Lighting & Electrical across Hammersmith (W6). Commercial lighting and electrical services — LED upgrades, emergency lighting, small power distribution, data containment and BMS interface. NICEIC-certified installation with full EICR reporting.
Lighting & Electrical across Hammersmith (W6) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to 3 Shortlands, One Lyric Square, 245 Hammersmith Road, The Ark, Landmark House among others. Teams mobilise from our London operations base, with direct transport links via Hammersmith (Piccadilly, District, Circle, Hammersmith & City), Barons Court (Piccadilly, District), Ravenscourt Park (District), Goldhawk Road (Hammersmith & City). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.
The Hammersmith market is dominated by media and advertising (disney, sony, virgin), consumer brand hq (l'oréal, coca-cola), retail hq (sports direct), each with distinct lighting & electrical requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered lighting & electrical in trophy buildings including 3 Shortlands, One Lyric Square, 245 Hammersmith Road, The Ark.
Hammersmith commercial stock centres on Hammersmith Broadway and the Thames riverside. Occupiers are dominated by media/advertising (Disney, Sony, Virgin, Coca-Cola), retail HQ (L'Oréal, Sports Direct), and consumer-brand HQ. Floor plates are typically 8,000–20,000 sqft.
LBHF standard: 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Less restrictive than City/Canary Wharf — heavy noise typically permitted through full Saturday mornings. Hammersmith Broadway loading bays require TfL parking suspension permits. Riverside properties have independent Thames-side logistics. A4/M4 access makes heavy delivery straightforward.
Existing system survey and EICR
Lighting calculation (Relux / Dialux) to BCO/CIBSE standards
Design package — fittings schedule, small power layout, control strategy
Installation with NICEIC certification
Commissioning and EICR sign-off
| Tier | Range | What's covered |
|---|---|---|
| LED swap-out | £12–£22 per sqft | Like-for-like LED replacement of existing fluorescent |
| Full LED scheme | £24–£42 per sqft | New fittings, DALI control, emergency compliance |
| Premium / bespoke | £45–£95 per sqft | Architectural lighting, decorative pendants, feature lighting |
| Full electrical re-wire | £45–£85 per sqft | Distribution, small power, lighting, controls |
This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.
LED upgrade — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Full re-wire — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Emergency lighting — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
DALI controls — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Wireless lighting — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Containment — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Small power — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Data cabling — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Hammersmith & Fulham Council holds planning. Hammersmith Broadway Conservation Area and Hammersmith Odeon (Grade II* listed) restrict external works. Riverside properties engage Thames policy constraints.
Reference list available on request under NDA.
Measured condition survey within 5 working days, including M&E, fabric and compliance review.
Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.
Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.
Lump-sum price against the design package. All prelims transparent.
CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.
Weekly client reports with photos, programme RAG, variation log, compliance status.
O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.
Lighting & Electrical in modern grade a (8,000–20,000 sqft plates) is typically specified to led swap-out level — like-for-like led replacement of existing fluorescent. Programme is governed by loading access and estate working-hours framework.
Lighting & Electrical in 1990s/2000s commercial stock (refurb candidates) is typically specified to full led scheme level — new fittings, dali control, emergency compliance. Programme is governed by loading access and estate working-hours framework.
Lighting & Electrical in riverside trophy stock is typically specified to premium / bespoke level — architectural lighting, decorative pendants, feature lighting. Programme is governed by loading access and estate working-hours framework.
Lighting & Electrical in mixed-use with ground-floor retail is typically specified to full electrical re-wire level — distribution, small power, lighting, controls. Programme is governed by loading access and estate working-hours framework.
Live-environment electrical works proceed under permit-to-work with trading-floor isolation slots booked with the occupier and managing agent. Main tests and commissioning typically require overnight isolation; final certification is issued within 24 hours.
LBHF standard: 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Less restrictive than City/Canary Wharf — heavy noise typically permitted through full Saturday mornings. Hammersmith Broadway loading bays require TfL parking suspension permits. Riverside properties have independent Thames-side logistics. A4/M4 access makes heavy delivery straightforward.
All Hammersmith occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in Hammersmith see Office Maintenance in Hammersmith or Commercial Maintenance in Hammersmith.
Anonymised project outlines from our Hammersmith and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.
Scope · 28,000 sqft
Budget band · £480k
Programme · 8 weeks nights
Full LED with DALI, 12-year ROI on Cat B wiring
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 9,200 sqft
Budget band · £260k
Programme · 5 weeks
Architectural lighting with Casambi wireless
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 15,000 sqft
Budget band · £85k
Programme · 3 weeks
BS 5266 upgrade across 4 floors
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Yes — LED swap-out using existing circuits is common where the existing wiring is sound (post-EICR). Typical ROI on energy savings is 2–4 years.
Yes — we install Tridonic, Lutron, Casambi and Helvar systems, with commissioning and training for the FM team.
Yes — lighting is typically the largest single electrical load in an office. An LED upgrade with controls can lift an EPC from D/E into B/C territory.
Yes — annual full-duration discharge testing and monthly flick tests are offered under a PPM contract. Certificates to BS 5266 provided.
Yes — typically 15–25% cheaper per sqft due to wider loading access, fewer out-of-hours restrictions, and lower management-overhead. Standard CAT B: £100–£150 per sqft.
Yes — L'Oréal, Disney, Sony and other Hammersmith-cluster HQs hold our compliance pack on file. Standard BPSS vetting for media-brand secure zones.
10,000 sqft CAT B: 9–12 weeks. 20,000 sqft: 14–18 weeks. Generally 1–2 weeks faster than equivalent on a central-London estate due to loading flexibility.
Yes — including Thames-side access logistics, riverside glazing considerations and flood-risk compliant M&E routing.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
CAT A and CAT B fit-out for new leases, HQ relocations and floor consolidations.
Reactive and planned maintenance (PPM) for commercial offices — single trade or full FM cover.
Renovation of existing office space — modernising finishes, layout and services without full strip-out.
Suspended ceiling grids, tiles, rafts, exposed-services finishes.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.