Muswell Hill stands on clay at the edge of a plateau, with streets that fall steeply away, so digging below one of its houses is an engineering and planning question long before it becomes a room.

BS 8102 waterproofing · Muswell Hill basement design and build
Our in-house architects, designers and structural engineers · £5M public liability, £10M employers' liability and contractors' all risks cover · Independent surveying via Hampstead Chartered Surveyors & Building Consultancy

Haringey's Policy DM18 permits a new or extended basement only where the house and its neighbours stay stable, flood risk does not rise and the area's character is not harmed.

We say early, and plainly, when a site makes a basement a poor idea, and look at the loft or a rear addition instead.

Source: Haringey Council: Development Management DPD (Haringey Local Plan, adopted July 2017)

Clay, slopes and the old streams

The appraisal describes heavy clay at the edge of an Ice Age plateau, with streams once running off it.

Ground levels top 100 metres at the centre and drop on three sides, falling hardest down the east flank of the Broadway.

Slope and clay together decide how the walls of a basement must be held during digging, so a ground investigation comes before any drawing.

Source: Haringey Council: Muswell Hill Conservation Area Character Appraisal (Conservation Area No. 3, adopted 11 February 2008)

Haringey's basement policy

Haringey reports a rise in basement applications and wants them built without harm to neighbours, adjoining houses, flood risk or the area's character.

The tests run through stability (of the house, its neighbours and the highway, given the local geology), flood risk from any source, and the look of the property and the street.

We prepare the case against each test in turn, with the engineer's and the hydrologist's reports attached.

Source: Haringey Council: Development Management DPD (Haringey Local Plan, adopted July 2017)

Building under the garden

Beneath a garden, DM18 asks that valued trees are not harmed and that enough soil is kept for planting like the neighbours'.

Even a conservation-area tree with no preservation order needs six weeks' notice to Haringey before work, once its trunk is 7.5cm or more across at 1.5 metres.

A basement that stays under the house footprint avoids most of these questions, and we usually test that first.

Sources: Haringey Council: Development Management DPD (Haringey Local Plan, adopted July 2017), Haringey Council: Tree work in a conservation area

Light wells and front gardens

For a light well, Haringey weighs the building's character, the street and whether more than half the front garden would be lost.

It warns that light wells can harm a street where they are not already an established feature.

Small front gardens behind low walls are, in Haringey's words, an essential part of how these frontages were designed to meet the street.

At the front we look at a grille set into the path or a rear light well, rather than an open pit in the garden.

Sources: Haringey Council: Development Management DPD (Haringey Local Plan, adopted July 2017), Haringey Council: Muswell Hill Conservation Area Character Appraisal (Conservation Area No. 3, adopted 11 February 2008)

Sewer flooding and a way out

Haringey's Local Plan notes past sewer flooding in Muswell Hill, which matters most for a floor below the street.

It will not accept habitable rooms in basements in flood-prone areas without a reasonable means of escape.

Every scheme we draw has a pumped drain with a non-return valve and a second way out of the lower floor.

Source: Haringey Council: Development Management DPD (Haringey Local Plan, adopted July 2017)

The Basement Impact Assessment

A Basement Impact Assessment, by qualified independent assessors and paid for by the applicant, goes in with the application.

Haringey runs a separate householder advice service for a property with a basement, and can arrange advice on site.

We commission the assessment early, so its findings shape the design rather than arrive after it.

Sources: Haringey Council: Development Management DPD (Haringey Local Plan, adopted July 2017), Haringey Council: Planning advice services for householders

Houses built with a semi-basement

Some houses were built with lower floors already: Nos 29 to 33 Dukes Avenue have semi-basements that raise them above the street.

Dukes Avenue houses generally stand higher than the road, so a lower room there can be partly above ground at the front.

Refitting an existing lower floor is a different job from digging a new one, and we price it separately.

