Office Dilapidations across Liverpool Street & Bishopsgate (EC2, EC3). End-of-lease dilapidations works — reinstatement to the standard set by the lease, schedule of dilapidations or pre-exit negotiation. We mobilise within 5 working days, deliver to landlord-acceptable finish, and provide handover documentation that closes the schedule.
Office Dilapidations across Liverpool Street & Bishopsgate (EC2, EC3) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to 22 Bishopsgate, 100 Liverpool Street, 1 Appold Street, 5 Broadgate, 201 Bishopsgate among others. Teams mobilise from our London operations base, with direct transport links via Liverpool Street (Elizabeth line, Central, Circle, Metropolitan, Hammersmith & City + National Rail + Stansted Express), Moorgate (Elizabeth line, Northern), Bank (Central, Northern, Waterloo & City, DLR). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.
The Liverpool Street & Bishopsgate market is dominated by global investment banks (ubs, deutsche bank), law firms (herbert smith freehills, reed smith), insurance and reinsurance, each with distinct office dilapidations requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered office dilapidations in trophy buildings including 22 Bishopsgate, 100 Liverpool Street, 1 Appold Street, 5 Broadgate.
The Broadgate-to-Bishopsgate corridor is one of London's highest-value commercial clusters — 22 Bishopsgate (the tallest in the Square Mile), the full Broadgate estate (13 buildings, 4m sqft), and the Shoreditch edge. Occupiers span banking, insurance, law, tech and media.
Broadgate strict out-of-hours loading: 6am–8am and 6pm–10pm for construction traffic. Trading hours on investment-banking floors (6:30am market opening) compress feasible heavy-noise windows — most work is 7pm–5am. Broadgate loading is booked 72 hours ahead via estate management. Skips prohibited on the estate — waste removed in enclosed trucks nightly. ULEZ compliance mandatory for all vehicles.
Schedule review with optional RICS-regulated input from sister practice Hampstead Chartered Surveyors
Priced Scott schedule against each item of the schedule
Principal contractor appointment, CDM 2015 notification
Works delivered in compressed 2–6 week programme
Joint inspection with landlord's surveyor on completion
Photographic and documentary handover pack
| Tier | Range | What's covered |
|---|---|---|
| Light reinstatement | £15–£30 per sqft | Make-good paint, carpet lift, partition removal |
| Standard reinstatement | £30–£55 per sqft | Full CAT A reinstatement — ceilings, floors, partitions, M&E reversions |
| Full CAT A reinstatement | £55–£95 per sqft | Including M&E strip and reinstatement, ceiling grid replacement |
| Complex reinstatement | £95+ per sqft | Listed buildings, bespoke elements, specialist flooring reinstatement |
This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.
Schedule review — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.
Scott schedule pricing — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.
Strip-out — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.
Partition removal — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.
Ceiling reinstatement — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.
Flooring make-good — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.
Redecoration — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.
M&E reinstatement — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.
Broadgate estate works engage British Land's approved contractor scheme and internal fit-out guide. City of London Corporation holds planning authority for most of EC2/EC3. Conservation areas at Broad Street, Bishopsgate Goodsyard and Spitalfields add overlay.
Reference list available on request under NDA.
Measured condition survey within 5 working days, including M&E, fabric and compliance review.
Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.
Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.
Lump-sum price against the design package. All prelims transparent.
CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.
Weekly client reports with photos, programme RAG, variation log, compliance status.
O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.
Office Dilapidations in trophy towers (25,000–30,000 sqft plates) is typically specified to light reinstatement level — make-good paint, carpet lift, partition removal. Programme is governed by loading access and estate working-hours framework.
Office Dilapidations in broadgate campus grade a (15,000–22,000 sqft plates) is typically specified to standard reinstatement level — full cat a reinstatement — ceilings, floors, partitions, m&e reversions. Programme is governed by loading access and estate working-hours framework.
Office Dilapidations in period refurbished stock is typically specified to full cat a reinstatement level — including m&e strip and reinstatement, ceiling grid replacement. Programme is governed by loading access and estate working-hours framework.
Office Dilapidations in listed liverpool street station-adjacent buildings is typically specified to complex reinstatement level — listed buildings, bespoke elements, specialist flooring reinstatement. Programme is governed by loading access and estate working-hours framework.
Dilapidations works are typically delivered in vacated demises during extended standard hours. Where loading restrictions apply (Broadgate, Canary Wharf), strip-out logistics are scheduled in pre-booked 6am–8am or 6pm–10pm slots with the estate management team.
Broadgate strict out-of-hours loading: 6am–8am and 6pm–10pm for construction traffic. Trading hours on investment-banking floors (6:30am market opening) compress feasible heavy-noise windows — most work is 7pm–5am. Broadgate loading is booked 72 hours ahead via estate management. Skips prohibited on the estate — waste removed in enclosed trucks nightly. ULEZ compliance mandatory for all vehicles.
All Liverpool Street & Bishopsgate occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in Liverpool Street & Bishopsgate see Office Maintenance in Liverpool Street & Bishopsgate or Commercial Maintenance in Liverpool Street & Bishopsgate.
Anonymised project outlines from our Liverpool Street & Bishopsgate and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.
Scope · 8,400 sqft
Budget band · £420k
Programme · 4 weeks
Full reinstatement after 10-year lease expiry
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 15,200 sqft
Budget band · £760k
Programme · 6 weeks
Trading floor strip-out, CAT A reinstatement, fire-stopping re-cert
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 3,100 sqft
Budget band · £145k
Programme · 2 weeks
Partition strip, redecoration, flooring make-good
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Independent schedule review is available through our RICS-regulated sister practice, Hampstead Chartered Surveyors (hampsteadcharteredsurveyors.co.uk/services/dilapidations). We recommend a pre-settlement review — schedules are often over-stated by 20–40%.
Within 5 working days of instruction. A typical 5,000 sqft reinstatement programme runs 2–4 weeks.
Yes. We hold estate approvals, CSCS records and insurance certificates on file with the major London estate managers, and work within their pre-booked loading, waste and out-of-hours regimes.
Yes. We price item-by-item against the Scott schedule so settlement and residual liability are clear.
We provide the photographic record, waste manifests, electrical/gas/fire certificates and building-regs completion certificates that support a Pre-action Protocol defence.
Yes — we hold up-to-date British Land approvals including CSCS, insurance, CDM and Broadgate-specific fit-out protocol sign-off.
6am–8am and 6pm–10pm for construction traffic. Heavy-noise works in 22 Bishopsgate and Broadgate trophy buildings only 8pm–5am. We plan the programme around these windows from day one.
Yes. Live trading-floor refurbishments are delivered in phased night shifts 8pm–5am with full dust-sealed segregation, low-noise tools, and completion of reinstatement before 6:30am market open.
10,000 sqft: 12–14 weeks. 25,000 sqft (full floor): 18–22 weeks. 100,000 sqft (multi-floor trophy): 32–40 weeks phased.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
Demountable, acoustic and glazed partitioning for meeting rooms, offices and open-plan subdivision.
Suspended ceiling grids, tiles, rafts, exposed-services finishes.
Carpet tile, LVT, resin, engineered timber. Installed in live environments.
Whole-building decorating for commercial occupiers. Night and weekend delivery.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.