House Renovation Specialists · London

Whole-House Renovation That Changes How You Live

Architect-led renovation of London homes — reconfiguring layouts, opening up living space, modernising services and transforming tired or compromised houses into homes that work the way you actually live. RIBA Chartered architects, RICS surveying support through our sister company, in-house structural engineers and directly-employed trades, delivered under one fixed-price design-and-build contract from first brief to handover and aftercare.

A Single Fixed-Price Contract
Designed, costed and delivered in-house
RIBA architectural designIncluded
Layout & structural worksIncluded
Full rewire & replumbIncluded
Kitchen & bathroomsIncluded
Joinery, flooring, decorationIncluded
Aftercare warranty10 years
103+
Completed Projects
RIBA
Architect Partners
Structural
Engineering Calculations
Planning
Applications & Consents
Building
Control
Compliance Support
Leasehold
Licence for Alteration
£10M
Fully Insured
RICS
Chartered Surveyors
103+
Homes Renovated
Across Prime London
£500£2,400
Cost Per sqm
Standard to Atelier
1232
Build Programme
Weeks (2–6 bed)
100%
Fixed-Price
No Hidden Cost-Plus

The London Home, Renovated Around How You Live

A whole-house renovation is the most effective way to get the home you want without leaving the address you love. Done well, it does not simply refresh finishes — it rethinks how the house works: where the light falls, how the ground floor flows, where the kitchen sits, how many bathrooms there are and how the whole building performs. Done badly, it leaves new paint over the same cramped layout, the same cold rooms and the same tired wiring — a house that looks updated and lives exactly as it did before.

House renovation, home renovation, whole-house renovation — whatever you call it, this is the page for a complete, layout-led programme in London. As an established design-and-build renovation company — architects, structural engineers, surveyors and builders under one roof — we take an existing house and reshape it around the way you actually live, under one fixed-price contract. If your priority is restoring a period property's condition and finish rather than changing how it works, our house refurbishment service is the closely related route.

We are not a builder who sub-contracts the design, nor an architectural practice that hands over a drawing pack and walks away. We are a single integrated studio: RIBA Chartered architects, RICS surveying support through our sister company, MIStructE structural engineers, MCIBSE M&E consultants, interior designers and our own directly-employed core build teams — operating under one JCT fixed-price contract with a single point of accountability. The architect who reconfigured your floor plan walks the site every week. The estimator who priced your bill of quantities is the same person you call when you want to add a Crittall screen in week eleven.

We have refined this model across 103+ residential projects in NW3, NW8, NW1, SW1, SW3, SW7, W1 and W11 — opening up Victorian terraces in Primrose Hill, reconfiguring Edwardian villas in Hampstead Garden Suburb, modernising mid-century homes in St John's Wood and transforming Georgian townhouses behind retained period frontages. Every house starts compromised in some way. Every one is held to the same standard once we are done.

Our approach inverts the industry default. We agree the price before we start. We resolve the layout, structure and services on paper before a single finish is chosen. We programme to the day, retain our trades on long-term framework agreements rather than chasing the cheapest tender, and we do not leave site until you are happy.

A Renovation Strategy Calibrated to Your House

The right renovation strategy depends on what you are starting with. A Georgian townhouse, a bay-fronted Victorian terrace and a 1960s detached house each present different opportunities to reconfigure space, improve light and modernise services. These are the six house types that account for most of our work.

1720–1830 · Often Listed

Georgian Townhouse

Tall, narrow and vertically organised across four or five floors. Renovation usually focuses on making the vertical plan work for modern life — reworking the lower-ground kitchen and garden link, improving the stair and circulation, and modernising services discreetly — while respecting the proportional discipline and (where Listed) securing consent for internal change.

