Office partitioning — demountable, acoustic, full-height glazed and solid-core systems. Installed under occupancy or during refurbishment, with Part E acoustic compliance and FIRAS fire-stopping certification.
Site survey and dimensional check — 48 hours
Partition and glazing specification with acoustic Rw rating
Off-site fabrication to reduce on-site dust and time
Night or weekend installation for occupied floors
Part E acoustic test report on request
| Tier | Range | What's covered |
|---|---|---|
| Demountable solid | £140–£240 per linear metre | Plasterboard face, steel studwork, Rw 42–48 |
| Single-glazed frameless | £380–£550 per linear metre | 10–12mm glass, minimal frame, Rw 35–42 |
| Double-glazed acoustic | £650–£900 per linear metre | 10+12mm glass, cavity, Rw 45–52 |
| Executive timber + glazed | £900+ per linear metre | Bespoke veneers, integrated blinds, Rw 48+ |
Figures are guide ranges — we provide a fixed quote after survey. City and Canary Wharf typically carry a 10–20% premium over outer zones.
Partition installation is commonly delivered as night-shift work in occupied offices — off-site fabrication reduces on-site time to under 2 hours per metre installed. Dust barriers, HEPA vacuum and scent-neutral silicones are standard.
Anonymised project outlines — full reference list with contact introductions available on request under NDA.
Scope · 12 rooms
Budget band · £180k
Programme · 3 weeks
Double-glazed acoustic, integrated blinds, manifestation
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 8 pods
Budget band · £95k
Programme · 2 weeks
Frameless glazed with branded manifestation
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 4 offices
Budget band · £125k
Programme · 2 weeks
Timber and glazed hybrid with integrated AV containment
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Yes — off-site fabrication means each linear metre installs in under 2 hours, so a typical meeting-room suite is completed over 2–3 night shifts.
Single-glazed Rw 35–42; double-glazed Rw 45–52; solid demountable Rw 42–48; bespoke systems Rw 55+. Independent Part E test reports on request.
Yes — EI30 and EI60 glazed fire screens are available where compartmentation requires them, with FIRAS-certified installation.
Demountable systems are specifically designed for reconfiguration without damaging ceiling, floor or walls. Typical reconfigure time is 1–2 days per meeting room.
Area hubs with estate approvals, managing-agent compliance packs and loading protocols held on file. Four live now — remaining six launch in coming weeks.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. No open-book markup.