MEES — Minimum Energy Efficiency Standards — restrict letting of sub-standard commercial property. The regulations bite in two phases, and the second bite (2027) moves the requirement to EPC C minimum. This guide covers tenant and landlord obligations, practical remediation, and timescales.

Published 2026-04-15Hampstead Renovations Commercial

What MEES requires today

From 1 April 2023, MEES prohibits landlords from letting commercial property in England and Wales with an EPC rating below E. This applies to new tenancies, lease renewals, and continuation of existing tenancies.

From 1 April 2027 (proposed), the minimum rises to EPC C. From 1 April 2030, the minimum may rise to EPC B — consultation underway.

Who MEES applies to

Landlords, primarily — they're responsible for the EPC rating. Tenants are affected indirectly:

Exemptions

Several exemptions exist but all time-limited:

All exemptions must be registered on the PRS Register within 5 years of becoming eligible.

Common remediation measures

  1. LED lighting upgrade

    Highest-impact intervention. Typical EPC lift: 1–2 bands. Cost £12–£22/sqft for commercial LED.

  2. HVAC controls and commissioning

    BMS tuning, variable-speed drives, sensor integration. Typical lift: 0.5–1 band.

  3. Lighting controls

    DALI and presence detection. Typical lift: 0.5–1 band.

  4. Renewable energy

    Solar PV on suitable roofs — often landlord-capex. Lift varies.

  5. Insulation

    Roof and walls where practical. Major capex, often listed-building constrained.

  6. Metering and monitoring

    Enables occupier behaviour change. Modest direct EPC impact.

Programme implications

EPC remediation typically plans around lease events:

How fit-out can improve EPC

Tenant CAT B fit-out can materially improve the building EPC. Key moves:

Where tenant is contributing to EPC uplift, negotiate dilapidations reduction at lease end. Where landlord is contributing to tenant fit-out, EPC uplift is usually factored into the contribution.

What we do

Fit-out delivery with EPC-lift-by-design — LED, DALI, BMS, commissioning all included in standard CAT B scope. See Office Fit-Out, Lighting & Electrical, Office Renovation.

FAQs

Does MEES apply to short leases?

Yes — any tenancy except <6 months or >99 years.

Can tenants refuse to move in because EPC is E?

E is currently MEES-compliant. From 2027 (proposed), tenants will refuse to take below-C space as the regulation tightens.

Who commissions the EPC?

Landlord on new lettings. Tenant on their own fit-out where MEP changes trigger an updated EPC.