Office fit-out delivery for new lease take-ups, HQ relocations, floor consolidations and landlord CAT A works. Programme-driven, with a single fixed-price contract spanning design, build, M&E and handover.
Brief capture and space test-fit in 10 working days
Fixed CAT B design package — Stage 3 drawings, M&E schedules
Principal contractor appointment, CDM 2015 notification to HSE
Weekly client reports with photos and programme RAG status
Commissioning, O&M issue and 12-month defects period
| Tier | Range | What's covered |
|---|---|---|
| CAT A | £60–£95 per sqft | Base-build finish to let-ready standard |
| CAT A plus | £95–£140 per sqft | CAT A with added meeting rooms, kitchen, furniture-ready finishes |
| CAT B standard | £120–£200 per sqft | Full occupier fit-out with partitioning, joinery, M&E |
| CAT B premium / HQ | £220–£380 per sqft | Bespoke design, high-spec finishes, AV, branded reception |
Figures are guide ranges — we provide a fixed quote after survey. City and Canary Wharf typically carry a 10–20% premium over outer zones.
CAT B fit-out is typically delivered during standard working hours from a vacant demise. Where we take possession of an occupied floor for phased works, we operate night and weekend shifts with sealed segregation, low-noise equipment and managed loading slots booked with the managing agent.
Anonymised project outlines — full reference list with contact introductions available on request under NDA.
Scope · 14,500 sqft
Budget band · £2.3M
Programme · 16 weeks
Full CAT B including client suite, library, mediation rooms
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 6,200 sqft
Budget band · £1.1M
Programme · 12 weeks
Premium finish, bespoke joinery, boardroom AV containment
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 9,800 sqft
Budget band · £1.4M
Programme · 13 weeks
Open plan, acoustic pods, 12 meeting rooms, town hall space
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
CAT A is the landlord's base-build finish: raised floors, suspended ceilings, perimeter heating/cooling and emergency lighting. CAT A plus adds meeting rooms, kitchen, and sometimes furniture to let to occupiers immediately. CAT B is the tenant's full occupational fit-out: partitioning, branding, joinery, AV and finishes.
For a standard CAT B of 5,000–15,000 sqft we can mobilise within 3–4 weeks of instruction, subject to licence-to-alter. A full CAT B programme typically runs 10–16 weeks.
We self-deliver electrical and small-works mechanical through our in-house team, with specialist subcontractors on chillers, VRF and BMS. All works are covered by the main contract.
Yes — we work with the project assessor, supply tracked submittals for materials, air-quality data for paints and adhesives, and commissioning reports for M&E.
Yes. We prepare the drawings, M&E schedules, method statements and condition schedule required by the landlord's surveyor, and manage the approval process to completion.
Fixed lump-sum against an agreed specification. Variations are priced per item before issue. No percentage preliminaries markups.
Area hubs with estate approvals, managing-agent compliance packs and loading protocols held on file. Four live now — remaining six launch in coming weeks.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. No open-book markup.