Typical sqm240–420 sqm
Renovation focusCirculation, lower-ground, services
Programme28–44 weeks
1837–1901 · NW3 · NW1 · NW6

Victorian Terrace & Semi

The classic London renovation. The cellular rear almost always wants opening up — a structural opening into a side-return or rear extension to create a single kitchen-dining-living space — alongside a loft conversion for a primary suite, a full re-service and damp diagnosis. The biggest gains come from layout, not finish.

Typical sqm110–230 sqm
Renovation focusOpen-plan rear, loft, re-service
Programme14–24 weeks
1901–1914 · NW3 · NW11 · W4

Edwardian Villa

Larger and more generously planned than their Victorian predecessors, but often chopped into small rooms by post-war partitioning. Renovation typically removes those later walls to recover the original generosity, adds a full-width rear opening into the kitchen, converts the loft and brings the services and insulation up to current standards.

Typical sqm180–340 sqm
Renovation focusDe-partition, rear opening, loft
Programme20–30 weeks
1875–1925 · Conservation Area

Arts & Crafts Home

Characterful, hand-made and frequently in a Conservation Area, so external change is tightly controlled. Renovation here is internal-led: improving thermal comfort without losing breathability, reworking awkward service rooms, upgrading kitchens and bathrooms, and restoring the joinery and plasterwork that give these homes their value — all designed to satisfy conservation officers.

Typical sqm220–500 sqm
Renovation focusThermal, internal layout, restoration
Programme26–40 weeks
1925–1965 · Detached & Semi

Inter-War & Mid-Century

The most under-rated renovation opportunity in London. Solid construction but cellular, poorly insulated and often still on original wiring. The transformation is usually dramatic: knocking the small reception rooms into open social space, a thermal and services overhaul, replacing asbestos-bearing components, and frequently a loft and rear extension to add the bedrooms and family room these plots can easily take.

Typical sqm130–260 sqm
Renovation focusOpen up, thermal, extend
Programme16–24 weeks
1990–Present · Architect-Designed

Contemporary Residence

Modern homes renovate for performance and technology rather than layout. The work is usually keeping pace with the cycle — smart-home rewires, EV charging, photovoltaic and battery integration, MVHR and heat-pump upgrades — and updating the original specification to current Building Regulations Part L and F while refreshing kitchens, bathrooms and finishes.

Typical sqm200–600 sqm
Renovation focusServices, technology, performance
Programme14–22 weeks

What a Whole-House Renovation Actually Includes

Comprehensive is not a marketing word for us — it is the contractual scope. Every line item below is delivered, certified and warranted under the same fixed-price agreement, sequenced as one coordinated programme.

Layout Reconfiguration

RIBA Stage 2–4 design by chartered architects: spatial planning, structural feasibility, daylight modelling and full drawings. We resolve circulation before we touch a finish — opening up the ground floor, relocating the kitchen, adding en-suites, a boot-room and utility, and creating a properly planned primary suite. The layout is where a renovation earns its value.

Structural Works & Steel

MIStructE-led calculations and detailing for steel beams (RSJs), transfer beams, padstones, lintels, underpinning where required, floor strengthening and roof alteration. Building Control submission via your authority of choice and full Party Wall etc. Act 1996 service of notices, schedules of condition and award negotiation by RICS surveyor through our sister company.

Full Electrical Rewire

NICEIC-certified rewire to BS 7671 18th Edition — new consumer unit with RCBOs, LED architectural lighting with multi-scene dimming, ample sockets with USB, Cat6a structured cabling, Wi-Fi access points, EV charging supply, fire and CO detection to BS 5839-6, AV pre-wire and full smart-home infrastructure (Lutron, Crestron or Control4 on request).

Plumbing, Heating & Hot Water

Complete replumb removing lead, galvanised steel and ageing copper. New high-efficiency condensing boiler or air-source heat pump, unvented mains-pressure hot water cylinder, zoned heating with smart controls, underfloor heating to the ground floor, and stainless-steel pipework with brass fittings to specification. Gas Safe certified.

