Commercial office services across the City of London — EC1, EC2, EC3 and EC4. We hold estate approvals for Broadgate, Paternoster Square, Aldgate and the City Corporation's managed zones, and operate under the City's out-of-hours loading and noise framework.
The Square Mile is London's densest office market — 9m+ sqft of Grade A stock across trophy towers (22 Bishopsgate, Leadenhall Building, Walkie-Talkie, Scalpel) and period blocks around Liverpool Street and Moorgate. Occupiers are dominated by financial services, professional services, insurance and legal, with increasing tech and life-sciences take-up post-2022.
Reference list available on request under NDA.
Works in the City engage the City of London Corporation's planning framework and, for listed buildings, Listed Building Consent. Out-of-hours loading is tightly controlled under the Code of Construction Practice. Many buildings carry conservation area or heritage designations requiring specialist finishes and reversible alteration.
Standard working hours are 08:00–18:00 Mon–Fri; heavy noise works typically only permitted 08:00–18:00 or out-of-hours by managing-agent agreement. Trophy buildings commonly mandate loading slots booked 72 hours in advance.
Loading bays are pre-booked through estate management — Broadgate, Paternoster, Aldgate all operate tight loading windows. Vehicles over 7.5t face restrictions in the City's Ultra Low Emission Zone (ULEZ) and in some streets under the Bank Junction traffic restrictions.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
CAT A and CAT B fit-out for new leases, HQ relocations and floor consolidations.
End-of-lease dilapidations works to settle schedules of dilapidations quickly and compliantly.
Reactive and planned maintenance (PPM) for commercial offices — single trade or full FM cover.
Demountable, acoustic and glazed partitioning for meeting rooms, offices and open-plan subdivision.
Whole-building commercial maintenance for multi-let, retail, hospitality and mixed-use assets.
Fabric, flooring, ceiling, joinery, paint and minor M&E repairs — attended and completed under one PM.
Renovation of existing office space — modernising finishes, layout and services without full strip-out.
Yes — we hold up-to-date CSCS, insurance and compliance records on file with all major City estate managers. First mobilisation time from instruction is typically 5 working days.
Loading is pre-booked with the estate — for typical CAT B fit-out we request a rolling 72-hour slot allocation. For out-of-hours deliveries (6am–8am, 6pm–10pm) we book 2 weeks ahead.
Yes. Most works are phased into 6pm–6am night shifts with full dust-sealed segregation, low-noise tools and managed waste removal. Trading floors remain operational throughout.
Yes — our architectural team manages LBC applications and works with the City's conservation officers on reversible fit-out, historic joinery retention and compatible finishes.
5,000 sqft: 8–10 weeks. 15,000 sqft: 12–16 weeks. 30,000+ sqft: 18–24 weeks phased.
Liverpool Street, Moorgate, Bank, Cannon Street, Fenchurch Street, St Paul's, Aldgate and the new Elizabeth line at Liverpool Street and Farringdon.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10.