Victorian renovation in Battersea SW11 — Victorian terrace and villa renovation for properties on Prince of Wales Drive, Battersea Park Road, Albert Bridge Road. Victorian-era properties share common issues: solid walls needing thermal upgrade, timber sash windows requiring careful restoration, lead plumbing requiring full replacement, and original cornicing / ceiling roses worth preserving.
Every victorian renovation project in Battersea is designed to respect the Park Town Estate Conservation Area and the character of park-facing mansion blocks, Victorian terraces, Battersea period conversions. Our in-house RIBA architects handle Wandsworth planning applications, our chartered structural engineers specify any load-bearing work, and our directly-employed trades deliver the build under one fixed-price contract. We coordinate Building Control, Party Wall awards where needed, and all certifications through to handover.
Battersea has conservation area coverage in parts, so some properties will need planning permission for external changes while others may proceed under permitted development. We assess each property individually.
Our victorian renovation projects in Battersea are delivered by our in-house team of RIBA architects, structural engineers and specialist tradespeople. Every project is managed under a single fixed-price contract with no hidden costs.
A Victorian house is a breathing structure, and a whole-house renovation in Battersea begins by accepting that rather than fighting it. The terraces that run from the park down towards the commons were built in solid brick with no cavity, bedded in lime mortar and lined internally with lime plaster on riven lath. Walls of that construction take up moisture in wet weather and give it back once conditions change. A great deal of the damp we are asked to investigate in SW11 period houses turns out not to be rising damp at all, but moisture held behind cement render, gypsum skim or plastic-bound paint applied during a later modernisation.
Planning the work in fabric order keeps that logic intact. The survey starts at the top, with slates, valley gutters, flashings and parapet copings, because one slipped slate above a valley will keep a party wall wet whatever is done inside. It moves next to the ground floor: suspended timber boards on joists built into wall pockets, served by airbricks that have usually been rendered over, buried by a raised patio or lost beneath a later concrete slab. Then it takes in the middle of the house — chimney breasts, flues and the spine wall — before any decorative programme is fixed.
Only after that do we schedule the joinery: sashes, panelled doors, skirtings, architraves, cornices and ceiling roses, recorded room by room so that whatever survives is repaired and whatever is missing is matched to a surviving profile. On the fine early-Victorian terraces of the Park Town Estate around Queenstown Road that record carries real weight, because Wandsworth scrutinises external change in its conservation areas and applies Article 4 controls. In the park-side mansion flats along Prince of Wales Drive and Albert Bridge Road the same fabric questions arise inside a lease, so freeholder consent runs in parallel with the specification.
A full refurbishment goes far deeper than new paint and replacement kitchens. It addresses everything behind the walls — rewiring electrical systems that haven't been updated since the 1960s, replacing lead plumbing with copper and plastic, insulating solid walls that leak heat through every brick, and reconfiguring floor plans designed for a Victorian household with live-in servants, not a contemporary family.
Our approach starts with the layout. Before selecting a single tile or paint colour, our architects redesign the floor plan — opening up cramped ground floors, relocating bathrooms, creating en-suites, adding utility rooms, improving circulation and sight-lines, and ensuring every square metre works harder.
Once the layout is resolved, our interior designers develop a cohesive design language that runs through every room — material palettes, joinery profiles, ironmongery, lighting schemes, tile specifications and colour stories developed as a unified whole. The result is a home that feels intentional throughout.
Every refurbishment is delivered under a single fixed-price contract covering design, structural alterations, full M&E, kitchen, bathrooms, flooring, joinery, decoration and all finishes. We don't quote for building work then add extras for interiors — it's all one price.
A full refurbishment touches every element of your home.
Removing and repositioning internal walls, creating open-plan spaces, adding en-suites, reconfiguring staircases and improving circulation. Our architects redesign the entire floor plan before a single trade enters the building.
Complete consumer unit replacement, new circuits, contemporary socket layouts with USB charging, dimmer circuits, smart home pre-wiring and lighting design circuits. Certified to BS 7671 18th Edition.
Full replumb replacing lead pipework. New condensing boiler or heat pump, radiator upgrade or underfloor heating, pressurised hot water systems and new waste connections.
Bespoke kitchen design with premium cabinetry and appliances. Bathroom fit-outs with wall-hung sanitary ware, walk-in showers, freestanding baths and underfloor heating.
Engineered oak, natural stone, porcelain, encaustic tile — specified room by room. Bespoke skirting, architraves, wardrobes, bookcases, window seats and alcove units designed to the property's character.
Architectural lighting schemes layering ambient, task and accent lighting. Smart control (Lutron, Rako), multi-room audio pre-wiring, automated blinds and centralised home control.
Victorian houses across SW11 share a recognisable plan, and every part of it decays and recovers in its own particular way.
On the long family terraces around Latchmere Road and the streets towards Clapham Junction this room-by-room record becomes the backbone of the specification. In the mansion flats facing Battersea Park the same schedule is drawn up, then read against the lease before anything is lifted.
Every room in a full refurbishment has its own technical requirements, specification decisions and sequencing considerations. Here is what is involved in each.
