Commercial Flooring across Liverpool Street & Bishopsgate (EC2, EC3). Commercial flooring installation across London offices, retail and hospitality — carpet tile, LVT, resin, engineered timber and linoleum. Installed under occupancy with dust-sealed segregation, and over raised access flooring systems where required.
Commercial Flooring across Liverpool Street & Bishopsgate (EC2, EC3) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to 22 Bishopsgate, 100 Liverpool Street, 1 Appold Street, 5 Broadgate, 201 Bishopsgate among others. Teams mobilise from our London operations base, with direct transport links via Liverpool Street (Elizabeth line, Central, Circle, Metropolitan, Hammersmith & City + National Rail + Stansted Express), Moorgate (Elizabeth line, Northern), Bank (Central, Northern, Waterloo & City, DLR). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.
The Liverpool Street & Bishopsgate market is dominated by global investment banks (ubs, deutsche bank), law firms (herbert smith freehills, reed smith), insurance and reinsurance, each with distinct commercial flooring requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered commercial flooring in trophy buildings including 22 Bishopsgate, 100 Liverpool Street, 1 Appold Street, 5 Broadgate.
The Broadgate-to-Bishopsgate corridor is one of London's highest-value commercial clusters — 22 Bishopsgate (the tallest in the Square Mile), the full Broadgate estate (13 buildings, 4m sqft), and the Shoreditch edge. Occupiers span banking, insurance, law, tech and media.
Broadgate strict out-of-hours loading: 6am–8am and 6pm–10pm for construction traffic. Trading hours on investment-banking floors (6:30am market opening) compress feasible heavy-noise windows — most work is 7pm–5am. Broadgate loading is booked 72 hours ahead via estate management. Skips prohibited on the estate — waste removed in enclosed trucks nightly. ULEZ compliance mandatory for all vehicles.
Sub-floor moisture and flatness survey within 48 hours
Sample boards — carpet, LVT, timber finishes
Sub-floor preparation including latex screed
Installation on approved adhesive or loose-lay system
Sealing, protection and handover photographs
| Tier | Range | What's covered |
|---|---|---|
| Carpet tile standard | £15–£32 per sqft | Commercial-grade carpet tile including adhesive and installation |
| LVT standard | £22–£45 per sqft | Luxury vinyl tile — wood-effect, stone-effect, commercial gauge |
| Engineered timber | £55–£110 per sqft | Engineered timber planks — oak, walnut, ash, pre-finished |
| Resin flooring | £45–£95 per sqft | Epoxy, polyurethane, MMA — kitchens, plant, commercial labs |
This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.
Carpet tile — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.
Loop pile — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.
Cut pile — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.
LVT click — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.
LVT glue-down — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.
Engineered oak — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.
Solid timber — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.
Parquet — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.
Broadgate estate works engage British Land's approved contractor scheme and internal fit-out guide. City of London Corporation holds planning authority for most of EC2/EC3. Conservation areas at Broad Street, Bishopsgate Goodsyard and Spitalfields add overlay.
Reference list available on request under NDA.
Measured condition survey within 5 working days, including M&E, fabric and compliance review.
Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.
Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.
Lump-sum price against the design package. All prelims transparent.
CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.
Weekly client reports with photos, programme RAG, variation log, compliance status.
O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.
Commercial Flooring in trophy towers (25,000–30,000 sqft plates) is typically specified to carpet tile standard level — commercial-grade carpet tile including adhesive and installation. Programme is governed by loading access and estate working-hours framework.
Commercial Flooring in broadgate campus grade a (15,000–22,000 sqft plates) is typically specified to lvt standard level — luxury vinyl tile — wood-effect, stone-effect, commercial gauge. Programme is governed by loading access and estate working-hours framework.
Commercial Flooring in period refurbished stock is typically specified to engineered timber level — engineered timber planks — oak, walnut, ash, pre-finished. Programme is governed by loading access and estate working-hours framework.
Commercial Flooring in listed liverpool street station-adjacent buildings is typically specified to resin flooring level — epoxy, polyurethane, mma — kitchens, plant, commercial labs. Programme is governed by loading access and estate working-hours framework.
Flooring replacement under occupancy is typically delivered as night shifts across 2–4 zones, with 12-hour cure for standard adhesive systems (6-hour for rapid-cure where programme demands). Full traffic permitted within 24 hours of installation.
Broadgate strict out-of-hours loading: 6am–8am and 6pm–10pm for construction traffic. Trading hours on investment-banking floors (6:30am market opening) compress feasible heavy-noise windows — most work is 7pm–5am. Broadgate loading is booked 72 hours ahead via estate management. Skips prohibited on the estate — waste removed in enclosed trucks nightly. ULEZ compliance mandatory for all vehicles.
All Liverpool Street & Bishopsgate occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in Liverpool Street & Bishopsgate see Office Maintenance in Liverpool Street & Bishopsgate or Commercial Maintenance in Liverpool Street & Bishopsgate.
Anonymised project outlines from our Liverpool Street & Bishopsgate and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.
Scope · 22,000 sqft
Budget band · £510k
Programme · 5 weeks nights
Carpet tile and LVT across 3 floors over access floor
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 3,400 sqft
Budget band · £220k
Programme · 3 weeks
Pre-finished oak planks in executive and reception
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 180 sqm
Budget band · £38k
Programme · 4 nights
Epoxy with PU topcoat, slip rating R11
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Yes — we lift and replace carpet tile and LVT over existing access floor panels without disturbing the cable void. Panels are cleaned and panel-flatness re-tested pre-installation.
Carpet tile and LVT with rapid adhesive: 6 hours to light foot traffic, 24 hours to full load. Engineered timber with PU adhesive: 24–48 hours. Resin: 12–72 hours depending on system.
Yes — carpet tile is routed to Interface's ReEntry programme or Desso's Take-Back, LVT to manufacturer-led recycling schemes where available. Manifests provided.
Yes — most commercial carpet manufacturers hold 2–5 year dye-lot continuity. We verify lot availability before committing to a phased renewal programme.
Yes — we hold up-to-date British Land approvals including CSCS, insurance, CDM and Broadgate-specific fit-out protocol sign-off.
6am–8am and 6pm–10pm for construction traffic. Heavy-noise works in 22 Bishopsgate and Broadgate trophy buildings only 8pm–5am. We plan the programme around these windows from day one.
Yes. Live trading-floor refurbishments are delivered in phased night shifts 8pm–5am with full dust-sealed segregation, low-noise tools, and completion of reinstatement before 6:30am market open.
10,000 sqft: 12–14 weeks. 25,000 sqft (full floor): 18–22 weeks. 100,000 sqft (multi-floor trophy): 32–40 weeks phased.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
CAT A and CAT B fit-out for new leases, HQ relocations and floor consolidations.
Renovation of existing office space — modernising finishes, layout and services without full strip-out.
Suspended ceiling grids, tiles, rafts, exposed-services finishes.
Demountable, acoustic and glazed partitioning for meeting rooms, offices and open-plan subdivision.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.