Lighting & Electrical across Paddington (W2). Commercial lighting and electrical services — LED upgrades, emergency lighting, small power distribution, data containment and BMS interface. NICEIC-certified installation with full EICR reporting.
Lighting & Electrical across Paddington (W2) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to Merchant Square 1–5, The Point (Paddington Basin), The Colonnades, Sheldon Square 1–5, 1 Kingdom Street among others. Teams mobilise from our London operations base, with direct transport links via Paddington (Elizabeth line, Bakerloo, Circle, District, Hammersmith & City + National Rail + Heathrow Express), Edgware Road (Bakerloo, Circle, District, Hammersmith & City), Lancaster Gate (Central). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.
The Paddington market is dominated by tech (microsoft, vodafone, nissan hq), pharmaceutical / life sciences (astrazeneca), media (wpp units, itv studios nearby), each with distinct lighting & electrical requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered lighting & electrical in trophy buildings including Merchant Square 1–5, The Point (Paddington Basin), The Colonnades, Sheldon Square 1–5.
Paddington combines the Basin's modern Grade A (Merchant Square, The Point, The Colonnades) with the Sheldon Square commercial core (British Land) and the Marble Arch Place cluster. Occupiers include tech, media, pharmaceutical/life sciences and professional services.
WCC standard: 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Paddington Basin estate operates additional managed-access hours for loading to preserve tenant amenity during trading. Sheldon Square service yard and Merchant Square service road both require pre-booking (typical 48-hour lead). Surrounding streets are red routes with parking suspensions needed through TfL.
Existing system survey and EICR
Lighting calculation (Relux / Dialux) to BCO/CIBSE standards
Design package — fittings schedule, small power layout, control strategy
Installation with NICEIC certification
Commissioning and EICR sign-off
| Tier | Range | What's covered |
|---|---|---|
| LED swap-out | £12–£22 per sqft | Like-for-like LED replacement of existing fluorescent |
| Full LED scheme | £24–£42 per sqft | New fittings, DALI control, emergency compliance |
| Premium / bespoke | £45–£95 per sqft | Architectural lighting, decorative pendants, feature lighting |
| Full electrical re-wire | £45–£85 per sqft | Distribution, small power, lighting, controls |
This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.
LED upgrade — delivered in Paddington under estate-approved loading and out-of-hours protocols.
Full re-wire — delivered in Paddington under estate-approved loading and out-of-hours protocols.
Emergency lighting — delivered in Paddington under estate-approved loading and out-of-hours protocols.
DALI controls — delivered in Paddington under estate-approved loading and out-of-hours protocols.
Wireless lighting — delivered in Paddington under estate-approved loading and out-of-hours protocols.
Containment — delivered in Paddington under estate-approved loading and out-of-hours protocols.
Small power — delivered in Paddington under estate-approved loading and out-of-hours protocols.
Data cabling — delivered in Paddington under estate-approved loading and out-of-hours protocols.
Westminster City Council holds planning authority. Paddington Basin Character Area and Paddington Conservation Area cover much of the area. Listed buildings at Paddington Station (Grade I) and Paddington Green restrict external works.
Reference list available on request under NDA.
Measured condition survey within 5 working days, including M&E, fabric and compliance review.
Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.
Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.
Lump-sum price against the design package. All prelims transparent.
CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.
Weekly client reports with photos, programme RAG, variation log, compliance status.
O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.
Lighting & Electrical in modern grade a (merchant square / sheldon square — 18,000–28,000 sqft plates) is typically specified to led swap-out level — like-for-like led replacement of existing fluorescent. Programme is governed by loading access and estate working-hours framework.
Lighting & Electrical in trophy hq buildings (microsoft uk hq, vodafone uk hq) is typically specified to full led scheme level — new fittings, dali control, emergency compliance. Programme is governed by loading access and estate working-hours framework.
Lighting & Electrical in converted period stock (marylebone edge) is typically specified to premium / bespoke level — architectural lighting, decorative pendants, feature lighting. Programme is governed by loading access and estate working-hours framework.
Lighting & Electrical in regeneration stock (paddington square) is typically specified to full electrical re-wire level — distribution, small power, lighting, controls. Programme is governed by loading access and estate working-hours framework.
Live-environment electrical works proceed under permit-to-work with trading-floor isolation slots booked with the occupier and managing agent. Main tests and commissioning typically require overnight isolation; final certification is issued within 24 hours.
WCC standard: 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Paddington Basin estate operates additional managed-access hours for loading to preserve tenant amenity during trading. Sheldon Square service yard and Merchant Square service road both require pre-booking (typical 48-hour lead). Surrounding streets are red routes with parking suspensions needed through TfL.
All Paddington occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in Paddington see Office Maintenance in Paddington or Commercial Maintenance in Paddington.
Anonymised project outlines from our Paddington and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.
Scope · 28,000 sqft
Budget band · £480k
Programme · 8 weeks nights
Full LED with DALI, 12-year ROI on Cat B wiring
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 9,200 sqft
Budget band · £260k
Programme · 5 weeks
Architectural lighting with Casambi wireless
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 15,000 sqft
Budget band · £85k
Programme · 3 weeks
BS 5266 upgrade across 4 floors
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Yes — LED swap-out using existing circuits is common where the existing wiring is sound (post-EICR). Typical ROI on energy savings is 2–4 years.
Yes — we install Tridonic, Lutron, Casambi and Helvar systems, with commissioning and training for the FM team.
Yes — lighting is typically the largest single electrical load in an office. An LED upgrade with controls can lift an EPC from D/E into B/C territory.
Yes — annual full-duration discharge testing and monthly flick tests are offered under a PPM contract. Certificates to BS 5266 provided.
Yes — we hold British Land approved contractor status with compliance pack on file for Sheldon Square and associated Paddington holdings.
Significant rental uplift since 2022, with sharpened demand for floor plates 15,000 sqft+. Tech and life-sciences occupiers now compete for space historically dominated by professional services.
Yes — including containment laboratories, dry labs, write-up space, and BSL-1/BSL-2 support. F-Gas, COSHH and specialist ventilation covered.
Sheldon Square / Merchant Square: £130–£200 per sqft. Trophy HQ level: £220–£350 per sqft. Life-sciences labs: £350–£650 per sqft depending on containment level.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
CAT A and CAT B fit-out for new leases, HQ relocations and floor consolidations.
Reactive and planned maintenance (PPM) for commercial offices — single trade or full FM cover.
Renovation of existing office space — modernising finishes, layout and services without full strip-out.
Suspended ceiling grids, tiles, rafts, exposed-services finishes.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.