Flat refurbishment in Wanstead

Updated 11 November 2026

Flats above the High Street shops, in 1980s and newer blocks and in divided houses: plan the refit around the lease, the home below and the shared parts of the building.

Discuss your project

The kinds of flat found in Wanstead

The flats of Wanstead are housed in buildings of quite different kinds. Above the High Street shops, many are reached by way of side lanes rather than through a shopfront. Snaresbrook’s 1993 enhancement scheme names Eagle Lodge, a group of flats from the 1980s, and the 2025 management plan for Wanstead Grove records a handful of apartment blocks put up early in the twenty-first century. Other flats occupy storeys of houses that have since been split.

The building shapes the work as strongly as the rooms do. Above a shop, the drainage stack, the water main and perhaps the stair can serve the business and the other flats too. Blocks built as flats normally have a managing agent who looks after the common parts and may set rules for contractors. In a split house, your floor may be someone else’s ceiling. Our first visit establishes which of these you have, where the shared services run and who manages the building, because each answer changes what can be agreed and with whom.

Lease consent, the freeholder and the council

The lease is the first document we look at, ahead of any drawing. According to the Leasehold Advisory Service, whether a landlord must agree to alterations depends on the terms of the individual lease, and a grant of planning permission or building control approval does not settle that question (LEASE guidance on alterations and improvements). For the request we prepare plans and a plain account of the proposed work, and ask the freeholder or agent at the start what else they want to see, so nothing is ordered before consent arrives.

Outside, different rules apply. Redbridge’s 2014 guidance for the borough’s conservation areas notes that the rights householders have to make some changes without an application apply only to houses, so a flat has none, and any change to its exterior, from windows to a new vent, starts as a planning question. A refit that stays entirely indoors is not normally development, so planning seldom comes into it. For a listed building, the council expects consent for most works, indoor ones among them; 145B High Street, for example, is listed at Grade II.

Sound, floors and the home below

Legally, the boards under your feet may be shared. GOV.UK’s guide to party walls and building work treats a floor separating two flats in different ownership as a party structure, and the council’s own Party Wall Act page confirms the Act reaches walls and floors between flats as well as between houses. Notifiable work to that floor means serving notice on the owner on its other side.

Noise is the everyday side of the same fact. When a carpeted room is changed to timber or tile, or a kitchen or bathroom moves over a neighbour’s bedroom, the make-up of the floor affects how much sound travels down. We specify the floor with that in mind, look for any lease clause on floor finishes, and agree the build-up with the managing agent before materials arrive. New pipes and ducts are routed so that they do not bridge the separation between one flat and the next.

Inside the flat, Building Regulations still apply. New windows or doors, a new consumer unit, changes to the heating or added radiators, and a bathroom with new plumbing all appear on GOV.UK’s list of work needing approval. No separate application is needed when the work is carried out by a firm registered under a competent person scheme, and the circuits we install in flats are certified to BS 7671 by a registered competent person.

The front door, the stair and the services you share

In a block, a flat’s front door usually opens onto the stair or corridor that every resident uses to leave the building, so we regard it as a fire safety component of the whole building rather than as ordinary joinery. We do not change the door, its frame, its closer or any glazing above it without the managing agent’s written agreement, and where the agent specifies a door, that is the door we fit. Walls onto the common parts are left uncut.

Shared areas are covered up before anything is carried in: boards on stair treads, sheeting on walls and lift linings where there is a lift, with routes kept clear while work goes on. Shared risers, rising mains and communal aerial or entry-phone cables are traced first so that nothing serving other homes is disturbed. Over a shop, access may run through a back door or yard used by the business, so deliveries are arranged with the shop’s occupier as well as with the landlord.

Working in a shared building, from start to finish

Redbridge limits building work to weekday hours of 8am to 6pm and Saturday mornings from 8am to 2pm, and Sundays and bank holidays are off limits for noisy work (council noise guidance); house rules in a block can be tighter. Before we begin, we write to the agent and to neighbouring flats saying when we start and which stages will be loudest, such as lifting floors or chasing walls for cables.

Leaving a skip on the public road requires a licence from Redbridge, a skip standing on parking bays needs a bay suspension as well, and a scaffold or hoarding over the pavement has a licence of its own (Redbridge skip, hoarding and scaffolding licences). A skip on private land, such as a driveway, needs no licence, but a home over a High Street shop rarely has one, so waste is often bagged and collected instead.

When the work is done, we clean the common parts and inspect them with the agent, hand you the certificates and send copies to the agent if asked, and our work is covered by the 12-month defects period from completion.

Continue planning

The Wanstead area guide · Flat refurbishment across London · Hampstead Architecture & Planning · Hampstead Chartered Surveyors & Building Consultancy

Discuss your project

Tell us what you are planning in Wanstead

Share the property location, the work you have in mind and any drawings or permissions you already have.

£5M public liability, £10M employers' liability and contractors' all risks cover.