Loft conversion in Emerson Park

Updated 11 November 2026

Survey the roof you have, then test any dormer against Havering’s 2011 roof guidance.

Discuss your project

Reading an Emerson Park roof before drawing a loft

The Emerson Park Policy Area document, which Havering adopted in February 2009, opens by portraying a district of individually different, carefully maintained family houses standing alone on roomy, planted plots, and in the sectors of mainly medium-sized family houses it wants any new home to be detached and individually designed. Variety sets the terms for a loft here. A low-pitched hipped roof gives up far less usable volume than a steep gabled one, and chimney stacks, purlins, cold water tanks and the position of today’s staircase all limit what fits under the slopes. Sector 5 mixes in smaller, often semi-detached houses, and on those half the roofline a passer-by sees is shared, visually, with the neighbouring home.

On the survey visit we run a tape from the joist tops up to the ridge, read the angle of every slope, note how deep the joists are and how far they reach between supports, and look along the landing for a spot where another flight could begin. Those readings go to our in-house structural engineers, who judge whether today’s ceiling joists can stay beneath a new floor or need new joists and steel alongside, and where any beam would land. Room layouts come last, since clear height above a new staircase and the route out in a fire settle a loft plan far more firmly than any view from a dormer.

Dormers and gable ends under Havering’s 2011 roof guidance

Havering kept its householder design guide on extensions and alterations, published March 2011, and the chapter on roofs is the most detailed local advice a loft scheme will be measured against. Dormers belong on the back slope, hidden from the road, and should sit comfortably inside the roof: a good distance up from the eaves, well clear of any gable or party wall, and low beneath the ridge, which a dormer must never break. Small pitched dormers, their ridges at right angles to the main roof, are favoured over a single broad box, and each window in the roof should borrow its proportions, detailing and placing from the windows of the original house below.

A dormer on the road side is the exception. Should the council judge one harmless, the guide caps its width at 1.2 metres and never more than its own height; if that elevation needs more glazing, two modest pitched dormers with space between them are preferred, adding up to no more than half the roof’s width taken at mid-height. Putting a dormer in the sloping end of a hipped roof is not normally acceptable, especially when front or rear dormers are planned as well. On hip-to-gable schemes the guide notes that squaring off one half of a semi-detached pair can throw the pair out of balance, and that a gable end is unacceptable wherever hips are a feature of the house or the street and the change is one the council controls.

When a loft can proceed without a planning application

The roof allowance for houses, known as Class B, is explained in the government’s householder technical guidance. Extra roof space is capped at 40 cubic metres for a terrace house and 50 for detached or semi-detached ones. A roof slope that forms the main elevation facing a road cannot be built out, and no part of the work may stand taller than the top of the existing roof. Adding a balcony, verandah or raised platform takes the scheme outside the allowance. Any window placed in a side slope has to be obscure-glazed and non-opening below 1.7 metres from the room’s floor. Facing materials should resemble those already on the house, and the new structure should, where practicable, keep 20 centimetres or more back from the eaves. A flat gets no such allowance.

The allowance is withdrawn for roofs on designated land, conservation areas among it. Havering’s 11 conservation areas do not include Emerson Park, nor does any direction on the council’s Article 4 list single the area out; the one borough-wide direction that reaches it deals with houses in multiple occupation, not roofs. Two questions are left. How much volume has earlier roof work used up? And has an old planning condition stripped the rights from this house, a possibility the 2011 guide flags? A certificate of lawfulness, described in that guide as a way to confirm a project needs no planning permission, puts the answer in writing before the roof is opened. A design outside the limits becomes a planning application, tested against the 2009 requirement that an extension’s bulk, architectural character and the gap it leaves to the next building sit comfortably in the street.

The stair, fire protection and the floor below

Put a room on top of a house and the fire strategy for every floor changes. The Planning Portal’s loft fire safety page asks for the escape to be thought through from top to bottom, not only in the new room, so the floors below often need upgrading too. Its worked example, a loft on a two-storey house, involves fire-resisting doors, in some cases new partitions around the stairway, and smoke alarms wired to the mains and linked to each other on each storey of the stair. Because it rules out climbing from a window above first floor level as too dangerous, the enclosed stair must carry everyone out, and floors and other structural parts may need better fire resistance. Owners of houses that already have three storeys are referred to Approved Document B and to building control.

That is why the new flight is fixed early in the design: where it arrives on the first floor, whether a bedroom or the landing gives up space for it, the clear height left above it beneath the slope, and which doors on the way down get changed. Insulation, ventilation and the wiring layout are drawn alongside, since inside a pitched roof each one constrains the others. Planning and Building Regulations are two different approvals, and for building control Havering describes a full plans submission as its most thorough route, meant for bigger or more involved jobs; we confirm in writing which party submits it before a single tile is lifted.

Shared walls, scaffolding and an open roof

If the loft leans on a wall it shares with next door, notice is usually due. Among the works GOV.UK says the neighbour must be told about are cutting into a party wall, building it higher and taking chimneys out of it, and in a loft that typically means steel beams seated in the shared gable or the removal of a chimney breast. So the question arises on most of the semi-detached houses the 2009 document places in Sector 5, and deserves a check on any detached house standing close to its neighbour. Serving notice early, with drawings marking exactly where each beam is seated, keeps the exchange with next door practical.

A roof cannot be converted without scaffolding, and if any of it must stand on the pavement or carriageway, Havering asks for a highway licence for scaffold and hoarding, which needs ten working days of notice and proof of insurance. With the tiles off, temporary sheeting keeps the rooms beneath dry, the landing and stair used by the trades are boarded and covered, and we agree with the family which bedrooms remain in use while the loft floor is laid.

Continue planning

The Emerson Park area guide maps the sectors and lists every approval; for how a London loft runs from first visit to sign-off, see our loft conversion page. Design work is led by Hampstead Architecture & Planning, and if the rafters, purlins or supporting walls need a closer look, contact Hampstead Chartered Surveyors & Building Consultancy for a survey.

Discuss your project

Tell us what you are planning in Emerson Park

Share the property location, the work you have in mind and any drawings or permissions you already have.

£5M public liability, £10M employers' liability and contractors' all risks cover.

Design support: Hampstead Architecture & Planning. Surveying support: Hampstead Chartered Surveyors & Building Consultancy.

Your details will be used to respond to your enquiry. Read our privacy policy.