Avenue, is listed at Grade II. For a listed house, anything that alters what makes it special, inside or out, needs listed building consent, so an interior refit there starts from the consent route rather than adding it at the end. Havering’s Local Heritage List, dated July 2024, also records buildings just beyond the Policy Area, such as the old timber-framed cottages on Wingletye Lane; the list is worth checking for any house near the edge.
Structure, heating, wiring and windows under the Building Regulations
Building control is a different approval from planning, and a whole-house refurbishment touches a good deal of it. On the GOV.UK list of alterations that may need approval are a new or replacement heating system, extra radiators, new windows and doors, fresh coverings on pitched or flat roofs, and a replacement fuse box together with its wiring. GOV.UK adds that an owner using a firm on a competent person scheme need not apply for approval themselves; in that case we collect the firm’s certificate for your handover file.
Taking out or altering a loadbearing wall is structural work. Our in-house architects, designers and structural engineers size the beam and its bearings before anything is propped, and the calculations go to Havering’s building control service. The council steers larger, more involved projects towards a full plans application, the most thorough of its three routes, the others being a building notice and regularisation.
Windows deserve their own note, because replacing them brings the ventilation rules into play. GOV.UK’s questions and answers on Approved Document F say that where an existing wall ventilator already meets the minimum equivalent area, no extra background ventilation is needed after the windows change. They also make clear that a disclaimer signed by the homeowner refusing background ventilators does not satisfy the requirement. We record the existing vents during the survey so the new frames are specified correctly the first time.
Neighbours, shared walls and trees
For a semi-detached house the Party Wall Act will often apply. The GOV.UK party wall guidance covers building right on the line between two plots and works to a wall that is already shared, giving cutting into the wall and removing chimneys from it as examples. A beam that bears into the shared wall, or a chimney breast taken out on that side, therefore usually means serving notice. We draw up the notices once the structural design shows exactly what is proposed, so the neighbour receives drawings rather than a vague description.
The gardens are as much a part of the place as the houses. Havering’s consent is needed before any work to a tree covered by a preservation order, and Policy 27 of the Local Plan looks for the trees and planting already on a site to be kept safe while construction is under way. On a refurbishment that means deciding before the start where the skip, stored materials and site welfare will go, keeping vans and loaded barrows off root areas and fencing off any planting that has to survive.
Havering’s nuisance pack of May 2015 treats building noise as reasonable on weekdays from 8am until 6pm, and on Saturday mornings from 8am until 1pm. It is guidance rather than a legal limit, but we plan the stripping-out and other loud work inside those hours and let the houses either side know when the noisiest days will fall.
Survey, sequence and handover
A whole-house scope depends on the survey behind it. We measure the house, look into the roof space, lift a few floorboards, test the wiring and heating and trace the drains, so that the written scope describes what is actually there. It separates repairs from alterations and flags every item that hangs on someone else’s decision, whether that is a tree consent, a party wall notice, listed building consent or a planning application.
The order of work usually runs from the outside in and from the top down. The roof and any new openings are made weathertight first and structural changes follow; first-fix wiring, plumbing and heating then go in while walls and floors are open. Building control inspects before anything is covered up, and only then come plastering, joinery, second fix and decoration. If the family stays at home while we work, we settle together which rooms they keep using and protect the routes between them.
The handover pack holds the completion certificate from building control, the electrical and heating certificates, commissioning records and manuals, and we walk the snagging list with you room by room. From then, a 12-month aftercare/defects period applies.
Continue planning
The Emerson Park area guide · House refurbishment across London · Hampstead Architecture & Planning · Hampstead Chartered Surveyors & Building Consultancy
Discuss your project
Tell us what you are planning in Emerson Park
Share the property location, the work you have in mind and any drawings or permissions you already have.