Commercial Flooring across Hammersmith (W6). Commercial flooring installation across London offices, retail and hospitality — carpet tile, LVT, resin, engineered timber and linoleum. Installed under occupancy with dust-sealed segregation, and over raised access flooring systems where required.
Commercial Flooring across Hammersmith (W6) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to 3 Shortlands, One Lyric Square, 245 Hammersmith Road, The Ark, Landmark House among others. Teams mobilise from our London operations base, with direct transport links via Hammersmith (Piccadilly, District, Circle, Hammersmith & City), Barons Court (Piccadilly, District), Ravenscourt Park (District), Goldhawk Road (Hammersmith & City). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.
The Hammersmith market is dominated by media and advertising (disney, sony, virgin), consumer brand hq (l'oréal, coca-cola), retail hq (sports direct), each with distinct commercial flooring requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered commercial flooring in trophy buildings including 3 Shortlands, One Lyric Square, 245 Hammersmith Road, The Ark.
Hammersmith commercial stock centres on Hammersmith Broadway and the Thames riverside. Occupiers are dominated by media/advertising (Disney, Sony, Virgin, Coca-Cola), retail HQ (L'Oréal, Sports Direct), and consumer-brand HQ. Floor plates are typically 8,000–20,000 sqft.
LBHF standard: 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Less restrictive than City/Canary Wharf — heavy noise typically permitted through full Saturday mornings. Hammersmith Broadway loading bays require TfL parking suspension permits. Riverside properties have independent Thames-side logistics. A4/M4 access makes heavy delivery straightforward.
Sub-floor moisture and flatness survey within 48 hours
Sample boards — carpet, LVT, timber finishes
Sub-floor preparation including latex screed
Installation on approved adhesive or loose-lay system
Sealing, protection and handover photographs
| Tier | Range | What's covered |
|---|---|---|
| Carpet tile standard | £15–£32 per sqft | Commercial-grade carpet tile including adhesive and installation |
| LVT standard | £22–£45 per sqft | Luxury vinyl tile — wood-effect, stone-effect, commercial gauge |
| Engineered timber | £55–£110 per sqft | Engineered timber planks — oak, walnut, ash, pre-finished |
| Resin flooring | £45–£95 per sqft | Epoxy, polyurethane, MMA — kitchens, plant, commercial labs |
This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.
Carpet tile — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Loop pile — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Cut pile — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
LVT click — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
LVT glue-down — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Engineered oak — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Solid timber — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Parquet — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Hammersmith & Fulham Council holds planning. Hammersmith Broadway Conservation Area and Hammersmith Odeon (Grade II* listed) restrict external works. Riverside properties engage Thames policy constraints.
Reference list available on request under NDA.
Measured condition survey within 5 working days, including M&E, fabric and compliance review.
Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.
Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.
Lump-sum price against the design package. All prelims transparent.
CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.
Weekly client reports with photos, programme RAG, variation log, compliance status.
O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.
Commercial Flooring in modern grade a (8,000–20,000 sqft plates) is typically specified to carpet tile standard level — commercial-grade carpet tile including adhesive and installation. Programme is governed by loading access and estate working-hours framework.
Commercial Flooring in 1990s/2000s commercial stock (refurb candidates) is typically specified to lvt standard level — luxury vinyl tile — wood-effect, stone-effect, commercial gauge. Programme is governed by loading access and estate working-hours framework.
Commercial Flooring in riverside trophy stock is typically specified to engineered timber level — engineered timber planks — oak, walnut, ash, pre-finished. Programme is governed by loading access and estate working-hours framework.
Commercial Flooring in mixed-use with ground-floor retail is typically specified to resin flooring level — epoxy, polyurethane, mma — kitchens, plant, commercial labs. Programme is governed by loading access and estate working-hours framework.
Flooring replacement under occupancy is typically delivered as night shifts across 2–4 zones, with 12-hour cure for standard adhesive systems (6-hour for rapid-cure where programme demands). Full traffic permitted within 24 hours of installation.
LBHF standard: 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Less restrictive than City/Canary Wharf — heavy noise typically permitted through full Saturday mornings. Hammersmith Broadway loading bays require TfL parking suspension permits. Riverside properties have independent Thames-side logistics. A4/M4 access makes heavy delivery straightforward.
All Hammersmith occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in Hammersmith see Office Maintenance in Hammersmith or Commercial Maintenance in Hammersmith.
Anonymised project outlines from our Hammersmith and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.
Scope · 22,000 sqft
Budget band · £510k
Programme · 5 weeks nights
Carpet tile and LVT across 3 floors over access floor
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 3,400 sqft
Budget band · £220k
Programme · 3 weeks
Pre-finished oak planks in executive and reception
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 180 sqm
Budget band · £38k
Programme · 4 nights
Epoxy with PU topcoat, slip rating R11
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Yes — we lift and replace carpet tile and LVT over existing access floor panels without disturbing the cable void. Panels are cleaned and panel-flatness re-tested pre-installation.
Carpet tile and LVT with rapid adhesive: 6 hours to light foot traffic, 24 hours to full load. Engineered timber with PU adhesive: 24–48 hours. Resin: 12–72 hours depending on system.
Yes — carpet tile is routed to Interface's ReEntry programme or Desso's Take-Back, LVT to manufacturer-led recycling schemes where available. Manifests provided.
Yes — most commercial carpet manufacturers hold 2–5 year dye-lot continuity. We verify lot availability before committing to a phased renewal programme.
Yes — typically 15–25% cheaper per sqft due to wider loading access, fewer out-of-hours restrictions, and lower management-overhead. Standard CAT B: £100–£150 per sqft.
Yes — L'Oréal, Disney, Sony and other Hammersmith-cluster HQs hold our compliance pack on file. Standard BPSS vetting for media-brand secure zones.
10,000 sqft CAT B: 9–12 weeks. 20,000 sqft: 14–18 weeks. Generally 1–2 weeks faster than equivalent on a central-London estate due to loading flexibility.
Yes — including Thames-side access logistics, riverside glazing considerations and flood-risk compliant M&E routing.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
CAT A and CAT B fit-out for new leases, HQ relocations and floor consolidations.
Renovation of existing office space — modernising finishes, layout and services without full strip-out.
Suspended ceiling grids, tiles, rafts, exposed-services finishes.
Demountable, acoustic and glazed partitioning for meeting rooms, offices and open-plan subdivision.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.