Party Wall Agreements Guide for London

Updated 18 November 2026
Published by Hampstead Renovations | November 2024

For a London extension, loft conversion or basement, start with the drawing. Mark where steelwork will bear on a shared wall, where a new wall will sit and how deep the dig will go beside neighbouring foundations. Those details determine whether you need to give written notice under the Party Wall etc. Act 1996.

What is the Party Wall Act?

The Party Wall etc. Act 1996 provides a framework for preventing and resolving disputes in relation to party walls, boundary walls, and excavations near neighbouring buildings. It applies throughout England and Wales and is particularly important in London where terraced and semi-detached properties with shared walls are common.

Planning permission and Building Regulations approval are separate from the Act. A council decision does not settle notice requirements, and a neighbour’s consent under the Act does not grant planning permission. The government’s explanatory booklet includes sample notices and explains when an adjoining owner can ask a court to stop work.

What is a Party Wall?

The Act covers these shared walls and structures.

  • A wall that stands on the land of two or more owners and forms part of a building (e.g., the shared wall between terraced or semi-detached houses)
  • A masonry garden wall that stands astride the boundary and separates the land. This is a party fence wall. The wall itself must straddle the boundary. Projecting footings alone are insufficient.
  • The part of a wall built on one owner’s land that separates their building from a neighbour’s building

Party structures can also include floors and other parts of buildings shared between properties (common in conversions and flats).

When Do You Need Party Wall Agreements?

The Act covers three types of work:

1. Work Directly to Party Walls (Section 2):

  • Cutting into a party wall to form a structural bearing
  • Removing chimney breasts on party walls
  • Inserting a damp-proof course
  • Raising a party wall
  • Demolishing and rebuilding a party wall
  • Underpinning a party wall
  • Cutting into party walls to install beams (e.g., for loft conversions)
  • Exposing a party wall by demolishing the building against it and weatherproofing the exposed wall

2. Building New Walls on or at Boundaries (Section 1):

  • Building a new wall astride a boundary, which requires the adjoining owner’s written consent
  • Building a new wall up to the boundary, entirely on your land
  • If footings would cross the boundary, check the design separately. Special foundations on an adjoining owner’s land require their written consent.

3. Excavation Near Neighbouring Buildings (Section 6):

  • Within 3 metres horizontally of a neighbouring building or structure, any part of the proposed dig extends below the bottom of its foundations
  • Within 6 metres horizontally of a neighbouring building or structure, any part of the proposed dig meets the plane sloping down at 45 degrees from the bottom of its foundations towards the excavation

For a basement or extension, have the designer mark these section 6 excavation tests on a cross-section. Record the distance to the neighbouring structure and the foundation depths on the same drawing.

Works Not Requiring Party Wall Agreements

These are examples of minor work that will usually fall outside the notice procedure when it leaves the structural strength of the shared wall or floor intact.

  • Drilling into party walls to fix shelves, cabinets, or wall hangings
  • Plastering or decorating party walls
  • Installing electrical sockets or switches (if not cutting deeply into the wall)
  • Replacing a surface floor finish while leaving the shared floor structure intact
  • Routine maintenance that doesn't affect the structure
  • Work away from the boundary that leaves shared structures untouched and falls outside the excavation tests

If your works could weaken a shared wall, damage the other side or affect a shared floor, show the detail to an experienced building professional before starting.

The Party Wall Process: Step-by-Step

Step 1: Prepare Detailed Plans

Before serving notices, prepare detailed drawings showing:

  • Exact location and scope of proposed works
  • How party walls will be affected
  • Foundation depths and proximity to neighbouring properties
  • Structural changes proposed

Step 2: Serve Party Wall Notices

Give written notice to each adjoining owner affected by the work. The minimum notice periods depend on what you propose.

  • Two months before starting work for Section 2 (party wall) works
  • One month before starting work for Section 1 (new wall on boundary) works
  • One month before starting work for Section 6 (excavation) works

Use the notice that matches your work. The details to prepare include the following.