Insulation & Energy Performance

A fabric-first upgrade: roof and floor insulation, internal wall insulation (breathable wood-fibre systems on heritage walls), acoustic separation between floors, and draught-proofing. SAP and EPC uplift modelled at design stage — a renovation is the one chance to materially cut a period home's running costs.

Kitchen Design & Install

In-house kitchen design with bespoke cabinetry from our framework joinery partners — solid timber carcasses, hand-painted or veneered finishes, and your choice of Miele, Sub-Zero & Wolf, Gaggenau or Liebherr appliances. Stone selection from specified yards — book-matched marble, quartzite, sintered surfaces or honed limestone — coordinated with the open-plan layout.

Bathrooms & Wet Rooms

Full waterproofing tanking to all wet zones, electric or hydronic underfloor heating, wall-hung sanitaryware (Duravit, Villeroy & Boch, Catalano), brassware to specification (Vola, Dornbracht, Lefroy Brooks), bespoke vanity joinery and frameless shower enclosures. New en-suites and family bathrooms planned into the reconfigured layout.

Flooring & Stone

Engineered or solid timber boards — European oak, Douglas fir, walnut, smoked or fumed finishes, oil-sealed — run continuously through opened-up spaces. Natural stone laid on heated screed: Burlington slate, Yorkshire stone, French limestone, or large-format porcelain with rectified joints.

Bespoke Joinery & Storage

Our joinery shop produces every fitted element: floor-to-ceiling wardrobes, walk-in dressing rooms, alcove cabinetry, window seats, panelling, internal doors, and skirting and architrave profiles drawn to match your home's period — or detailed plain for contemporary work. Storage designed into the new layout, not added as an afterthought.

Period Feature Restoration

Cornicing, ceiling roses, dado rails, panelled doors, sash windows, encaustic floors, fireplaces and balustrades — repaired by traditional plasterers, joiners and conservators on our roster. Where features are missing, we draw, mould and reproduce to period accuracy, so a modernised layout keeps its character.

Decoration & Finishes

Premium specifications: Farrow & Ball, Paint & Paper Library, Edward Bulmer, Little Greene. Five-coat decoration to walls and ceilings with full sanding between, and specialist finishes — lime wash, Venetian polished plaster, veneer panelling and fabric-lined walls — on premium projects.

Snagging & Aftercare

A two-stage snagging process — an internal pre-handover walk by our project manager and quantity surveyor, then a joint walk with you. Defects rectified before completion, not after. A 12-month defects period, a 10-year workmanship warranty, and one free post-handover service visit at six months.

Reconfiguring How the House Works

The single biggest return on a renovation is rarely the kitchen you can see — it is the layout you can feel. Most of our renovations are won or lost on these five moves, all resolved on paper before site starts.

i.

Opening Up the Ground Floor

Removing internal and load-bearing walls to create open-plan or broken-plan kitchen-dining-living space. Supported on calculated steel beams with padstones, engineered and signed off, with the structure resolved before the kitchen is even specified.

ii.

Bringing in Light

Roof lights, larger rear glazing, internal glazing and re-planned circulation to pull daylight deep into the plan. We model daylight at design stage so the open space is bright at 4pm in January, not just in the CGI.

iii.

Adding Bathrooms & Suites

Renovations almost always add an en-suite or two and a proper primary suite. We plan the soil and water runs into the structural design so new bathrooms land where you want them, not where the existing pipework happens to be.

iv.

Recovering Wasted Space

Lofts, cellars, side-returns, under-stair voids and oversized landings — the square metres you already own but cannot use. Folding these into the renovation is far cheaper per sqm than moving to a larger house.

v.

Modernising the Services

A renovation is the one moment a whole home's wiring, plumbing, heating and insulation are exposed at once. Renewing them together — rather than room by room over a decade — is cheaper, cleaner and the only way to genuinely improve comfort and running costs.

vi.

Designing for the Long Term

Renovating for how you will live in ten years, not just today — adaptable rooms, future home-working space, and an envelope ready for a heat pump and solar. The structural and service decisions made now define what is easy to change later.

