Structural work in St John's Wood ranges from a new opening in a villa to a basement under the garden, and each starts with an engineer's survey.

Our in-house architects, designers and structural engineers · St John's Wood specialists
Our in-house architects, designers and structural engineers · £5M public liability, £10M employers' liability and contractors' all risks cover · Independent surveying via Hampstead Chartered Surveyors & Building Consultancy

Westminster's City Plan requires a structural methodology statement for every basement development.

For openings, beams, chimney breast removal and underpinning, our engineers survey the structure, calculate the work and agree the building control and party wall routes before anything is taken out.

Source: Westminster City Plan 2019-2040 (2026, adopted January 2026)

New openings and beams

Where a new or wider opening is formed in an existing external wall, the wall above must be supported, typically by one or two beams.

A steel beam should normally be protected against fire, most often with two or more layers of plasterboard.

Inside a villa, opening the ground floor rooms usually means a steel or timber beam carried on padstones, with temporary props while the wall is removed.

Source: Planning Portal: Extensions, Building Regulations: Structural Opening

The engineer's first visit

Our structural engineer starts by working out how the house carries its loads: which walls are load-bearing, which way the floor joists run, and what sits above the part you want to change. In a villa that usually means lifting a board or two and looking into the roof.

The result is a short note with the options, a sketch of the steel or timber needed and what each option means for the rooms above and below, before you commit to drawings.

Props, needles and temporary works

Before a wall comes out, the floors and the wall above are held up on adjustable props, with steel needles through the brickwork where the load is heavy. The temporary works are designed with the permanent beam, so the sequence on site is agreed in advance.

Ceilings and cornices in the rooms around are protected, and props stand on spreader boards so they do not mark original floors.

Chimney breasts

Removing an internal chimney breast needs no planning permission, but rules on building regulations still apply.

Building regulations approval always applies to chimney breast removal, and the Planning Portal advises an engineer's design.

We check what the breast supports above, including any stack on the roof and the breast on the floor above, before deciding how to carry it.

Source: Planning Portal Interactive House: Do I need permission to remove chimney breasts?

Party walls

A building owner proposing work covered by the Party Wall etc Act 1996 must give adjoining owners notice in the way the Act sets down.

GOV.UK says notice is needed before building on the boundary, working on a party wall or digging below and near a neighbour's foundations.

If the owners cannot agree, surveyors settle the work in writing; that agreement is separate from planning permission and building regulations.

Sources: GOV.UK: Party Wall etc. Act 1996 guidance, GOV.UK: Party walls and building work

Underpinning and basements

Westminster's City Plan asks for a structural methodology statement for all basements, and a structural statement with a Flood Risk Assessment in flood zones 2 and 3 or surface water hotspots.

Basement projects that are not Level 1 or 2 fall under Level 3 of the Code of Construction Practice.

Underpinning is sequenced in short bays, each cast and cured before the next is dug, with monitoring of the neighbouring walls throughout.

Sources: Westminster City Plan 2019-2040 (2026, adopted January 2026), Westminster City Council: Code of Construction Practice (May 2026)

Structural repair in a listed house

Westminster's Policy 44 looks for listed buildings to keep their special interest, protecting original detail and historic fabric and restoring it where that is appropriate.

So in a listed villa we repair before we replace: a split joist is strengthened with a new timber bolted beside it, a decayed beam end is cut back and spliced, and a cracked arch is stitched rather than rebuilt. Where steel is unavoidable, it is hidden behind existing plaster, and the change goes to Westminster for listed building consent.

Source: Westminster City Plan 2019-2040 (2026, adopted January 2026)

Structural work inside a mansion flat

LEASE says a leaseholder needs the landlord's permission where the landlord owns structural walls that are to be knocked through, or shared floors and ceilings.

In a mansion block, an internal wall may carry the flats above, so we confirm its structure and the lease position before any opening is drawn. Where the landlord's consent is needed, its surveyor may ask to see the engineer's calculations.

Source: LEASE: alterations and home improvements (last updated 22 December 2025)

Cracks, movement and monitoring

Cracks in a St John's Wood house are often old and settled, but some come from tree roots, leaking drains or recent work next door. We record their width and pattern, fix tell-tales across the worst of them and read them over a period before deciding whether underpinning is needed at all.

Often the answer is to repair a drain or manage a tree and then stitch the brickwork, a much smaller job than new foundations.

Which Code level structural work falls under

Projects that fall outside Levels 1 to 3 of Westminster's Code are Level 4: they follow the Code's principles but have no formal approval of working practices.

A Level 4 project can be moved up to Level 3 where the local environment or the combined effect of nearby work justifies it.

Source: Westminster City Council: Code of Construction Practice (May 2026)

Pavement vaults

Basements may encroach no more than 1.8 metres under the highway, with at least 900mm between the road surface and the vault.

Before skips or heavy equipment are placed, structures such as vaults beneath the pavement need careful consideration.

Many St John's Wood houses have coal vaults under the front path; we survey them before any heavy plant arrives.

Sources: Westminster City Plan 2019-2040 (2026, adopted January 2026), Westminster City Council: Code of Construction Practice (May 2026)

Building control and exemptions

GOV.UK says building regulations approval is not needed for exempt projects, including most repairs and replacements.

Building regulations approval is different from planning permission, and you might need both.

Approval can come from the council's building control service or a registered private building control approver.

Structural work is almost never exempt, so we agree the building control route before the first prop goes in.

Sources: GOV.UK: when you don't need building regulations approval, GOV.UK: Building regulations approval

Working hours and heavy work

Westminster does not allow demolition, excavation or piling on Saturdays unless special permission has been granted.

Otherwise building work is allowed from 8am to 6pm on weekdays and 8am to 1pm on Saturdays.

We schedule breaking out and steel lifts for weekdays, and tell neighbours the days in advance.

Source: Westminster City Council: noise problems we can investigate

Questions about structural works in St John's Wood

Do I need an engineer to remove a wall?

For a structural wall, yes: the wall above any new opening needs supporting, usually on one or two beams.

Can I take out a chimney breast?

Planning permission is not needed for an internal breast, but building regulations approval always is.

When do I need to serve a party wall notice?

Before work on a party wall, building on the boundary or digging below and near a neighbour's foundations.

What does Westminster need for a basement's structure?

A structural methodology statement for every basement.

Can structural work happen on Saturdays?

Demolition, excavation and piling are not permitted on Saturdays without special permission.

What do structural works in St John's Wood cost?

Pricing: quoted after a feasibility visit.

Sources: Planning Portal: Extensions, Building Regulations: Structural Opening, Planning Portal Interactive House: Do I need permission to remove chimney breasts?, GOV.UK: Party walls and building work, GOV.UK: Party Wall etc. Act 1996 guidance, Westminster City Plan 2019-2040 (2026, adopted January 2026), Westminster City Council: noise problems we can investigate

Guides & Local Reading

Browse all guides Builders St John's Wood NW8 Full House Refurbishment St John's Wood NW8

Structural Works in Nearby Areas

Structural Works in Regent's Park Structural Works in Maida Vale Structural Works in Primrose Hill Structural Works in Swiss Cottage

Book a feasibility visit

Visit our studio or invite us to survey your home. We’ll assess scope, discuss design possibilities and provide an honest budget framework.

020 7101 3168Mon–Fri, 8am – 6pm
contact@hampsteadrenovations.co.ukWe respond within 24 hours

Consultation

We survey your property, discuss your vision and provide a clear budget framework.