Ground, groundwater and the neighbours’ foundations come first here, the floor plan second.

Discuss your project

Is there a cellar already, or does the ground have to be dug?

Plenty of decisions follow from one fact: whether the house already has a usable space below the ground floor. Redbridge’s Local Plan 2015–2030 records that permitted development rights let some basement work proceed without planning permission, and it aims its basement policy, LP31, at enlarging an existing basement or at other underground development requiring further excavation of land. Refitting a cellar that is already there, without digging, is normally a matter of Building Regulations, waterproofing and structure rather than planning; lowering its floor, pushing out under the garden or forming a new storey is further excavation, and LP31 governs it wherever permission is needed.

Our in-house architects, designers and structural engineers start by measuring what is there: the existing structure, where the drains run and the ground levels at front and back. Ground investigation is commissioned before any design is relied on. Some Woodford Green addresses are in Waltham Forest, whose own policies then apply, so the planning authority for the exact address is the first thing we confirm.

Redbridge’s LP31 tests, applied to a Woodford garden

Picture a detached Woodford Wells house in its own garden to see how LP31 works. Whatever is dug must stay wholly within the property’s curtilage and be designed so that the house and its neighbours remain structurally stable. Only one storey is supported, and not beneath an existing basement, subject to what the Basement Impact Assessment finds. Measured from the principal rear wall, the dig may take in at most 50% of the back garden’s depth, and at most 30% of the depth on the street side.

Where the basement sits under garden, LP31 wants a sustainable drainage scheme including a metre of permeable soil over it. Light wells, roof lights and fire escapes that show above ground have to be designed and placed so that neighbours and the look of the street are not harmed. A Basement Impact Assessment, scaled to the proposal, must cover geotechnical, structural engineering and hydrological impacts. Redbridge adds that it will engage applicants through its pre-application service and encourages neighbour engagement before an application goes in.

High ground, London clay and the water question

Woodford Green sits high. The 2007 Redbridge appraisal puts its conservation areas at 60 metres above sea level on a ridge, on soil that is mostly London clay, with patches of gravel on the higher parts. Elevation is no guarantee of a dry basement, though, and Redbridge’s Local Plan is direct about the risk: replacing soil with an impervious structure can cut the ground’s capacity to absorb rain, basements can be particularly susceptible to flooding, and in such cases the council may limit them to non-habitable use.

LP31 rules out a basement with an adverse impact on drainage, on flooding from any source, on groundwater conditions or on the stability of the house or its neighbours, and the plan expects every Basement Impact Assessment to address groundwater and surface water flooding alike. Our response is investigative: boreholes or trial pits, water-level readings where the ground calls for them, and a waterproofing, drainage and pumping design produced as a single system by one team.

Roots, canopies and the edge of the dig

LP31 does not support excavation that causes loss of, damage to, or a long-term threat to trees of townscape or amenity value, nor one that threatens mature trees by altering hydrology or severing roots. Separately, Redbridge’s tree guidance protects trees in its conservation areas once the trunk passes 75mm in diameter; work to one needs six weeks’ notice to the council, and doing it without consent is treated as a criminal offence.

We plot every tree near the dig, neighbours’ trees included, on the survey, bring in arboricultural advice on root protection where excavation comes close, and route spoil, plant and stored materials clear of root areas.

Digging near next door: notices, surveyors and propping

Excavation close to a neighbour’s foundations is squarely within the Party Wall Act. Redbridge’s explanation of the Act says it reaches excavation within 3 metres, or in some cases 6 metres, of neighbouring buildings or structures, the distance turning on how deep the excavation or foundations will go, and that notice of excavation must be served at least a month before it begins. If agreement is not reached, the owners either share one agreed surveyor or appoint one each, and the resulting award records the work, when and how it will be done, and the state of the neighbouring property beforehand. The council itself keeps out, describing the process as a civil matter between property owners.

The structural side follows. Under Redbridge’s building control guidance, no load-bearing wall may be altered or removed without Building Regulations consent, and a basement often relies on underpinning or new retaining walls beneath the existing ones. Our structural engineers design the temporary propping and the sequence in which each section is dug, and we arrange monitoring of the adjoining walls where the design calls for it.

Taking clay away along Woodford’s narrow roads

Excavated clay generally leaves by road, and the narrow, hedged roads that the 2007 appraisal counts among the area’s qualities make that a planning task in itself. On the Redbridge side, a skip on the public road needs a council licence unless it stands on the owner’s land, materials stored on the road need a licence of their own, and scaffolding or hoarding on the highway needs another; Redbridge charges for these by the complete month, and a skip taking up parking spaces also needs a bay suspension.

Redbridge’s permitted building hours, set out on the council’s noise nuisance page, begin at 8am on weekdays and Saturdays alike, ending at 6pm on weekdays and at 2pm on Saturdays; Sundays and bank holidays allow no noisy work. Muck-away lorries, conveyor and skip positions and deliveries are planned inside those hours and around neighbours’ driveways; on the Waltham Forest side we confirm that council’s licences and hours before starting.

Continue planning

The Woodford Green area guide · Basement conversion across London · Hampstead Architecture & Planning · Hampstead Chartered Surveyors & Building Consultancy

Discuss your project

Tell us what you are planning in Woodford Green

Share the property location, the work you have in mind and any drawings or permissions you already have.

£5M public liability, £10M employers' liability and contractors' all risks cover.

Design support: Hampstead Architecture & Planning. Surveying support: Hampstead Chartered Surveyors & Building Consultancy.

Your details will be used to respond to your enquiry. Read our privacy policy.