Eight Stages, From Brief to Handover

We work to the RIBA Plan of Work 2020. Below is what each stage means for your renovation, and exactly what you receive at the end of it.

0
Stage 0 · Strategic Definition

Brief & Free Consultation

An initial consultation at our Finchley Road studio or your home. We discuss how you live, the rooms that do not work, and what you want the renovated house to do for you. We talk realistic budgets — not inflated trade-press guides — and agree the broad shape of the brief. No charge, no obligation.

Week 0 · Free consultation
1
Stage 1 · Preparation & Briefing

Survey, Feasibility & Constraints

Measured survey of the existing house (laser-scanned to 3mm), a planning and conservation review, an asbestos screen if pre-2000, drainage CCTV, and a written feasibility report covering structural opportunity, layout options, planning risk and an outline cost band — a 30–50 page document.

1–2 weeks · Fee credited if you proceed
2
Stage 2 · Concept Design

Layout Options & 3D Visualisation

Two distinct layout directions developed and presented at design review — plans, sections, materiality and a 3D walk-through — before we converge on a single preferred direction and refine it. Photoreal CGIs of two key spaces are produced at the end of this stage.

3–4 weeks · Drawings + CGIs
3
Stage 3 · Spatial Coordination

Planning, Building Regs & Heritage

If your renovation requires Planning Permission, Listed Building Consent or a Lawful Development Certificate, we prepare and submit the application, manage statutory consultees and respond to conditions. The Building Regulations Full Plans submission runs in parallel.

8–13 weeks (varies by borough)
4
Stage 4 · Technical Design

Technical Drawings & Specification

The pack the trades build from: 1:50 plans, 1:20 sections, 1:5 details, full structural calculations, M&E schematics, a schedule of finishes, joinery elevations, kitchen and bathroom layouts and a written specification of typically 80–140 pages.

4–6 weeks · Tender-ready package
5
Stage 5 · Construction

Build Phase · Site Operations

JCT contract signed. Site set-up, strip-out, structural openings and steel, first-fix, second-fix, decoration and installation. Weekly written progress report with photography, weekly architect site visit, monthly QS cost report. You retain full visibility throughout.

12–32 weeks depending on scale
6
Stage 6 · Handover

Snagging, Commissioning & Handover

Pre-handover deep clean, full M&E commissioning, a joint snagging walk with you, the certification pack (electrical, gas, structural, building control completion), the O&M manual and key handover.

1–2 weeks · Practical Completion
7
Stage 7 · Use & Aftercare

Defects Period & Long-Term Warranty

A 12-month defects rectification period — anything that emerges as the building settles is corrected free of charge — a six-month complimentary service visit, and a 10-year workmanship warranty. Most clients return to us for a second project within five years.

12 months defects + 10-year workmanship

Four Tiers, Honestly Drawn

Most renovation websites quote a single “from” price. We don't, because the cost of renovating a London house depends entirely on the specification you choose. Here is exactly how our four tiers differ — line by line.

