Holland Park · W11 · Kitchen Extension

Kitchen Extensions in Holland Park, W11

Updated 14 July 2026

London service guide: Kitchen extensions.

In-house RIBA Chartered Architects · £10M insurance · RICS surveying support

Designed Around the Kitchen

A kitchen extension succeeds or fails on decisions that have nothing to do with brickwork: where the island sits, how far the cook stands from the table, whether morning light reaches the worktop. So we begin with the kitchen brief and let the architecture serve it — the drainage run for an island sink, the ducting route for extraction and the rooflight positions are all fixed on the drawings before any structural design starts. These are the calls we resolve first.

How We Run Your Project

Six stages, kitchen decisions first, so nothing gets value-engineered mid-build.

  1. Kitchen brief — how you cook, shop, eat and entertain, recorded before anyone sketches a wall.
  2. Layout studies — alternative plans tested against the brief until the strongest arrangement wins on evidence.
  3. Technical design & consents — cabinetry, services and structure coordinated on one set of drawings while the paperwork progresses.
  4. Single itemised price — building work, kitchen installation and services committed in one document before we start.
  5. Shell to weathertight — the new structure built and sealed, with service routes cast in exactly where the kitchen plan needs them.
  6. Installation & commissioning — cabinetry, appliances, stone and lighting fitted, tested and handed over snag-free.

Most kitchen extension builds run 10–16 weeks once on site. Read the full kitchen extension guide for layout options, glazing choices and programme detail.

The regulatory load on a kitchen extension is heavily service-driven: new cooking extraction must discharge correctly under the ventilation rules, relocated sinks need compliant drainage falls, kitchen circuits are notifiable electrical work, and large glazed openings must satisfy energy standards — all inspected and certified through building control, which we manage. The planning route itself depends on your street: consented, permitted development or conservation-area constrained. Check your borough’s position in our planning guide library.

Why Hampstead Renovations

A kitchen extension is really two projects — a build and a kitchen — and most go wrong where they meet. Ours are drawn by our in-house RIBA Chartered Architects with the cabinetry, structure and services on the same drawings, priced fixed on JCT terms, and built by teams we bring back project after project. RICS surveying support is available through our sister company where party wall or condition questions arise. Every contract carries £10M public liability cover, a 12-month defects period and a 10-year workmanship warranty. Call before 2pm on a weekday for a same-day response.

Kitchen Extension in Holland Park: Questions

Do I need planning permission for a kitchen extension?

In a Holland Park conservation area, almost always — permitted-development rights are restricted, so the extension needs a planning application and a careful design.

Kitchen Extension in Nearby Areas

Kitchen Extension in Notting Hill Kitchen Extension in Kensington Kitchen Extension in Hammersmith Kitchen Extension in Chelsea

Book a Free Consultation

Visit our studio or invite us to survey your home. We’ll assess scope, discuss design possibilities and provide an honest budget framework — completely free.

020 8054 8756Mon–Fri, 9am – 6pm
contact@hampsteadrenovations.co.ukWe respond within 24 hours

Free Consultation

We survey your property, discuss your vision and provide a clear budget framework.

Enquire before 2pm — we’ll call you the same day (Mon–Fri).