Office Fit-Out across King's Cross (N1C). Office fit-out delivery for new lease take-ups, HQ relocations, floor consolidations and landlord CAT A works. Programme-driven, with a single fixed-price contract spanning design, build, M&E and handover.
Office Fit-Out across King's Cross (N1C) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to 6 Pancras Square (Google UK HQ), 1 Triton Square, 10 Brock Street, 2 Kings Cross Square, R7 (Meta) among others. Teams mobilise from our London operations base, with direct transport links via King's Cross St Pancras (Victoria, Piccadilly, Northern, Circle, Metropolitan, Hammersmith & City + National Rail + Eurostar), Farringdon (Elizabeth line — 1 stop), Euston (Victoria, Northern + National Rail). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.
The King's Cross market is dominated by tech giants (google, meta, deepmind, astrazeneca r&d), media (guardian, universal music, havas), creative (central saint martins, design studios), each with distinct office fit-out requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered office fit-out in trophy buildings including 6 Pancras Square (Google UK HQ), 1 Triton Square, 10 Brock Street, 2 Kings Cross Square.
King's Cross estate spans from the Regent's Canal to Euston Road, with anchor HQ buildings, Granary Square, Coal Drops Yard retail and the Saint Pancras International corridor. Occupiers are heavily weighted to tech, media, creative industries and education (UAL Central Saint Martins).
Argent estate operates tenant-first access hours — construction traffic typically 7am–10am and 4pm–7pm, with heavy-noise works out-of-hours on occupied Pancras Square buildings. Estate service yard under Pancras Square — central booking through Argent tenant services, typical 3-day lead time. Coal Drops Yard and Granary have independent loading windows around retail trading.
Brief capture and space test-fit in 10 working days
Fixed CAT B design package — Stage 3 drawings, M&E schedules
Principal contractor appointment, CDM 2015 notification to HSE
Weekly client reports with photos and programme RAG status
Commissioning, O&M issue and 12-month defects period
| Tier | Range | What's covered |
|---|---|---|
| CAT A | £60–£95 per sqft | Base-build finish to let-ready standard |
| CAT A plus | £95–£140 per sqft | CAT A with added meeting rooms, kitchen, furniture-ready finishes |
| CAT B standard | £120–£200 per sqft | Full occupier fit-out with partitioning, joinery, M&E |
| CAT B premium / HQ | £220–£380 per sqft | Bespoke design, high-spec finishes, AV, branded reception |
This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.
CAT A — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
CAT A plus — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
CAT B standard — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
CAT B premium — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Test-fit — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Space plan — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Demountable partitioning — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Acoustic glazing — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Camden and Islington split the estate. King's Cross Central Masterplan provides framework-level planning for the majority of the estate, with Argent managing design-code compliance. Listed buildings (Granary, Coal Drops, Fish & Coal Building) restrict external alteration.
Reference list available on request under NDA.
Measured condition survey within 5 working days, including M&E, fabric and compliance review.
Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.
Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.
Lump-sum price against the design package. All prelims transparent.
CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.
Weekly client reports with photos, programme RAG, variation log, compliance status.
O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.
Office Fit-Out in trophy hq buildings (20,000–40,000 sqft plates) is typically specified to cat a level — base-build finish to let-ready standard. Programme is governed by loading access and estate working-hours framework.
Office Fit-Out in argent-designed grade a (pancras square 2–6) is typically specified to cat a plus level — cat a with added meeting rooms, kitchen, furniture-ready finishes. Programme is governed by loading access and estate working-hours framework.
Office Fit-Out in converted victorian industrial (granary, stanley building, fish & coal building) is typically specified to cat b standard level — full occupier fit-out with partitioning, joinery, m&e. Programme is governed by loading access and estate working-hours framework.
Office Fit-Out in mixed-use with ground-floor retail/f&b is typically specified to cat b premium / hq level — bespoke design, high-spec finishes, av, branded reception. Programme is governed by loading access and estate working-hours framework.
CAT B fit-out is typically delivered during standard working hours from a vacant demise. Where we take possession of an occupied floor for phased works, we operate night and weekend shifts with sealed segregation, low-noise equipment and managed loading slots booked with the managing agent.
Argent estate operates tenant-first access hours — construction traffic typically 7am–10am and 4pm–7pm, with heavy-noise works out-of-hours on occupied Pancras Square buildings. Estate service yard under Pancras Square — central booking through Argent tenant services, typical 3-day lead time. Coal Drops Yard and Granary have independent loading windows around retail trading.
All King's Cross occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in King's Cross see Office Maintenance in King's Cross or Commercial Maintenance in King's Cross.
Anonymised project outlines from our King's Cross and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.
Scope · 14,500 sqft
Budget band · £2.3M
Programme · 16 weeks
Full CAT B including client suite, library, mediation rooms
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 6,200 sqft
Budget band · £1.1M
Programme · 12 weeks
Premium finish, bespoke joinery, boardroom AV containment
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 9,800 sqft
Budget band · £1.4M
Programme · 13 weeks
Open plan, acoustic pods, 12 meeting rooms, town hall space
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
CAT A is the landlord's base-build finish: raised floors, suspended ceilings, perimeter heating/cooling and emergency lighting. CAT A plus adds meeting rooms, kitchen, and sometimes furniture to let to occupiers immediately. CAT B is the tenant's full occupational fit-out: partitioning, branding, joinery, AV and finishes.
For a standard CAT B of 5,000–15,000 sqft we can mobilise within 3–4 weeks of instruction, subject to licence-to-alter. A full CAT B programme typically runs 10–16 weeks.
We self-deliver electrical and small-works mechanical through our in-house team, with specialist subcontractors on chillers, VRF and BMS. All works are covered by the main contract.
Yes — we work with the project assessor, supply tracked submittals for materials, air-quality data for paints and adhesives, and commissioning reports for M&E.
Yes. We prepare the drawings, M&E schedules, method statements and condition schedule required by the landlord's surveyor, and manage the approval process to completion.
Fixed lump-sum against an agreed specification. Variations are priced per item before issue. No percentage preliminaries markups.
Yes — we hold Argent-specific contractor approval with CSCS, insurance, CDM and the estate's fit-out protocol sign-off.
Yes — approved for CAT B alterations, reactive works and dilapidations across occupied tenant floors on the estate. NDA and enhanced vetting (BPSS) for team members working in these buildings.
Yes — specialist handling of exposed brick, original cast iron, timber floors, and reversible fit-out on listed Granary, Fish & Coal and Stanley Building elements.
Argent Pancras Square Grade A CAT B: £130–£200 per sqft. Trophy HQ level: £250+ per sqft. Heritage industrial: £150–£250 per sqft reflecting specialist handling.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
Demountable, acoustic and glazed partitioning for meeting rooms, offices and open-plan subdivision.
Whole-building decorating for commercial occupiers. Night and weekend delivery.
Suspended ceiling grids, tiles, rafts, exposed-services finishes.
Carpet tile, LVT, resin, engineered timber. Installed in live environments.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.