Source: Haringey Council: Muswell Hill Conservation Area Character Appraisal (Conservation Area No. 3, adopted 11 February 2008)

Digging on a Muswell Hill street

DM18 asks basement construction not to endanger road users or unreasonably disrupt neighbours, and to keep noise, vibration and dust down.

Each skip licence lasts no more than 28 days and must be sought five working days before it starts.

Scaffolding or hoarding on the pavement needs a Haringey licence.

Breaking out and piling stay inside Haringey's hours for noisy work, which start at eight and end at six on weekday evenings and at one on Saturday afternoons.

Sources: Haringey Council: Development Management DPD (Haringey Local Plan, adopted July 2017), Haringey Council: Skip/building materials licence, Haringey Council: Scaffolding, hoarding, container and crane licences, Haringey Council: Noise complaints

Party walls and underpinning

Excavating below the level of a neighbour's foundations, close to them, is one of the works the Party Wall Act makes notifiable.

Where neighbours disagree, appointed surveyors settle in writing what is done, when and how, and who pays for it.

We share the engineer's sequence for the underpinning with the party wall surveyors before anything is agreed.

Source: GOV.UK: Party walls and building work

Making the planning case in a conservation area

Haringey points out that, in a conservation area, an application can fail on conservation grounds alone.

Where a basement affects a heritage asset, the application must explain what makes the asset significant and how the excavation would change it.

Our heritage statement for a basement shows the front elevation before and after, the light well or grille drawn to scale, and the garden levels that the neighbours will see.

We also show what would be lost from the garden and how the planting will be put back over the roof of the new rooms.

Sources: Haringey Council: Planning permission in conservation areas, Haringey Council: Development Management DPD (Haringey Local Plan, adopted July 2017)

Archaeology near the old village

The 2008 appraisal records Muswell Hill Village as an Area of Archaeological Importance where medieval roads met.

Policy DM9 asks proposals affecting an Archaeological Priority Area to be judged on their effect on the remains.

Near the old village centre we check the current archaeology map before the dig is designed.

Sources: Haringey Council: Muswell Hill Conservation Area Character Appraisal (Conservation Area No. 3, adopted 11 February 2008), Haringey Council: Development Management DPD (Haringey Local Plan, adopted July 2017)

Muswell Hill basement questions

Will Haringey allow a basement under my house?

Only if it meets Policy DM18 on stability, flood risk and the area's character.

Do I need a Basement Impact Assessment?

Yes, it goes in with the application and is carried out by independent assessors.

Can I add a light well at the front?

Haringey looks at the building, the street and whether more than half the front garden would go.

Can the basement run under the back garden?

Only without harm to valued trees and with enough soil kept for planting.

Is flooding a concern in Muswell Hill?

Haringey records sewer flooding here, and habitable basement rooms need a reasonable means of escape.

Does basement work need a party wall notice?

Yes, where it digs below and near a neighbour's foundations.

Sources: Haringey Council: Development Management DPD (Haringey Local Plan, adopted July 2017), GOV.UK: Party walls and building work

Guides & Local Reading

Browse all guides Builders Muswell Hill N10

Basement Conversions in Nearby Areas

Basement Conversions in Crouch End Basement Conversions in Highgate Basement Conversions in Hampstead Garden Suburb Basement conversions regional guide Basement Conversions in Dartmouth Park

More Services in Muswell Hill

House Refurbishment Flat Refurbishment House Extensions Loft Conversions Kitchen Renovation Bathroom Renovation

Book a feasibility visit

020 7101 3168Mon–Fri, 8am – 6pm
contact@hampsteadrenovations.co.ukWe respond within 24 hours

Consultation

We survey your property, discuss your vision and provide a clear budget framework.

We reply within one working day, Monday to Friday, 8am to 6pm.

Muswell Hill history & architecture

Background on the streets, buildings and conservation history of Muswell Hill: The mossy well and the Broadway: Muswell Hill's name, village core and public buildings · Muswell Hill history and architecture

Chat with us!