Reception Refurbishment across Holborn (WC1, WC2). Commercial reception refurbishment — the first 60 seconds of every client visit. Joinery, stone, signage, lighting, seating and AV containment, delivered to a fixed-price brief that signals brand quality from the door.
Reception Refurbishment across Holborn (WC1, WC2) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to Sea Containers House, One New Oxford Street, Holborn Viaduct House, Warwick Court, Kingsway Tower among others. Teams mobilise from our London operations base, with direct transport links via Holborn (Central, Piccadilly), Chancery Lane (Central), Tottenham Court Road (Central, Northern, Elizabeth line), Russell Square (Piccadilly), Farringdon (Elizabeth line, Thameslink). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.
The Holborn market is dominated by top-tier law firms (magic-circle, silver-circle and mid-tier), media and publishing (guardian, warner bros), higher education (lse, soas proximity), each with distinct reception refurbishment requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered reception refurbishment in trophy buildings including Sea Containers House, One New Oxford Street, Holborn Viaduct House, Warwick Court.
Midtown spans the Inns of Court (legal), Gray's Inn Road (media — Guardian, Warner Bros Discovery), Kingsway and Holborn itself. Modern Grade A around Chancery Lane sits alongside period stock in Bloomsbury and around the Inns.
Camden and Westminster both restrict noisy works to 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Inns of Court buildings have additional sitting-term restrictions during legal terms. Kingsway is a red route — loading is permitted only in booked bays outside peak hours. Gray's Inn Road and High Holborn bays fill early; we book through Camden/Westminster parking services 48 hours ahead.
Brand workshop — mood boards, materials, brand guide input
Concept design and sample board
Detailed joinery and signage drawings
Procurement — stone, joinery veneers, fabric, lighting
Phased installation with maintained access
| Tier | Range | What's covered |
|---|---|---|
| Refresh | £80–£180 per sqft | Paint, joinery touch-up, new signage and lighting |
| Standard rebuild | £180–£360 per sqft | New desk, wall cladding, flooring, lighting, signage |
| Premium | £360–£620 per sqft | Stone, premium joinery, designer furniture, feature ceiling |
| Trophy / HQ | £620+ per sqft | Bespoke stone, full architectural commission, AV, art |
This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.
Reception desk — delivered in Holborn under estate-approved loading and out-of-hours protocols.
Wall cladding — delivered in Holborn under estate-approved loading and out-of-hours protocols.
Stone feature wall — delivered in Holborn under estate-approved loading and out-of-hours protocols.
Timber veneer — delivered in Holborn under estate-approved loading and out-of-hours protocols.
Feature lighting — delivered in Holborn under estate-approved loading and out-of-hours protocols.
Signage — delivered in Holborn under estate-approved loading and out-of-hours protocols.
Wayfinding — delivered in Holborn under estate-approved loading and out-of-hours protocols.
Directory board — delivered in Holborn under estate-approved loading and out-of-hours protocols.
Camden (north of High Holborn) and Westminster (south) split the area, with Bloomsbury Conservation Area, Gray's Inn Conservation Area and Kingsway Conservation Area all engaging. Listed buildings in the Inns of Court require LBC; Kingsway's Grade II*-listed facades restrict any external alteration.
Reference list available on request under NDA.
Measured condition survey within 5 working days, including M&E, fabric and compliance review.
Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.
Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.
Lump-sum price against the design package. All prelims transparent.
CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.
Weekly client reports with photos, programme RAG, variation log, compliance status.
O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.
Reception Refurbishment in modern grade a (kingsway, holborn) — 10,000–25,000 sqft plates is typically specified to refresh level — paint, joinery touch-up, new signage and lighting. Programme is governed by loading access and estate working-hours framework.
Reception Refurbishment in period refurbished stock (gray's inn road, bloomsbury) is typically specified to standard rebuild level — new desk, wall cladding, flooring, lighting, signage. Programme is governed by loading access and estate working-hours framework.
Reception Refurbishment in inns of court chambers buildings is typically specified to premium level — stone, premium joinery, designer furniture, feature ceiling. Programme is governed by loading access and estate working-hours framework.
Reception Refurbishment in listed victorian and georgian terraces is typically specified to trophy / hq level — bespoke stone, full architectural commission, av, art. Programme is governed by loading access and estate working-hours framework.
Reception works typically phase around business hours where the reception must remain operational — protective hoarding with brand-matched print, with heavy joinery and stone installation confined to evenings and weekends.
Camden and Westminster both restrict noisy works to 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Inns of Court buildings have additional sitting-term restrictions during legal terms. Kingsway is a red route — loading is permitted only in booked bays outside peak hours. Gray's Inn Road and High Holborn bays fill early; we book through Camden/Westminster parking services 48 hours ahead.
All Holborn occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in Holborn see Office Maintenance in Holborn or Commercial Maintenance in Holborn.
Anonymised project outlines from our Holborn and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.
Scope · 220 sqm
Budget band · £680k
Programme · 8 weeks
Stone feature wall, bespoke desk, integrated AV directory
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 160 sqm
Budget band · £420k
Programme · 6 weeks
Timber cladding, biophilic wall, concierge coffee
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 360 sqm
Budget band · £1.1M
Programme · 14 weeks
Full lobby redesign including turnstiles and concierge
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Standard reception rebuild in a 120–200 sqm footprint: 4–6 weeks. Premium with stone: 6–8 weeks. Trophy with bespoke architecture: 8–14 weeks.
Yes — we phase works behind a brand-matched hoarding with a temporary desk inside the existing footprint. Heavy installation runs nights and weekends to minimise visitor impact.
Yes — we work with Boon Edam, Dormakaba, Kaba and client-preferred integrators. We provide the containment, power and fixing; the specialist commissions the hardware.
Large-format porcelain or stone on wall/desk, timber veneer on joinery (oak, walnut, fumed ash), engineered stone or terrazzo flooring, linear LED lighting, acoustic absorber behind signage.
Yes — we have delivered refurbishment works in chambers buildings across Gray's Inn and Lincoln's Inn, operating within the Inn's own permit and fabric-protection regimes and around sitting terms.
Interior fit-out is generally unaffected, but any external alteration, signage or shopfront change engages conservation area consent. Our architects handle the applications.
8,000 sqft: 10–12 weeks. 15,000 sqft law-firm full CAT B with library and mediation rooms: 14–18 weeks.
Yes — our heritage team handles LBC applications for internal reversible fit-out, with conservation officer pre-application consultation built into the mobilisation programme.
Yes — Savills, Knight Frank, CBRE, JLL, Cushman & Wakefield, Colliers all hold our compliance pack on file.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
CAT A and CAT B fit-out for new leases, HQ relocations and floor consolidations.
Renovation of existing office space — modernising finishes, layout and services without full strip-out.
LED upgrades, emergency lighting, small power, containment. NICEIC certified.
Suspended ceiling grids, tiles, rafts, exposed-services finishes.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.