  • The building owner’s name and address and the address where the work will take place
  • Nature and details of proposed works
  • The date you propose to start the notified work
  • Plans and sections showing the location and depth for an excavation notice
  • For an excavation notice, a statement about any proposed work to underpin, strengthen or safeguard the neighbouring foundations

Identify the adjoining owners before serving notice. A flat can have both a freeholder and a qualifying leaseholder, and a property may be jointly owned. Give each affected owner the appropriate notice.

Step 3: Wait for Response

Keep a copy of the notice and any written reply. The consequences of a reply or silence depend on the work described.

  • Consent: A neighbour can agree in writing. Confirm the start date and consider recording the existing condition of the nearby rooms before the work begins.
  • Existing party structures and qualifying excavations If the adjoining owner does not give written consent within 14 days of service of a party structure notice or a section 6 excavation notice, a dispute is deemed to have arisen.

A different rule applies to a new wall at the boundary. If the adjoining owner does not consent in writing within 14 days to a wall astride it, keep the whole wall on your land. For a wall proposed wholly on your side up to the boundary, silence on its own does not prevent work after the one-month notice period.

Step 4: Appoint Surveyors (If Dispute Arises)

When a dispute arises under the Act, the owners can choose one surveyor together or appoint one each.

  • Agreed Surveyor: Both owners agree on one person to determine the disputed matters impartially.
  • Two Surveyors: Each owner appoints a surveyor. Both surveyors must act impartially when making the award.
  • Third Surveyor: Two appointed surveyors select a third at the outset. The third can be called on to determine a matter in dispute.

The surveyor or surveyors making an award decide who pays its reasonable costs under section 10 of the Act. Ask what inspections and meetings the proposed fee covers.

Step 5: Schedule of Condition

If a schedule of condition is prepared, agree access with your neighbour and record the areas the work might affect. The record can include the following.

  • Photographs of all relevant areas
  • Written descriptions of existing cracks, defects, and condition
  • Video surveys for comprehensive records

Keep a dated copy of the record so both owners can compare the condition before and after construction. Arrange any surveyor’s visit in advance.

Step 6: Party Wall Award

The appointed surveyor or surveyors resolve disputed matters in a written award. It can set out the following details.

  • Exact works to be undertaken
  • How and when works will be carried out
  • Protections for the neighbouring property
  • Access rights if required
  • Working hours and noise limitations
  • How the property will be made good if damaged

The award is served on both owners. Check its permitted start date, the notice period and any conditions about access or protection before the relevant works begin.

Step 7: Undertake Works

Carry out works in accordance with the Award. If you deviate from what's agreed, you may be in breach, potentially facing injunctions or damages claims.

Step 8: Post-Work Inspection

After completion, compare the condition record with the affected rooms or structure. If the work caused damage, record it and notify the appointed surveyor where there is an award. The Act provides for making good or compensation where applicable.

Costs of Party Wall Agreements

There is no standard surveyor fee. If the work solely benefits the building owner, that owner usually pays. If a wall needs repair or a neighbour asks for additional work for their benefit, the allocation can differ. Check what the award says about the costs.

One agreed surveyor. Ask for a fee proposal and check what it includes.

  • Whether the surveyor charges a fixed fee or an hourly rate
  • What the fee covers for preparing and serving the award
  • Which site visits and condition records are included

Two surveyors. Ask each surveyor to explain their fee. Depending on the project, allow for the following.

  • More complex works
  • Multiple affected neighbours
  • Basement conversions or significant excavations
  • The number of drawings, site inspections and technical questions the proposed fee covers

Complex Projects: fees agreed case by case

  • Large developments affecting multiple neighbours
  • Significant basement excavations or structural work
  • Disputes requiring extensive negotiations
  • Additional time if a disputed matter is referred to the third surveyor

Costs typically cover:

  • Reviewing plans and preparing Awards
  • Site visits and inspections
  • Schedules of condition (photography and documentation)
  • Negotiations between parties
  • Serving Awards
  • Post-work inspections if required

Common Mistakes and How to Avoid Them

Starting Work Without Serving Notices: The most serious mistake. Neighbours can seek injunctions stopping your work and claim damages. Always serve proper notices with adequate notice periods.

