Flat refurbishment in Emerson Park
Refurbishing a flat in one of Emerson Park’s Sector 1 blocks, planned around the lease, the managing agent and the neighbours above, below and alongside.
Discuss your projectWhere Emerson Park’s flats are
Emerson Park is a district of houses, and Havering means to keep it so: the 2009 Policy Area document refuses the conversion of houses into flats anywhere within its boundary. Flats are concentrated instead in Sector 1, the frontage on Butts Green Road and Ardleigh Green Road from Berther Road to Woodlands Avenue, which the document records as already given over in large part to flatted development. Its appendix lists several Sector 1 schemes by “all numbers”, Greyfriars House, Greenways Court, Buckingham Close, Thorpe Close and Ridgemont Place among them.
For any further flats along that frontage the document lays down conditions: three storeys at most, generous plots, screened private sitting-out space, and cars coming in from the rear or side rather than straight off the two main roads. Those are tests for new schemes, not a description of every block standing today, so on a refurbishment we look at the real building: how many floors it has, how its stairs and landings are shared, where residents park and where a skip or a van can wait without blocking anyone. A skip standing on the road needs a council licence, and Havering issues that licence to the firm hiring out the skip.
Lease consent and the managing agent
In a flat, the first document to read is the lease rather than any planning rule. Its alterations clause decides whether you may change the layout, move the kitchen or bathroom, alter floors or touch the structure, and whether the landlord’s written consent must come first. The Leasehold Advisory Service (LEASE) makes the point that consent under a lease may still be required once planning permission or Building Regulations approval is in hand. The three answer different questions, and none of them substitutes for another.
Where consent is needed we prepare drawings and a short method statement the managing agent can assess: what comes out, where new pipes and cables will run, how the floor will be made up, and how the shared parts of the building will be protected. Some blocks also keep house rules on working hours, deliveries and use of the stairs or lift; we ask for them before the job is planned in detail, because they shape the day-to-day running of the site.
An interior refit seldom raises planning issues, since alterations kept inside a building are generally not development. A flat, though, carries no householder permitted development rights, so any change to the outside needs checking; Havering’s 2011 residential extensions and alterations guidance states that laying a new hard standing for a flat always calls for planning permission.
Sound between neighbouring flats
Noise is the complaint most likely to sour relations with the household below. Lifting carpet to lay a hard floor, or moving a bathroom so that it sits over someone else’s bedroom, can change how much footfall and plumbing noise travels down through the structure. Before any finish is chosen we find out what the separating floor is built from and what the lease says about floor coverings.
When a timber or stone floor is wanted, we specify a resilient underlay and stop the new surface short of the walls with a flexible edge, so that it does not bridge the sound break. Soil and waste pipes are boxed in with insulation and held on isolating clips rather than fixed hard to the structure. Any question building control has about sound for a particular change is dealt with while the design is still on paper, not after the floor is down.
Fire doors, landings and common parts
The entrance door of a flat opening onto a shared landing is part of the building’s fire protection, not simply your front door. GOV.UK’s fact sheet on fire doors under the Fire Safety (England) Regulations 2022 explains that in blocks below 11 metres the general duty still requires every fire door, flat entrance doors included, to be capable of giving adequate protection. Residents are to be told why doors must be kept shut and that neither the doors nor their self-closing devices should be tampered with.
So we do not trim, re-hang or replace an entrance door, change its ironmongery or adjust its closer without the freeholder or managing agent agreeing first. A replacement has to give the fire protection the block needs, and its closer has to work. Inside the flat, moving walls or doors around the hallway can alter the way out in a fire, so the layout is checked with building control at drawing stage.
Before work starts, the route from the front entrance to the flat is protected on floors and walls, a dust screen goes up at the flat door, and debris leaves in sealed bags rather than loose through the stairwell. Deliveries and collections are booked away from the busiest times of day for residents.
Pipes and supplies that serve the whole block
Soil stacks, water mains, gas pipes and electrical supplies in a block often serve more than one flat. Before a layout is agreed we trace which pipes belong to you and which are shared, find the stop valve and the meters, and test whether a moved kitchen or bathroom can reach the stack with enough fall. Work on shared services normally needs the managing agent’s agreement, and sometimes a planned shutdown for other residents that has to be arranged and announced well ahead.
Wiring inside the flat is treated much as it would be in a house. GOV.UK names swapping the fuse board along with its connected circuits, and changing electrics close to a bath or shower, among the alterations that need Building Regulations approval, unless the electrician belongs to a competent person scheme. A registered competent person certifies the new circuits to BS 7671, and we pass the certificates to you and, where the lease asks for them, to the landlord.
Continue planning
The Emerson Park area guide · Flat refurbishment across London · Hampstead Architecture & Planning · Hampstead Chartered Surveyors & Building Consultancy
Discuss your project
Tell us what you are planning in Emerson Park
Share the property location, the work you have in mind and any drawings or permissions you already have.
£5M public liability, £10M employers' liability and contractors' all risks cover.
Design support: Hampstead Architecture & Planning. Surveying support: Hampstead Chartered Surveyors & Building Consultancy.