Commercial Kitchens & Tea Points in London Bridge

Planning the work for these premises

A workplace kitchen near Borough High Street needs a confirmed route for drainage and ventilation before the layout is fixed. An adapted warehouse can provide generous-looking space while leaving difficult connections or restrictions on penetrating retained fabric. Establish who controls the relevant services and what approval is required where pipework crosses common parts or another tenancy.

Test the arrangement for queues, open appliance doors and waste handling, with accessible use included in the design. Consider equipment noise where the kitchen adjoins quiet work or residential accommodation. Coordinate power demand and extract with the appropriate specialists. Measure the delivery path for worktops and assembled units, and decide joints before manufacture. Keep isolation and maintenance points reachable after fitting. Commission the installed connections and demonstrate appliance access at handover, leaving product and cleaning information that enables the occupier to maintain the kitchen without damaging surrounding retained work.

Discuss your project

Tell us what you are planning in London Bridge

Share the property location, the work you have in mind and any drawings or permissions you already have.

£5M public liability, £10M employers' liability and contractors' all risks cover.

Design support: Hampstead Architecture & Planning. Surveying support: Hampstead Chartered Surveyors & Building Consultancy.

Your details will be used to respond to your enquiry. Read our privacy policy.

✉