Lighting & Electrical across King's Cross (N1C). Commercial lighting and electrical services — LED upgrades, emergency lighting, small power distribution, data containment and BMS interface. NICEIC-certified installation with full EICR reporting.
Lighting & Electrical across King's Cross (N1C) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to 6 Pancras Square (Google UK HQ), 1 Triton Square, 10 Brock Street, 2 Kings Cross Square, R7 (Meta) among others. Teams mobilise from our London operations base, with direct transport links via King's Cross St Pancras (Victoria, Piccadilly, Northern, Circle, Metropolitan, Hammersmith & City + National Rail + Eurostar), Farringdon (Elizabeth line — 1 stop), Euston (Victoria, Northern + National Rail). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.
The King's Cross market is dominated by tech giants (google, meta, deepmind, astrazeneca r&d), media (guardian, universal music, havas), creative (central saint martins, design studios), each with distinct lighting & electrical requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered lighting & electrical in trophy buildings including 6 Pancras Square (Google UK HQ), 1 Triton Square, 10 Brock Street, 2 Kings Cross Square.
King's Cross estate spans from the Regent's Canal to Euston Road, with anchor HQ buildings, Granary Square, Coal Drops Yard retail and the Saint Pancras International corridor. Occupiers are heavily weighted to tech, media, creative industries and education (UAL Central Saint Martins).
Argent estate operates tenant-first access hours — construction traffic typically 7am–10am and 4pm–7pm, with heavy-noise works out-of-hours on occupied Pancras Square buildings. Estate service yard under Pancras Square — central booking through Argent tenant services, typical 3-day lead time. Coal Drops Yard and Granary have independent loading windows around retail trading.
Existing system survey and EICR
Lighting calculation (Relux / Dialux) to BCO/CIBSE standards
Design package — fittings schedule, small power layout, control strategy
Installation with NICEIC certification
Commissioning and EICR sign-off
| Tier | Range | What's covered |
|---|---|---|
| LED swap-out | £12–£22 per sqft | Like-for-like LED replacement of existing fluorescent |
| Full LED scheme | £24–£42 per sqft | New fittings, DALI control, emergency compliance |
| Premium / bespoke | £45–£95 per sqft | Architectural lighting, decorative pendants, feature lighting |
| Full electrical re-wire | £45–£85 per sqft | Distribution, small power, lighting, controls |
This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.
LED upgrade — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Full re-wire — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Emergency lighting — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
DALI controls — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Wireless lighting — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Containment — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Small power — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Data cabling — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Camden and Islington split the estate. King's Cross Central Masterplan provides framework-level planning for the majority of the estate, with Argent managing design-code compliance. Listed buildings (Granary, Coal Drops, Fish & Coal Building) restrict external alteration.
Reference list available on request under NDA.
Measured condition survey within 5 working days, including M&E, fabric and compliance review.
Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.
Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.
Lump-sum price against the design package. All prelims transparent.
CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.
Weekly client reports with photos, programme RAG, variation log, compliance status.
O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.
Lighting & Electrical in trophy hq buildings (20,000–40,000 sqft plates) is typically specified to led swap-out level — like-for-like led replacement of existing fluorescent. Programme is governed by loading access and estate working-hours framework.
Lighting & Electrical in argent-designed grade a (pancras square 2–6) is typically specified to full led scheme level — new fittings, dali control, emergency compliance. Programme is governed by loading access and estate working-hours framework.
Lighting & Electrical in converted victorian industrial (granary, stanley building, fish & coal building) is typically specified to premium / bespoke level — architectural lighting, decorative pendants, feature lighting. Programme is governed by loading access and estate working-hours framework.
Lighting & Electrical in mixed-use with ground-floor retail/f&b is typically specified to full electrical re-wire level — distribution, small power, lighting, controls. Programme is governed by loading access and estate working-hours framework.
Live-environment electrical works proceed under permit-to-work with trading-floor isolation slots booked with the occupier and managing agent. Main tests and commissioning typically require overnight isolation; final certification is issued within 24 hours.
Argent estate operates tenant-first access hours — construction traffic typically 7am–10am and 4pm–7pm, with heavy-noise works out-of-hours on occupied Pancras Square buildings. Estate service yard under Pancras Square — central booking through Argent tenant services, typical 3-day lead time. Coal Drops Yard and Granary have independent loading windows around retail trading.
All King's Cross occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in King's Cross see Office Maintenance in King's Cross or Commercial Maintenance in King's Cross.
Anonymised project outlines from our King's Cross and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.
Scope · 28,000 sqft
Budget band · £480k
Programme · 8 weeks nights
Full LED with DALI, 12-year ROI on Cat B wiring
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 9,200 sqft
Budget band · £260k
Programme · 5 weeks
Architectural lighting with Casambi wireless
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 15,000 sqft
Budget band · £85k
Programme · 3 weeks
BS 5266 upgrade across 4 floors
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Yes — LED swap-out using existing circuits is common where the existing wiring is sound (post-EICR). Typical ROI on energy savings is 2–4 years.
Yes — we install Tridonic, Lutron, Casambi and Helvar systems, with commissioning and training for the FM team.
Yes — lighting is typically the largest single electrical load in an office. An LED upgrade with controls can lift an EPC from D/E into B/C territory.
Yes — annual full-duration discharge testing and monthly flick tests are offered under a PPM contract. Certificates to BS 5266 provided.
Yes — we hold Argent-specific contractor approval with CSCS, insurance, CDM and the estate's fit-out protocol sign-off.
Yes — approved for CAT B alterations, reactive works and dilapidations across occupied tenant floors on the estate. NDA and enhanced vetting (BPSS) for team members working in these buildings.
Yes — specialist handling of exposed brick, original cast iron, timber floors, and reversible fit-out on listed Granary, Fish & Coal and Stanley Building elements.
Argent Pancras Square Grade A CAT B: £130–£200 per sqft. Trophy HQ level: £250+ per sqft. Heritage industrial: £150–£250 per sqft reflecting specialist handling.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
CAT A and CAT B fit-out for new leases, HQ relocations and floor consolidations.
Reactive and planned maintenance (PPM) for commercial offices — single trade or full FM cover.
Renovation of existing office space — modernising finishes, layout and services without full strip-out.
Suspended ceiling grids, tiles, rafts, exposed-services finishes.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.