Start from the ground, the water and the walls you share, then plan the rooms.

Discuss your project

A lower floor already, or a new dig?

Plenty of houses in Victoria Park Village were built with rooms below the hall. Hackney’s conservation area appraisal describes Cadogan Terrace as two storeys over a deep basement, with flights of steps up to paired front doors, and notes that houses on the main roads commonly stand three or four storeys high on a basement. The borough’s 2025 design guidance, which names Cassland Road among Hackney’s surviving Georgian streets, says houses of that period typically have a raised ground floor over a basement, with a front area enclosed by railings. Turning a lower floor of this kind into living space is a different undertaking from excavating where nothing lies below the ground floor.

The distinction drives the consents. Hackney’s 2011 conservation area information sheet says new basements, enlarged basements and new lightwells need planning permission. Work wholly inside a building is generally not development, so fitting out an existing cellar without enlarging it or opening a lightwell may need no planning application, although listing can change that, and we confirm with building control which parts of the work need Building Regulations approval. Our structural engineers measure the existing headroom, the depth and condition of the footings and the state of the walls before anyone decides whether the floor has to come down, since lowering it is excavation, with every rule that follows.

We also ask Hampstead Chartered Surveyors & Building Consultancy to look at the party-wall position early, and Hampstead Architecture & Planning to coordinate the design and the application.

How big Hackney will let a basement be

Hackney’s Residential Extensions and Alterations SPD sets the frame for a new or enlarged basement. It should be a single storey with at least 2.15 metres of headroom, smaller in area than one and a half times the footprint of the house, and it should project into the rear garden no further than half the depth of the house, measured from the main rear wall, and no further than half the depth of the garden. It should not cost trees, garden space or biodiversity. Where it runs beyond the house it must be set in from the neighbouring boundaries and carry at least a metre of soil over its roof, with sustainable drainage to make good the ground lost to infiltration and proper regard for the root protection areas of trees nearby.

The council is open about the reasons for caution. It notes that basements are carbon-intensive to build, chiefly in their retaining walls and groundworks, and that giving garden over to a basement or lightwell increases runoff that can contribute to local flooding. A habitable room underground must also receive adequate daylight: as a rule of thumb, a line rising at 30 degrees from the centre of the basement window should clear anything in the lightwell in front of it.

Lightwells and small front gardens

Almost every house here has a small, established front garden, the appraisal observes, most of them too small ever to have been turned into parking. That makes the lightwell the most visible part of any basement scheme. Hackney normally accepts a front lightwell where lightwells are already an established feature of the street, and then within limits: no more than half of the original front garden by area or by depth, a clear 1.5 metres between the window pane and the retaining wall, centred on the main front window, well back from the pavement edge and not recessed into the ground-floor wall. The application has to show the rest of the garden too, with planting kept or improved, room for bins and bikes, and permeable surfaces.

Losing an entire front garden to a lightwell is resisted. Grilles and railings should be simple and suit the house, and a rear lightwell should take up no more than half of the original rear garden. On streets such as Cadogan Terrace the front steps and boundary are part of the composition, and Hackney’s guidance resists the loss of traditional boundary treatments in a conservation area, so we record them and agree how they will be supported and shielded before excavation begins.

Water in the ground and trees above it

Under Hackney’s Local Plan 2033, policy LP53 asks for a flood risk assessment where a basement is proposed in an area at high risk of surface water flooding. The government’s long term flood risk service gives a first view of an area’s risk from rivers and the sea, surface water, reservoirs and, where data is available, groundwater, but it does not say how likely a particular property is to flood and it leaves out blocked drains and burst pipes. A design has to rest on the site itself, so our engineers start with a ground investigation that establishes the soil, the groundwater level and the depth and form of the foundations on both sides.

Trees can rule a scheme out as firmly as water. Policy LP51 says the council will refuse the removal of protected trees, conservation area trees included, unless overriding ecological or wider planning benefits are shown, and in a Hackney conservation area any work to a tree whose stem measures 7.5 cm or more across at 1.5 metres above ground needs six weeks’ notice to the council, as its trees page explains. We plot every tree close to the dig, including those over the garden fence, before the excavation line is drawn.

Party walls, listing and taking the spoil away

Digging beside a neighbour is the clearest case of notifiable work. GOV.UK’s guidance on what you must tell your neighbour about includes digging below and near the level of their foundations, cutting into a party wall and making one deeper, so a basement under a terraced house is likely to mean notices to the owners on both sides before work starts. In a listed building, such as Hackney Terrace or the Grade II houses of Church Crescent, Hackney’s SPD requires listed building consent for internal as well as external works, and Local Plan policy LP3 asks for the historic plan form to be respected. Building Regulations approval is a further application, which Hackney asks to come after any planning permission.

Getting soil away is the part neighbours notice most. A skip on the road needs a Hackney skip licence, which only an approved skip company can obtain; if it has to stand in a parking bay, the suspension must be applied for at least 7 working days ahead, and scaffold, hoarding, stored materials or a container on the highway need a highways licence. Hackney restricts noisy work to 8am–6pm on weekdays and 8am–1pm on Saturdays, with none on Sundays or bank holidays. Where the floors above are divided into flats, we agree with the occupants which days will carry the heaviest work.

Continue planning

The Victoria Park Village area guide · Basement conversion across London · Hampstead Architecture & Planning · Hampstead Chartered Surveyors & Building Consultancy

Discuss your project

Tell us what you are planning in Victoria Park Village

Share the property location, the work you have in mind and any drawings or permissions you already have.

£5M public liability, £10M employers' liability and contractors' all risks cover.

Design support: Hampstead Architecture & Planning. Surveying support: Hampstead Chartered Surveyors & Building Consultancy.