Office renovation — modernising existing space without a full strip-out and re-fit. Targeted upgrades to layout, finishes, lighting and M&E, delivered while teams remain in occupation.
Condition survey and renovation brief workshop
Priced option pack — 'good / better / best' against budget
Phased delivery across 2–5 zones
Nightly dust-sealed segregation and air quality control
Floor-by-floor handover with snagging close-out
| Tier | Range | What's covered |
|---|---|---|
| Cosmetic refresh | £30–£55 per sqft | Paint, carpet, lighting, signage |
| Targeted renovation | £55–£95 per sqft | Partitioning adjustments, lighting upgrade, breakout zones |
| Full renovation | £95–£160 per sqft | New M&E, partitioning, tea points, meeting rooms |
Figures are guide ranges — we provide a fixed quote after survey. City and Canary Wharf typically carry a 10–20% premium over outer zones.
Renovation under occupancy is typically delivered as phased zones, with dust-sealed hoarding and night-shift for noise-generating works (demolition, chasing, drilling). A typical floor renovation runs 4–8 weeks with staff remaining in other zones.
Anonymised project outlines — full reference list with contact introductions available on request under NDA.
Scope · 7,200 sqft
Budget band · £380k
Programme · 8 weeks
Lighting, acoustic treatment, meeting rooms, breakout
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 5,400 sqft
Budget band · £215k
Programme · 5 weeks
Cosmetic refresh with branded signage and biophilic walls
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 9,800 sqft
Budget band · £520k
Programme · 10 weeks
Partitioning adjustments, new client suite, M&E upgrades
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Renovation is targeted modernisation without full strip-out — it reuses sound elements and focuses on impact. Refurbishment is a broader scope, typically including M&E alterations and partitioning. Fit-out replaces everything to let-ready or occupier-ready standard.
With phased zoning and night-shift for noisy works, typical disruption is limited to temporary relocation within the same floor. A 10,000 sqft renovation over 3 phases runs 8–12 weeks with no staff displacement.
Typically 30–50% cheaper per sqft because you retain sound ceilings, floor plates and core M&E. The trade-off is that the layout is constrained by existing infrastructure.
Area hubs with estate approvals, managing-agent compliance packs and loading protocols held on file. Four live now — remaining six launch in coming weeks.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. No open-book markup.