Flat refurbishment in Victoria Park Village

Updated 11 November 2026

Flats cut from divided Victorian houses and a former school near the park: the lease, the shared building and the neighbours planned before the rooms.

Discuss your project

How the village’s flats came about

Very few homes around Lauriston Road were built as flats. Hackney’s 2012 conservation area appraisal notes that after the war many of the big Victorian houses on Lauriston Road, Southborough Road and Victoria Park Road were split up, and that the old Lauriston Road School, dating from 1891, has been turned into flats as well. So a flat here is usually a set of rooms carved out of something else: original floors, walls and a staircase from the house or school, with partitions, kitchens and bathrooms added when it was divided.

That history decides what the survey has to find out. Two flats in one house can rest on quite different construction, depending on how and when each was formed. On the first visit we note which walls are original and which came with the conversion, how the floor between your flat and the one beneath is put together, where the shared soil stack and water supply run, which parts of the building the lease makes yours and which stay with the freeholder, and whether your front door opens onto a common hall or straight to the street.

Lease consent comes before drawings

For a leaseholder, the lease is the first approval to think about, not the last. The Leasehold Advisory Service points out that a lease may make alterations depend on the landlord’s permission, and that a planning decision or Building Regulations sign-off for the same work is no substitute for it. Whether your landlord is an individual, a company the leaseholders own together or a larger owner with a managing agent, we begin by reading three parts of the lease with you: the alterations clause, the clause dealing with pipes and services, and any rule on floor coverings.

Next we assemble what a landlord is likely to ask for: drawings of the flat as it is and as proposed, a note of any structural change with our engineers’ input, and a description of how the hall and stair will be protected. That consent is secured before the work it covers begins. Any conditions the landlord attaches, such as set hours, an inspection by their surveyor or a specified floor build-up, are written into the scope so that the quotation reflects them.

Windows, doors and the outside of a flat

A flat has narrower planning freedoms than a house. Hackney’s December 2025 SPD on extensions and alterations says flats have no permitted development rights, and the council’s 2011 conservation area information sheet on windows and doors treats new ones in a flat as needing a full planning application. The appraisal itself counts lost original windows and doors among the area’s weaknesses. A flat owner troubled by rattling sashes is often better served by overhauling and draught-stripping them and fitting secondary glazing, which Hackney’s Retrofit SPD names as one way to reduce heat loss, than by applying to replace them.

The frames may not even be yours; some leases keep windows with the freeholder, and only your lease can say. If the converted house is listed, Hackney expects listed building consent for internal works as well as external ones, which can bring a new partition or a relocated bathroom inside the flat into the consent process. For a building on the Tower Hamlets side of the park, begin with that council’s rules instead.

Sound between flats and shared fire protection

The floors and walls that now separate flats in a converted house were built to divide rooms within one home. When a carpeted floor becomes timber or tile, footsteps travel further into the flat below, so we check the lease for a floor-covering rule and design the build-up (a resilient layer under the boards, skirtings held clear of the new floor, sealed holes where pipes pass through) before the finish is chosen. If a kitchen or bathroom is moving into a room that never had one, the Planning Portal expects Building Regulations approval to be likely, so that the new room is properly ventilated and drained, structurally stable and safe in electrical and fire terms.

A flat entrance door that opens onto a common hall or stair normally forms part of the building’s fire protection, and the hall itself usually belongs to the freeholder. We do not alter, re-hang or take the closer off that door without agreement from the freeholder or managing agent, and any replacement is specified to at least the fire performance of the one it replaces. Turning a closed kitchen into an open-plan living space can also change how the flat’s escape route works, which we settle with building control while the design is still on paper.

Working inside a shared building

The builders share the front door, the hall and the stair with everyone else in the house, so access is agreed with the managing agent or the other leaseholders before anyone arrives. We cover hall floors and stair treads, protect banisters, newel posts and door frames, keep tools and materials inside the flat rather than in the common parts, and carry waste out as it is produced. Shared services, such as the soil stack or the rising water main, are isolated only after the neighbours who depend on them have been told.

Hackney permits noisy building work from 8am to 6pm on weekdays and from 8am to 1pm on Saturdays, with none on Sundays or bank holidays, according to its guidance on construction noise. The flats above and below, and the managing agent, receive written notice of the loudest days. For a flat across the boundary in Tower Hamlets, that council asks for approval before noisy work on a Saturday.

From survey to sign-off

The sequence for a flat runs like this: a survey of the flat and the parts of the building it relies on; a review of the lease; design; the landlord’s consent, plus Hackney’s if anything external or any listed fabric changes; a Building Regulations application where the work needs one; and then the build. Floors and walls are inspected before they are closed up. At the end you hold drawings of what was actually built, any completion certificate from building control, electrical certification from a registered competent person and the landlord’s sign-off if the lease calls for it, and our 12-month aftercare/defects period runs from there.

Continue planning

The Victoria Park Village area guide · Flat refurbishment across London · Hampstead Architecture & Planning · Hampstead Chartered Surveyors & Building Consultancy

Discuss your project

Tell us what you are planning in Victoria Park Village

Share the property location, the work you have in mind and any drawings or permissions you already have.

£5M public liability, £10M employers' liability and contractors' all risks cover.