Redbridge measures a rear or side extension against the house it joins, the garden it uses up and the windows next door; in Wanstead’s conservation areas the character of the street is weighed too.
Discuss your projectThe depths Redbridge works to at ground level
The council’s Housing Design guide, a supplementary planning document adopted in September 2019, gives rules of thumb for a single-storey rear extension, measured from the original back wall: 3.5m for a terraced or end-of-terrace house, 3.5m for a semi-detached house and 4.5m for a detached one. A greater depth is accepted only where it would be consistent with the adjoining houses, and the guide says that creeping past the neighbours would generally not be supported. Where a garden is small, as on the close-set plots of Spratt Hall Road, the council also weighs how much outdoor space would remain and what the rear rooms would look out onto.
Height and position are just as defined. A flat-roofed extension should generally be about 3m high, with any parapet kept to 150mm; a pitched roof should hold its eaves to 3m and its overall height to 4m without encroaching on the first floor. No part of the structure, gutters and foundations included, should cross the boundary shared with next door, and its width should generally follow the original width of the house. A flat roof used as a terrace or balcony will normally be refused, and a conservatory is judged as an extension. Where an older house has a rear projection, the council prefers an infill that stops at the back wall of that projection; a wrap-around design needs especially careful handling, with eaves kept to 2.4m and a shallow pitch.
First floors, side additions and corner plots
A two-storey rear extension follows the ground-floor depths above, but its upper part is generally held to 3m deep and to no more than half the width of the original back elevation, with eaves no higher than the house’s own and a roof matching the existing one. The council checks it with the 45-degree rule: lines drawn at 45 degrees from the centre of the nearest habitable-room window next door, first on plan and then in elevation, should contain the new first floor.
A side extension should be no wider than half the house and no deeper than the house’s flank, with a roof that matches the original in style and angle and is never used as a balcony; where the boundary runs at an angle, the side wall should step rather than follow it. A two-storey side addition should set its first floor back at least 0.5m behind the front wall and drop its ridge by at least 0.5m, and if the main roof has already been turned from hip to gable, a hipped roof over the side extension is likely to be required. On a corner plot of open character the council looks for a 1m gap to the side boundary and may refuse a bulky flank wall facing the side road. Policy LP30 also asks for adequate spacing between buildings, which puts these side rules at the centre of any design for the detached houses of The Drive. Converting a garage needs permission if a planning condition ties it to parking, or if the work extends beyond the existing elevation; the council’s planning register shows whether such a condition exists.
Policy LP30 and Wanstead’s conservation areas
Behind the guide sits Policy LP30 of the Redbridge Local Plan, adopted in 2018. It supports householder extensions that complement the building’s scale, style, form and materials and stay subordinate to it, with a roof profile in keeping, enough space around them, a satisfactory garden left behind, and no harm to the sunlight and daylight of neighbouring homes. Privacy is judged by where windows sit, how rooms are used, changes in ground and floor levels and the treatment of boundaries, and the policy also looks for better energy efficiency.
Inside Wanstead’s five conservation areas the design also answers to local guidance. In Aldersbrook and the Lake House Estate, applications must follow the 2020 design guide, which expects a new rear structure to answer the house in scale, massing and materials, and which resists losing front walls, tiled paths and front gardens to hard standing, a point to settle early if a side extension comes with a new drive. The estate’s Article 4 direction reaches the side and rear elevations as well as the front. In Wanstead Grove the 2025 management plan warns that more building in the large gardens of The Avenue and Grove Park would harm the conservation area, so a deep extension or garden building there begins from a harder position. Where heritage assets are affected, policy LP33 asks for a Conservation Statement to accompany the application.
What permitted development allows, and where it stops
Outside the conservation areas some extensions need no application at all. GOV.UK’s householder guidance describes single-storey rear additions reaching up to 3m beyond the original back wall, or 4m on a detached house, at no more than 4m high, and a larger allowance of 6m or 8m through a prior approval process in which the neighbours are consulted. An extension of more than one storey may reach 3m but must stay 7m from the boundary opposite the rear wall; eaves within 2m of a boundary are capped at 3m; a side extension must be single-storey, at most 4m high and no wider than half the original house; and buildings added around the house may not cover more than half of its grounds.
On article 2(3) land, conservation areas among it, the same guidance withdraws side extensions, rear extensions of more than one storey, and cladding in stone, render, timber, plastic or tiles, and the larger rear allowance does not apply. The Redbridge design guide confirms that the prior approval route is closed to houses in a conservation area, warns that a planning condition may already have taken these rights away, and points owners to a Certificate of Lawfulness for written confirmation. The Local Plan adds that the council will consider further Article 4 directions where a proposed extension threatens an exceptionally adverse effect on neighbours or on the character of a neighbourhood.
Drains, neighbours and opening up the back wall
A rear extension often meets the drains before anything else. The council’s design guide notes that Thames Water must approve any building within 3m of a public sewer or within 1m of a public lateral drain, so we trace the runs and inspection chambers at survey stage. On land in flood zone 2 or 3 it points to the Environment Agency’s standing advice for extensions, and it asks for permeable materials wherever hard surfaces are laid.
Building on or at the boundary, putting up a new wall there, or digging below and near the level of a neighbour’s foundations all call for notice under the Party Wall Act, as GOV.UK’s party wall guidance sets out. Joining the new room to the house usually means taking out part of the back wall, and Redbridge building control requires Building Regulations consent before a load-bearing wall is altered or removed. Our in-house architects, designers and structural engineers design the beam and temporary supports for that opening, and we plan how the lived-in rooms will be screened from dust and weather while the back of the house is open.
Continue planning
The Wanstead area guide · House extension across London · Hampstead Architecture & Planning · Hampstead Chartered Surveyors & Building Consultancy
Discuss your project
Tell us what you are planning in Wanstead
Share the property location, the work you have in mind and any drawings or permissions you already have.
£5M public liability, £10M employers' liability and contractors' all risks cover.
Design support: Hampstead Architecture & Planning. Surveying support: Hampstead Chartered Surveyors & Building Consultancy.