Element
HeritageStandard Spec
ConsideredHigh-End
ConnoisseurPremium
AtelierSuper-Prime
Kitchen cabinetry
Quality painted MDF, soft-close, factory-finished
Bespoke painted timber, dovetail drawers, Blum hardware
Hand-painted solid hardwood, hand-fitted, Blum Legrabox
Hand-built oak/walnut, brass fittings, fully bespoke
Worktops
Quartz composite, 20mm
Honed marble or dolomite, 30mm mitred
Book-matched marble or quartzite, waterfall
Slab-thick natural stone, 60mm, premium veining
Appliances
Bosch Series 6 / Siemens iQ500
Miele G7000 / Neff N90
Sub-Zero, Wolf, Miele Generation 7000
Gaggenau 400-Series, La Cornue, full integration
Sanitaryware
Duravit Starck, Hansgrohe
Duravit Vero, V&B Subway, Axor
Catalano, Lefroy Brooks, Vola HV1
Drummonds, Dornbracht Vaia, custom brass
Flooring (timber)
Engineered oak, 14mm/3mm, 180mm wide
Engineered oak, 20mm/6mm, 220mm wide
Solid French oak, 240mm, hand-distressed
Reclaimed antique or wide-board oak, 280–320mm
Stone & tile
Porcelain large-format (600×600)
Honed limestone or porcelain (800×1600)
Burlington slate, Carrara, Yorkshire stone
Hand-cut Dordogne limestone, book-matched slab
Lighting control
Standard switching, dimmable LED
Lutron Caseta wireless, scene control
Lutron RA2 Select, 8+ scenes per room
Lutron HomeWorks QSX, motorised blinds
Smart home / AV
Cat6 cabling, Wi-Fi mesh
Cat6a, multi-room audio, smart heating
Crestron or Control4, distributed AV, cameras
Crestron CP4, Atmos cinema, biometric access
Joinery profiles
Standard skirting/architrave, machine-finished
Period profiles, hand-mitred, factory-painted
Hand-drawn profiles, paint-grade hardwood
Hand-modelled bespoke profiles, panelled walls
Decoration
Dulux Trade, three-coat
Farrow & Ball Estate Eggshell, four coats
F&B Modern, Edward Bulmer, five-coat sanded
Venetian polished plaster, lime wash, fabric walls
Indicative cost
£500–£700 /sqm
£800–£1,200 /sqm
£1,300–£1,800 /sqm
£1,900–£2,400+ /sqm

Where Your Renovation Budget Actually Goes

For a representative high-end (Considered tier) renovation of a 200 sqm Victorian terrace at £1,000/sqm — total contract £200,000 — here is the honest breakdown of where every pound is spent.

Structural & shell
14%
Services (electrical, plumbing, heating)
18%
Kitchen (cabinetry, stone, appliances)
13%
Bathrooms (sanitary, brassware, tile)
10%
Joinery & built-ins
11%
Flooring & stone
8%
Decoration & finishes
6%
Design fees (RIBA, structural, MEP)
8%
Project management & QS
6%
Preliminaries (scaffold, skips, welfare)
4%
Contingency (held by client)
2%

The Engineering Behind the Transformation

A renovation is, before anything else, a technical exercise. Here is what is actually being designed, calculated and installed behind the walls once the layout is fixed.

Structure & Layout

  • Steel beams: Universal beams and columns sized to BS EN 1993-1-1, fabricated by audited UK steelyards, intumescent fire-protected where required — the backbone of every open-plan reconfiguration
  • Padstones: Pre-cast concrete padstones to MIStructE calculation for beam bearings
  • Underpinning: Mass-concrete or beam-and-base to BS EN 1997 (Eurocode 7) where surveys warrant
  • Floor strengthening: Sister joists, steel flitch plates or new C24 joists for kitchen islands and new bathrooms
  • Damp diagnosis: Calcium-carbide readings, salt analysis and thermal imaging by a PCA-certified surveyor before any treatment

Electrical & Smart Home

  • Standard: BS 7671:2018+A2:2022 (18th Edition) — full RCBO board, AFDDs on key circuits, Type 2 surge protection
  • Lighting: Architectural LED — 2700K, CRI ≥ 95 standard, DALI or 0–10V dimming on premium projects
  • Sockets: Generous 13A doubles with USB-C/USB-A, finishes in brushed brass, matt black, nickel or bronze
  • Data: Cat6a structured cabling to every room with enterprise switching and managed access points
  • EV charging: 7kW (32A) chargepoint, OZEV-compliant where a grant applies

