Commercial Kitchens & Tea Points in Farringdon
Planning the work for these premises
A kitchen or refreshment point in a Farringdon office should use a verified drainage and extract route. Before moving it into a more sociable position, establish the fall, connection rights and access needed to maintain the proposed pipework. Where retained brickwork or other character fabric is involved, show the intended fixings and penetrations for design review.
Test the arrangement with the occupier's actual pattern of breaks, including queues, appliance doors and waste storage. Resolve noise from equipment where the kitchen adjoins focused work or another tenancy. Check ventilation and electrical demand with the relevant specialists, rather than assuming a domestic appliance layout transfers unchanged to a workplace. Deliveries must fit the measured access, with worktop joints planned in advance. Provide shut-off locations, connection tests and cleaning guidance at completion, and demonstrate that maintenance panels can be opened without removing the fitted units.
Discuss your project
Tell us what you are planning in Farringdon
Share the property location, the work you have in mind and any drawings or permissions you already have.
£5M public liability, £10M employers' liability and contractors' all risks cover.
Design support: Hampstead Architecture & Planning. Surveying support: Hampstead Chartered Surveyors & Building Consultancy.
