Commercial reception refurbishment — the first 60 seconds of every client visit. Joinery, stone, signage, lighting, seating and AV containment, delivered to a fixed-price brief that signals brand quality from the door.
Brand workshop — mood boards, materials, brand guide input
Concept design and sample board
Detailed joinery and signage drawings
Procurement — stone, joinery veneers, fabric, lighting
Phased installation with maintained access
| Tier | Range | What's covered |
|---|---|---|
| Refresh | £80–£180 per sqft | Paint, joinery touch-up, new signage and lighting |
| Standard rebuild | £180–£360 per sqft | New desk, wall cladding, flooring, lighting, signage |
| Premium | £360–£620 per sqft | Stone, premium joinery, designer furniture, feature ceiling |
| Trophy / HQ | £620+ per sqft | Bespoke stone, full architectural commission, AV, art |
Figures are guide ranges — we provide a fixed quote after survey. City and Canary Wharf typically carry a 10–20% premium over outer zones.
Reception works typically phase around business hours where the reception must remain operational — protective hoarding with brand-matched print, with heavy joinery and stone installation confined to evenings and weekends.
Anonymised project outlines — full reference list with contact introductions available on request under NDA.
Scope · 220 sqm
Budget band · £680k
Programme · 8 weeks
Stone feature wall, bespoke desk, integrated AV directory
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 160 sqm
Budget band · £420k
Programme · 6 weeks
Timber cladding, biophilic wall, concierge coffee
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 360 sqm
Budget band · £1.1M
Programme · 14 weeks
Full lobby redesign including turnstiles and concierge
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Standard reception rebuild in a 120–200 sqm footprint: 4–6 weeks. Premium with stone: 6–8 weeks. Trophy with bespoke architecture: 8–14 weeks.
Yes — we phase works behind a brand-matched hoarding with a temporary desk inside the existing footprint. Heavy installation runs nights and weekends to minimise visitor impact.
Yes — we work with Boon Edam, Dormakaba, Kaba and client-preferred integrators. We provide the containment, power and fixing; the specialist commissions the hardware.
Large-format porcelain or stone on wall/desk, timber veneer on joinery (oak, walnut, fumed ash), engineered stone or terrazzo flooring, linear LED lighting, acoustic absorber behind signage.
Area hubs with estate approvals, managing-agent compliance packs and loading protocols held on file. Four live now — remaining six launch in coming weeks.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. No open-book markup.