Heating, Ventilation & Hot Water

  • Heat source: Worcester/Vaillant condensing boiler, or Mitsubishi Ecodan / Daikin Altherma air-source heat pump (8–14kW typical)
  • Hot water: Megaflo Eco unvented cylinder 200–300L, mains-pressure delivery, secondary return on larger cylinders
  • Underfloor heating: PE-RT pipe at 150mm centres in screed, manifold per zone, weather compensation
  • Ventilation: dMVHR to bathrooms minimum; whole-house MVHR on near-Passivhaus renovations
  • Water: Whole-house filtration, optional softener, dedicated filtered tap to the kitchen

Fabric & Performance

  • Roof insulation: 270mm mineral wool at ceiling level, or 150mm PIR + 50mm internal for a warm loft
  • Wall insulation: Internal wall insulation on solid walls — breathable wood-fibre or Pavadry systems on heritage to avoid interstitial condensation
  • Floor insulation: 150mm PIR between joists, continuous layer below where room height allows
  • Glazing: Slimline double-glazed sashes for conservation areas (1.1 W/m²K); argon triple glazing on contemporary work
  • Airtightness: Pre-completion air permeability test, target ≤ 5 m³/(h·m²) on full renovations
A renovation is the difference between a house that contains you and a home that fits how you live. Get the layout, structure and services right, and the finishes will look right for thirty years. Get them wrong, and no amount of marble will fix the way the house feels.
— Hampstead Renovations · Studio Statement

Renovate or Move?

Most clients arrive weighing a renovation against simply buying a bigger house. It is worth doing the maths honestly — we help you model it at feasibility before you commit either way.

Moving in prime London is expensive in ways that are easy to underestimate. Stamp duty alone runs to roughly 5–15% of the purchase price on a substantial home, and once agent fees, legal costs, removals and the inevitable works on the new house are added, the true cost of trading up is frequently £150,000–£400,000 or more — spent before you have changed a single thing about how you live. And the next house rarely fits perfectly either.

A renovation puts that same money into the home you already own. You keep the address, the garden, the street and the school catchment, and you reshape the house around exactly how your family lives now — opening up the ground floor, adding the bedrooms and bathrooms you need, and modernising the services so the house is warm, quiet and cheap to run. A well-executed whole-house renovation also typically returns much of its cost in resale value, particularly when it adds usable floor area through a loft conversion or extension.

Renovation is not always the right answer — if the plot simply cannot deliver the space you need, moving may win. That is exactly why we model both honestly at feasibility, including realistic build cost, the resale uplift and the disruption involved, so the decision is made on numbers rather than estate-agent optimism. Start with the renovation cost calculator for an early read.

A Renovation Programme, Week by Week

A representative programme for a 180 sqm three-bedroom Victorian terrace renovation at Considered specification, including opening up the rear ground floor. Yours will differ — but this is what a properly run renovation looks like in real time.

Week
Phase
Activity on Site
01
Mobilisation
Site set-up, scaffold, welfare unit, dust protection, asbestos clearance, soft strip-out begins.
02
Strip Out
Full strip of finishes, pipework and old wiring. Floors lifted to expose joists. Skips daily.
03–04
Structural
Steel installed for the rear ground-floor opening and any loft works, padstones cured, walls removed, temporary works struck.
05
Carcassing
New stud walls to the reconfigured layout, ceiling battens, floor levelling, new joists where required. Building Control inspection 1.
06–07
First Fix Services
Electrical first-fix, plumbing first-fix (hot/cold/waste to the new bathroom positions), heating manifolds installed.
08
Insulation & Boarding
Acoustic and thermal insulation, plasterboarding, taping. Building Control inspection 2.
09
Plaster Skim
Skim coat to all walls and ceilings, then a 7-day drying cure (longer in winter).
10–11
Second Fix Services
Electrical second-fix, plumbing second-fix, radiators, heating commissioning begins.
11–12
Joinery Install
Skirting, architrave, internal doors, fitted wardrobes and storage installed by the joinery team.
12–13
Kitchen & Bathrooms
Kitchen install into the open-plan space, stone template and fit, sanitaryware, brassware, tiling, shower screens.
14
Decoration
Mist-coat, primer, two undercoats, two finish coats, plus any specialist finishes.
15
Flooring
Engineered oak run through the opened-up space, stone on heated screed where applicable, finishing oils applied.
16
Snagging & Handover
Snag list resolved, deep clean, commissioning sign-off, certification pack issued, handover walk and key release.

