Reception Refurbishment across London Bridge (SE1). Commercial reception refurbishment — the first 60 seconds of every client visit. Joinery, stone, signage, lighting, seating and AV containment, delivered to a fixed-price brief that signals brand quality from the door.
Reception Refurbishment across London Bridge (SE1) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to The Shard, The News Building, More London Place 1–6, Blue Fin Building, Palestra among others. Teams mobilise from our London operations base, with direct transport links via London Bridge (Northern, Jubilee + National Rail + Thameslink), Borough (Northern), Bermondsey (Jubilee), Waterloo (Bakerloo, Jubilee, Northern, Waterloo & City + National Rail). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.
The London Bridge market is dominated by professional services (big four, pwc, ey), legal (norton rose fulbright, kirkland & ellis), consulting (accenture, deloitte digital), each with distinct reception refurbishment requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered reception refurbishment in trophy buildings including The Shard, The News Building, More London Place 1–6, Blue Fin Building.
SE1 spans the Shard (professional services, consulting, hospitality HQ), the More London estate (Ernst & Young, PwC, Norton Rose Fulbright), Bankside (Blue Fin, Palestra, government departments) and emerging Borough Market / Bermondsey Street (media, tech, design).
Southwark permits 08:00–18:00 Mon–Fri and 08:00–13:00 Sat for noisy works. The Shard imposes additional lift-booking windows and out-of-hours work restrictions on occupied floors. The Shard service yard accommodates large-scale fit-out but bookings are tight — typical lead time 5 days. More London service road operates 24/7 but with estate-management permits. Bankside benefits from wider loading flexibility.
Brand workshop — mood boards, materials, brand guide input
Concept design and sample board
Detailed joinery and signage drawings
Procurement — stone, joinery veneers, fabric, lighting
Phased installation with maintained access
| Tier | Range | What's covered |
|---|---|---|
| Refresh | £80–£180 per sqft | Paint, joinery touch-up, new signage and lighting |
| Standard rebuild | £180–£360 per sqft | New desk, wall cladding, flooring, lighting, signage |
| Premium | £360–£620 per sqft | Stone, premium joinery, designer furniture, feature ceiling |
| Trophy / HQ | £620+ per sqft | Bespoke stone, full architectural commission, AV, art |
This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.
Reception desk — delivered in London Bridge under estate-approved loading and out-of-hours protocols.
Wall cladding — delivered in London Bridge under estate-approved loading and out-of-hours protocols.
Stone feature wall — delivered in London Bridge under estate-approved loading and out-of-hours protocols.
Timber veneer — delivered in London Bridge under estate-approved loading and out-of-hours protocols.
Feature lighting — delivered in London Bridge under estate-approved loading and out-of-hours protocols.
Signage — delivered in London Bridge under estate-approved loading and out-of-hours protocols.
Wayfinding — delivered in London Bridge under estate-approved loading and out-of-hours protocols.
Directory board — delivered in London Bridge under estate-approved loading and out-of-hours protocols.
Southwark Council holds planning authority. Conservation areas at Borough, Bermondsey Street, Bankside, and riverside. London Bridge Character Area adds further overlay. Strategic views protect the Shard backdrop.
Reference list available on request under NDA.
Measured condition survey within 5 working days, including M&E, fabric and compliance review.
Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.
Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.
Lump-sum price against the design package. All prelims transparent.
CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.
Weekly client reports with photos, programme RAG, variation log, compliance status.
O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.
Reception Refurbishment in trophy towers (shard, news building — 10,000–20,000 sqft plates) is typically specified to refresh level — paint, joinery touch-up, new signage and lighting. Programme is governed by loading access and estate working-hours framework.
Reception Refurbishment in more london estate grade a (15,000–25,000 sqft plates) is typically specified to standard rebuild level — new desk, wall cladding, flooring, lighting, signage. Programme is governed by loading access and estate working-hours framework.
Reception Refurbishment in bankside modern stock (8,000–15,000 sqft plates) is typically specified to premium level — stone, premium joinery, designer furniture, feature ceiling. Programme is governed by loading access and estate working-hours framework.
Reception Refurbishment in converted period stock (borough, bermondsey) is typically specified to trophy / hq level — bespoke stone, full architectural commission, av, art. Programme is governed by loading access and estate working-hours framework.
Reception works typically phase around business hours where the reception must remain operational — protective hoarding with brand-matched print, with heavy joinery and stone installation confined to evenings and weekends.
Southwark permits 08:00–18:00 Mon–Fri and 08:00–13:00 Sat for noisy works. The Shard imposes additional lift-booking windows and out-of-hours work restrictions on occupied floors. The Shard service yard accommodates large-scale fit-out but bookings are tight — typical lead time 5 days. More London service road operates 24/7 but with estate-management permits. Bankside benefits from wider loading flexibility.
All London Bridge occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in London Bridge see Office Maintenance in London Bridge or Commercial Maintenance in London Bridge.
Anonymised project outlines from our London Bridge and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.
Scope · 220 sqm
Budget band · £680k
Programme · 8 weeks
Stone feature wall, bespoke desk, integrated AV directory
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 160 sqm
Budget band · £420k
Programme · 6 weeks
Timber cladding, biophilic wall, concierge coffee
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 360 sqm
Budget band · £1.1M
Programme · 14 weeks
Full lobby redesign including turnstiles and concierge
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Standard reception rebuild in a 120–200 sqm footprint: 4–6 weeks. Premium with stone: 6–8 weeks. Trophy with bespoke architecture: 8–14 weeks.
Yes — we phase works behind a brand-matched hoarding with a temporary desk inside the existing footprint. Heavy installation runs nights and weekends to minimise visitor impact.
Yes — we work with Boon Edam, Dormakaba, Kaba and client-preferred integrators. We provide the containment, power and fixing; the specialist commissions the hardware.
Large-format porcelain or stone on wall/desk, timber veneer on joinery (oak, walnut, fumed ash), engineered stone or terrazzo flooring, linear LED lighting, acoustic absorber behind signage.
Yes — we are approved with Shard Quarter / Sellar for CAT B fit-out and reactive repairs. Lift and service-yard bookings made via Shard tenant services.
More London (St Martins) operates a vetted contractor scheme with annual compliance renewal — CSCS, insurance, CDM, and estate-specific induction. We hold up-to-date approvals.
Yes — Bankside has wider loading access and less restrictive out-of-hours protocols. Typical CAT B fit-out runs 10–15% faster than the equivalent on More London or in the Shard.
Standard CAT B: £110–£170 per sqft. Shard and More London: £140–£220 per sqft due to loading and OoH premium. Bankside: £100–£150 per sqft for mid-tier stock.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
CAT A and CAT B fit-out for new leases, HQ relocations and floor consolidations.
Renovation of existing office space — modernising finishes, layout and services without full strip-out.
LED upgrades, emergency lighting, small power, containment. NICEIC certified.
Suspended ceiling grids, tiles, rafts, exposed-services finishes.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.