Office kitchens and tea points — from single-point boiling-water taps through to full staff kitchens with commercial appliances, coffee stations and dishwashing. Delivered with joinery, M&E and ventilation under one contract.
Site survey including drainage, water, power, extract
Space plan with headcount-based appliance specification
Joinery design in Corian, solid surface or stone
Appliance specification (Miele, Quooker, Franke, coffee)
Installation with M&E connection and commissioning
| Tier | Range | What's covered |
|---|---|---|
| Tea point standard | £120–£220 per sqft | Small joinery run, boiling water tap, fridge, dishwasher |
| Kitchenette | £180–£320 per sqft | Full counter, sink, appliances, storage, small cooking |
| Staff kitchen | £280–£480 per sqft | Full kitchen with commercial appliances, extract, food storage |
| Executive / concierge | £480+ per sqft | Designer joinery, stone tops, concierge coffee, bespoke |
Figures are guide ranges — we provide a fixed quote after survey. City and Canary Wharf typically carry a 10–20% premium over outer zones.
Kitchen installation in occupied offices is typically phased overnight — joinery is fabricated off-site and installed in 2–3 nights, with M&E connection and commissioning on the final shift.
Anonymised project outlines — full reference list with contact introductions available on request under NDA.
Scope · Full kitchen
Budget band · £180k
Programme · 4 weeks
Corian tops, Miele appliances, concierge coffee station
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 6 tea points
Budget band · £220k
Programme · 5 weeks
Matched joinery across floors with Quooker, fridges, dishwashers
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 2 kitchens
Budget band · £320k
Programme · 6 weeks
Stone tops, bespoke joinery, wine fridge, coffee machine
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Yes — both systems are standard in office tea point fit-out. We install Quooker Flex, Pro3, Cube, and Zip HydroTap Celsius/Classic/Arc per client preference.
Yes — compliant DW172 extract canopies with fire suppression, grease filtration and roof-level terminal. Part F ventilation sign-off and F-Gas certification where refrigeration is added.
Yes — we colour and veneer match to existing reception or meeting-room joinery for design continuity. Sample boards provided.
Area hubs with estate approvals, managing-agent compliance packs and loading protocols held on file. Four live now — remaining six launch in coming weeks.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. No open-book markup.