What Sets Our Renovations Apart

There are perhaps fifteen design-and-build practices in London capable of delivering whole-house renovation at this standard. Here is what makes us one of them.

i

Single Fixed-Price Contract

One JCT agreement covering design, statutory approval, structure, services and finishes. No cost-plus surprises, no inflated provisional sums.

ii

Architect on Site Weekly

The RIBA Chartered architect who reconfigured your layout walks the site every week for the entire build. Decisions made in person, not by email tag.

iii

Layout Resolved First

We fix the structure, services and floor plan on paper before a finish is chosen — the discipline that keeps a renovation on budget and on time.

iv

Directly-Employed Trades

Our core carpenters, plumbers, electricians and decorators are PAYE staff, not gig labour — continuity of standard from project to project.

v

Heritage & Listed Expertise

Successful applications across Camden, Westminster, RBKC, Kensington and the City. Conservation officers know our practice by name.

vi

£10M Insurance

Professional indemnity and public liability cover at £10M, well above industry standard — the level prime-London freeholders require.

vii

10-Year Warranty

An insurance-backed workmanship warranty (LABC, Premier or Build-Zone) protecting your investment long after the defects period closes.

viii

Concierge Aftercare

One free service visit at six months and a 24-hour emergency line for live defects. Most clients return for a second project within five years.

Explore the Services Within a Renovation

A whole-house renovation usually combines several of the services below. Start here to understand each element, or speak to us about packaging them under one fixed-price contract.

Whole-House Renovation Proof

Premium-postcode projects with comparable scope, planning context and finishing standards. A renovation succeeds when structure, services, layout, joinery and finishes are planned as one coordinated sequence — start with the whole-house case study, then browse the wider case-study hub. For survey-led due diligence before you commit, see surveying support before renovation.

Detailed Answers to the Questions That Matter

What does a full house renovation include?

A whole-house renovation goes beyond redecorating: it changes how the house works as well as how it looks. A typical scope covers strip-out, structural openings and steelwork, a full rewire and replumb, new heating and insulation, reconfigured layouts, a new kitchen and bathrooms, bespoke joinery, flooring, decoration and final snagging — sequenced as one programme. We agree exactly what is reconfigured, renewed, upgraded or retained before pricing, so the brief, specification and build order are settled up front.

What is the difference between a house renovation and a refurbishment?

In practice we deliver both as one integrated service, but the emphasis differs. A renovation usually means changing how the home functions — opening up the ground floor, moving or adding bathrooms, relocating the kitchen, modernising the services and improving energy performance. A refurbishment leans towards bringing finishes and condition back up to standard. If your priority is restoring a period property to a coherent finish, see our house refurbishment page; if it is transforming layout, light and how the house lives, this renovation page is the right home.

Can we live in the house during the renovation?

For a whole-house renovation we usually recommend decanting, because strip-out, structural work, rewiring and replumbing make the property unsafe and unhealthy to occupy and slow the programme considerably. Where you must remain, we can phase the work floor-by-floor or zone-by-zone with temporary kitchens, dust screening and sequenced services — this is slower and typically 10-20% more expensive, but workable. We agree the live-in or decant strategy at feasibility stage so it is priced honestly, not assumed.

How much does it cost to renovate a house in London in 2026?

Realistic prime-London ranges in 2026: standard specification £500-£700/sqm, high-end £800-£1,200/sqm, premium £1,300-£1,800/sqm, super-prime £1,900-£2,400+/sqm. A 200 sqm Victorian house renovated to a high-end standard is therefore £160,000-£240,000 contract value. Structural reconfiguration (steel openings, layout changes) and full re-servicing sit at the higher end of scope; furniture, art and soft furnishings (FF&E) are typically a further 15-25% on top. Use the renovation cost calculator for an early band before a detailed survey.

