Commercial flooring installation across London offices, retail and hospitality — carpet tile, LVT, resin, engineered timber and linoleum. Installed under occupancy with dust-sealed segregation, and over raised access flooring systems where required.
Sub-floor moisture and flatness survey within 48 hours
Sample boards — carpet, LVT, timber finishes
Sub-floor preparation including latex screed
Installation on approved adhesive or loose-lay system
Sealing, protection and handover photographs
| Tier | Range | What's covered |
|---|---|---|
| Carpet tile standard | £15–£32 per sqft | Commercial-grade carpet tile including adhesive and installation |
| LVT standard | £22–£45 per sqft | Luxury vinyl tile — wood-effect, stone-effect, commercial gauge |
| Engineered timber | £55–£110 per sqft | Engineered timber planks — oak, walnut, ash, pre-finished |
| Resin flooring | £45–£95 per sqft | Epoxy, polyurethane, MMA — kitchens, plant, commercial labs |
Figures are guide ranges — we provide a fixed quote after survey. City and Canary Wharf typically carry a 10–20% premium over outer zones.
Flooring replacement under occupancy is typically delivered as night shifts across 2–4 zones, with 12-hour cure for standard adhesive systems (6-hour for rapid-cure where programme demands). Full traffic permitted within 24 hours of installation.
Anonymised project outlines — full reference list with contact introductions available on request under NDA.
Scope · 22,000 sqft
Budget band · £510k
Programme · 5 weeks nights
Carpet tile and LVT across 3 floors over access floor
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 3,400 sqft
Budget band · £220k
Programme · 3 weeks
Pre-finished oak planks in executive and reception
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 180 sqm
Budget band · £38k
Programme · 4 nights
Epoxy with PU topcoat, slip rating R11
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Yes — we lift and replace carpet tile and LVT over existing access floor panels without disturbing the cable void. Panels are cleaned and panel-flatness re-tested pre-installation.
Carpet tile and LVT with rapid adhesive: 6 hours to light foot traffic, 24 hours to full load. Engineered timber with PU adhesive: 24–48 hours. Resin: 12–72 hours depending on system.
Yes — carpet tile is routed to Interface's ReEntry programme or Desso's Take-Back, LVT to manufacturer-led recycling schemes where available. Manifests provided.
Yes — most commercial carpet manufacturers hold 2–5 year dye-lot continuity. We verify lot availability before committing to a phased renewal programme.
Area hubs with estate approvals, managing-agent compliance packs and loading protocols held on file. Four live now — remaining six launch in coming weeks.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. No open-book markup.