Serving Notices Too Late: Remember the two-month (Section 2) or one-month (Sections 1 and 6) notice periods. Obtain the adjoining owner’s written agreement before bringing the start date forward.

Incomplete or Vague Notices: Notices must clearly detail proposed works. Vague descriptions can be challenged. Include proper drawings and specifications.

Not Serving All Affected Owners: Check both distance and depth against the neighbouring building’s foundations. Apply the section 6 tests to each affected structure before identifying the owners who must receive notice.

Assuming Consent Means No Need for Precautions: With the neighbour’s agreement, record and date the condition of nearby rooms and features. Give both owners a copy.

Ignoring the Award Terms: Follow the scope, working hours and methods in the award. If the design changes, raise it with the appointed surveyor before carrying out the revised work.

DIY Approach for Complex Works: Owners can prepare their own notices. Where a dispute arises, the statutory surveyor must be someone who is not a party to that dispute.

Your Rights as a Building Owner

The Act gives you important rights:

  • Carry out work authorised by the Act after following the applicable procedure
  • Use the access that section 8 provides where it is necessary for the statutory work, subject to its notice requirements
  • Have a dispute about work covered by the Act determined by surveyors
  • Appoint a surveyor in a dispute or agree on one surveyor with the adjoining owner

Follow the notice and award procedures, avoid unnecessary inconvenience and address loss or damage the work causes under the Act.

Your Neighbour's Rights

Understanding your neighbour's rights helps ensure smooth processes:

  • Right to be notified before work starts
  • Appoint their own surveyor if a dispute arises, or agree on a single surveyor with you
  • Give or withhold written consent. The next step depends on the notice served.
  • Seek protection for their property while notified work is carried out
  • Seek compensation for qualifying loss or damage caused by the works
  • Right to reasonable working hours and methods

Maintaining good relationships with neighbours makes the process much smoother, even when formal procedures are required.

Party Walls in Different Property Types

Terraced Houses: A mid-terrace may share walls on both sides. Mark the beam bearings and the excavation on the plans to see which neighbouring owners are affected.

Semi-Detached Houses: Check work to the shared wall and measure any new foundations against buildings on both sides of the house.

Detached Houses: A detached house can still have a qualifying excavation or a new wall at the boundary. Check the foundation depths and the section 6 distances even when the houses share no wall.

Flats: Can be complex with party walls, party floors, and multiple owners in the same building. May need notices to multiple neighbours above, below, and beside.

Resolving Disputes

If the owners disagree about an award or a matter it covers, the available steps depend on the issue.

  • Ask the appointed surveyor to check whether the issue is already covered by the award
  • Where two surveyors are appointed, a disputed matter can be referred to the selected third surveyor
  • Either owner may appeal to the county court within 14 days beginning on the day the award is served on them
  • Seek legal advice promptly if you are considering an appeal

Keep the award, proof of service, drawings identified in the award and any relevant photographs together so both owners can check the scope and dates.

Planning an Extension or Basement

When you enquire about the building work, mention any notices or awards. Keep them with the drawings so the contractor can plan around the conditions. A surveyor appointed under the Act handles any dispute separately.

Call: 020 7101 3168 | Email: contact@hampsteadrenovations.co.uk

Discuss your project

Tell us what you are planning

Share the property location, the work you have in mind and any drawings or permissions you already have.

£5M public liability, £10M employers' liability and contractors' all risks cover.

Design support: Hampstead Architecture & Planning. Surveying support: Hampstead Chartered Surveyors & Building Consultancy.

Your details will be used to respond to your enquiry. Read our privacy policy.

Chat with us! Call Now: 020 7101 3168