How long does a full house renovation take?

From signed feasibility to keys: a typical 3-bed terrace renovation runs 32-40 weeks total (6-8 weeks design, 8-13 weeks planning if required, 14-18 weeks on site). A 5-6 bed Edwardian or Georgian house runs 44-60 weeks total. Layout reconfiguration and structural openings add to the build phase but are planned into the programme up front. Late delivery beyond 5% of programme triggers liquidated damages of £500/week to the client under our standard JCT contract.

Do we need planning permission to renovate a house?

Internal renovation of an unlisted house in a non-conservation area — reconfiguring rooms, opening up walls, new kitchen and bathrooms, rewiring — generally does not require Planning Permission, though it does need Building Regulations approval. Permission is usually required for rear or side extensions, loft dormers, basement excavation, changes to windows or external materials, and almost any external alteration to a listed building or Conservation Area property. We assess this at survey stage and manage any application required.

Can you reconfigure the layout and open up the ground floor?

Yes — layout reconfiguration is at the heart of most renovations we deliver. Removing internal and load-bearing walls to create open-plan or broken-plan living, relocating the kitchen, adding en-suites and a proper utility, and improving circulation and natural light are designed by our architects and engineered by our in-house structural team. Load-bearing removals are supported on calculated steel beams (RSJs) with padstones, signed off by a structural engineer and inspected by Building Control. We resolve the structure before any finish is chosen.

Should we renovate or move?

It depends on the cost of getting what you want where you are versus elsewhere. Moving in prime London carries roughly 5-15% in stamp duty plus agent, legal and moving costs — frequently £150,000-£400,000+ on a substantial home — with no guarantee the next house suits you any better. A renovation lets you keep the address, garden and school catchment while reshaping the house around how you actually live. We help clients model this honestly at feasibility, including the resale uplift a well-executed renovation typically returns.

What insurance and warranty do you provide?

Professional Indemnity £10M, Public Liability £10M, Employers' Liability £10M, Contract Works (CAR) at full reinstatement value. A 12-month JCT defects period plus a 10-year insurance-backed workmanship warranty (LABC, Premier or Build-Zone, client choice). All policies are confirmed in writing before contract.

Do you renovate houses across London or only in Hampstead?

Across all prime London. Our studio is at 250 Finchley Road NW3, with projects across NW3, NW8, NW1, NW11, W1, W8, W11, SW1, SW3, SW7, N1, N6 and the City. For homes further afield (Surrey, Buckinghamshire, Cotswolds country houses) we run a separate framework on request.
Client References

What Our Clients Say

★★★★★

“I would like to thank Ross and his team for their consistent commitment to quality and their unerring reliability. They delivered our property to specification and on time, proving to be an extremely effective, experienced, and proactive contractor.”

James Ward — Investment Director, Belgravia
★★★★★

“We have worked with Ross and his company many times. They are extremely professional and hardworking individuals who can work under any circumstances. There was no variation to the works.”

Cirus Rehman — Finance Director, Grosvenor Street, Mayfair

Read our reviews on Google ↗

Begin Your House Renovation

Book a no-obligation consultation at our Finchley Road design studio or in your home. The first meeting is free, lasts 60–90 minutes, and concludes with an honest indication of feasibility, programme and budget band. No salespeople. No pressure.

Call us020 8054 8756
Email uscontact@hampsteadrenovations.co.uk
Visit our studio250 Finchley Road, London NW3

Free House Renovation Consultation

Site visit · feasibility assessment · outline cost estimate · programme indication. No obligation. Saturday appointments available.

Enquire before 2pm — same-day call-back (Mon–Fri).

Sister CompanyHampstead Chartered Surveyors & Building Consultancy RICS-regulated surveying — independent advice250 Finchley Road, NW3