Office Fit-Out across Hammersmith (W6). Office fit-out delivery for new lease take-ups, HQ relocations, floor consolidations and landlord CAT A works. Programme-driven, with a single fixed-price contract spanning design, build, M&E and handover.
Office Fit-Out across Hammersmith (W6) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to 3 Shortlands, One Lyric Square, 245 Hammersmith Road, The Ark, Landmark House among others. Teams mobilise from our London operations base, with direct transport links via Hammersmith (Piccadilly, District, Circle, Hammersmith & City), Barons Court (Piccadilly, District), Ravenscourt Park (District), Goldhawk Road (Hammersmith & City). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.
The Hammersmith market is dominated by media and advertising (disney, sony, virgin), consumer brand hq (l'oréal, coca-cola), retail hq (sports direct), each with distinct office fit-out requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered office fit-out in trophy buildings including 3 Shortlands, One Lyric Square, 245 Hammersmith Road, The Ark.
Hammersmith commercial stock centres on Hammersmith Broadway and the Thames riverside. Occupiers are dominated by media/advertising (Disney, Sony, Virgin, Coca-Cola), retail HQ (L'Oréal, Sports Direct), and consumer-brand HQ. Floor plates are typically 8,000–20,000 sqft.
LBHF standard: 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Less restrictive than City/Canary Wharf — heavy noise typically permitted through full Saturday mornings. Hammersmith Broadway loading bays require TfL parking suspension permits. Riverside properties have independent Thames-side logistics. A4/M4 access makes heavy delivery straightforward.
Brief capture and space test-fit in 10 working days
Fixed CAT B design package — Stage 3 drawings, M&E schedules
Principal contractor appointment, CDM 2015 notification to HSE
Weekly client reports with photos and programme RAG status
Commissioning, O&M issue and 12-month defects period
| Tier | Range | What's covered |
|---|---|---|
| CAT A | £60–£95 per sqft | Base-build finish to let-ready standard |
| CAT A plus | £95–£140 per sqft | CAT A with added meeting rooms, kitchen, furniture-ready finishes |
| CAT B standard | £120–£200 per sqft | Full occupier fit-out with partitioning, joinery, M&E |
| CAT B premium / HQ | £220–£380 per sqft | Bespoke design, high-spec finishes, AV, branded reception |
This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.
CAT A — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
CAT A plus — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
CAT B standard — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
CAT B premium — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Test-fit — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Space plan — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Demountable partitioning — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Acoustic glazing — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Hammersmith & Fulham Council holds planning. Hammersmith Broadway Conservation Area and Hammersmith Odeon (Grade II* listed) restrict external works. Riverside properties engage Thames policy constraints.
Reference list available on request under NDA.
Measured condition survey within 5 working days, including M&E, fabric and compliance review.
Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.
Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.
Lump-sum price against the design package. All prelims transparent.
CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.
Weekly client reports with photos, programme RAG, variation log, compliance status.
O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.
Office Fit-Out in modern grade a (8,000–20,000 sqft plates) is typically specified to cat a level — base-build finish to let-ready standard. Programme is governed by loading access and estate working-hours framework.
Office Fit-Out in 1990s/2000s commercial stock (refurb candidates) is typically specified to cat a plus level — cat a with added meeting rooms, kitchen, furniture-ready finishes. Programme is governed by loading access and estate working-hours framework.
Office Fit-Out in riverside trophy stock is typically specified to cat b standard level — full occupier fit-out with partitioning, joinery, m&e. Programme is governed by loading access and estate working-hours framework.
Office Fit-Out in mixed-use with ground-floor retail is typically specified to cat b premium / hq level — bespoke design, high-spec finishes, av, branded reception. Programme is governed by loading access and estate working-hours framework.
CAT B fit-out is typically delivered during standard working hours from a vacant demise. Where we take possession of an occupied floor for phased works, we operate night and weekend shifts with sealed segregation, low-noise equipment and managed loading slots booked with the managing agent.
LBHF standard: 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Less restrictive than City/Canary Wharf — heavy noise typically permitted through full Saturday mornings. Hammersmith Broadway loading bays require TfL parking suspension permits. Riverside properties have independent Thames-side logistics. A4/M4 access makes heavy delivery straightforward.
All Hammersmith occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in Hammersmith see Office Maintenance in Hammersmith or Commercial Maintenance in Hammersmith.
Anonymised project outlines from our Hammersmith and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.
Scope · 14,500 sqft
Budget band · £2.3M
Programme · 16 weeks
Full CAT B including client suite, library, mediation rooms
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 6,200 sqft
Budget band · £1.1M
Programme · 12 weeks
Premium finish, bespoke joinery, boardroom AV containment
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 9,800 sqft
Budget band · £1.4M
Programme · 13 weeks
Open plan, acoustic pods, 12 meeting rooms, town hall space
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
CAT A is the landlord's base-build finish: raised floors, suspended ceilings, perimeter heating/cooling and emergency lighting. CAT A plus adds meeting rooms, kitchen, and sometimes furniture to let to occupiers immediately. CAT B is the tenant's full occupational fit-out: partitioning, branding, joinery, AV and finishes.
For a standard CAT B of 5,000–15,000 sqft we can mobilise within 3–4 weeks of instruction, subject to licence-to-alter. A full CAT B programme typically runs 10–16 weeks.
We self-deliver electrical and small-works mechanical through our in-house team, with specialist subcontractors on chillers, VRF and BMS. All works are covered by the main contract.
Yes — we work with the project assessor, supply tracked submittals for materials, air-quality data for paints and adhesives, and commissioning reports for M&E.
Yes. We prepare the drawings, M&E schedules, method statements and condition schedule required by the landlord's surveyor, and manage the approval process to completion.
Fixed lump-sum against an agreed specification. Variations are priced per item before issue. No percentage preliminaries markups.
Yes — typically 15–25% cheaper per sqft due to wider loading access, fewer out-of-hours restrictions, and lower management-overhead. Standard CAT B: £100–£150 per sqft.
Yes — L'Oréal, Disney, Sony and other Hammersmith-cluster HQs hold our compliance pack on file. Standard BPSS vetting for media-brand secure zones.
10,000 sqft CAT B: 9–12 weeks. 20,000 sqft: 14–18 weeks. Generally 1–2 weeks faster than equivalent on a central-London estate due to loading flexibility.
Yes — including Thames-side access logistics, riverside glazing considerations and flood-risk compliant M&E routing.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
Demountable, acoustic and glazed partitioning for meeting rooms, offices and open-plan subdivision.
Whole-building decorating for commercial occupiers. Night and weekend delivery.
Suspended ceiling grids, tiles, rafts, exposed-services finishes.
Carpet tile, LVT, resin, engineered timber. Installed in live environments.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.