A full kitchen refurbishment begins with complete strip-out of existing units, flooring, wall finishes, electrics and plumbing. The space is then rewired with dedicated circuits for oven, hob, extraction, fridge-freezer and dishwasher, plus general socket circuits with USB provision. Plumbing is re-run in copper and plastic to new locations. The layout is redesigned for workflow efficiency — our kitchen designers follow the work-triangle principle while adapting to the specific proportions of your room. New installations include bespoke or premium cabinetry, stone or composite worktops, integrated appliances, feature lighting (under-cabinet, pendant, recessed), splashback tiling or glass, and engineered timber or stone flooring. Extraction is ducted to the outside. Underfloor heating is fitted beneath the finished floor.
Bathrooms require the most intensive waterproofing of any room in the house. We strip out all existing fittings, tiles and substrate, then apply tanking membrane to all wet areas (shower enclosures, bath surrounds, floors) before tiling. Underfloor heating is installed beneath porcelain or natural stone tiles. Plumbing is re-run to accommodate the new layout, often including relocation of waste stacks and soil pipes. Sanitaryware selection includes wall-hung WCs (for easier cleaning and a more spacious feel), freestanding or built-in baths, walk-in or wetroom showers with frameless glass enclosures, and twin basin vanity units. Heated towel rails, anti-mist mirrors, recessed LED lighting and extractor fans complete the specification.
Living rooms and reception rooms often involve structural alterations — removing load-bearing walls to create open-plan spaces, installing steel beams to support the floor above, and widening doorways to improve flow between rooms. Flooring is selected for acoustics and durability: engineered oak, natural stone or high-quality LVT. Lighting design layers ambient (recessed downlights or pendant fittings), task (reading lamps, desk lighting) and accent (picture lights, LED strips, uplighters) circuits on separate dimmer controls. Bespoke joinery — alcove shelving, window seats, media walls, fireplace surrounds — is designed to the proportions of each room. Walls are re-plastered to a smooth finish, and period features (cornicing, ceiling roses, dado rails) are restored or replicated where appropriate.
Bedroom refurbishment focuses on creating calm, well-organised spaces. Built-in wardrobes are designed floor-to-ceiling with internal fittings (hanging rails, shelving, drawers, shoe racks, lighting) tailored to how you dress. Acoustic insulation is installed in party walls and floors — particularly important in converted flats and terraced properties — using acoustic mineral wool and resilient bars to achieve meaningful sound reduction. Windows are overhauled or replaced: secondary glazing for listed properties, slim-profile double glazing for conservation areas, or high-performance triple glazing where planning allows. Blackout blinds, layered lighting (bedside, wardrobe, ambient) and smart controls complete a restful environment.
The hallway sets the tone for the entire house. In period properties, we restore original encaustic or geometric floor tiles, repair and French-polish timber balustrades, rebuild newel posts and reinstate panelled wainscoting or dado rails. Where the original features have been lost, we commission faithful reproductions from specialist joiners. Stair treads are repaired and finished in matching timber, with runners fitted for noise reduction and grip. Lighting is critical: a combination of pendant or lantern fittings, wall sconces and recessed lighting creates depth and warmth. Storage is built into dead space beneath staircases. Doorbells, entry systems, coat hooks, shoe storage and radiator covers are all specified as part of the design.
A dedicated utility room is one of the most requested additions in a full refurbishment. We create space for washing machine, tumble dryer (or washer-dryer), sink, drying rack, ironing station and cleaning supply storage. Plumbing and extraction are run to the utility room during first fix. Where space permits, a separate pantry with open shelving, cold storage and counter space significantly improves kitchen functionality. Plant rooms house the boiler (or heat pump indoor unit), hot water cylinder, consumer unit and any home automation hardware — keeping services accessible for maintenance while hidden from living spaces. Every cupboard and storage area is fitted with lighting and considered as part of the overall design.
With period fabric the honest question is rarely whether to keep the house, but which elements of it are repairable and which are genuinely spent. Original joinery is almost always the first argument. A Victorian sash was made from slow-grown timber and built to be taken apart; splicing a decayed cill horn, renewing a pulley stile, replacing cords and weights and fitting brush and blade draught seals returns a window to working order and removes most of the rattle and draught homeowners complain about. Slim double-glazed units can sometimes be accommodated in a deepened rebate where consent allows, but in the conservation areas Wandsworth protects, wholesale replacement is the option most likely to be refused, and Article 4 controls are precisely what remove the assumption that swapping windows is a free choice.
Plaster follows the same test. Lath and plaster that has lost its keys sounds hollow and moves under hand pressure; that ceiling comes down. Plaster that is merely cracked can be stitched, re-fixed with washer screws and skimmed in a lime finish that keeps the wall vapour-open. Roofs divide the same way: individual slipped slates and a failed valley lining are a repair, while widespread nail sickness across the slope means stripping, re-battening, felting and re-slating with the sound slates set to the visible elevations.
Chimney breasts are where rebuild logic is most often wrong. Removing one at ground level to gain a metre of wall leaves the breasts above hanging on nothing unless properly supported, and the stack still needs to be carried. On the terraces here that decision also touches the party wall, so the structural answer and the neighbour notice arrive together. Back-to-brick is right when services, floors, roof and plaster have all failed at once — not as a default because the house is old.
Not every property is best served by refurbishment. Here is how to decide whether to refurbish the existing structure or demolish and rebuild.
Refurbishment is the right choice when the existing structure is fundamentally sound — solid walls, stable foundations, a serviceable roof. It is also the preferred route when the property has period features worth preserving (original cornicing, ceiling roses, fireplaces, panelled doors, timber floors), when planning restrictions make demolition difficult or impossible (listed buildings, conservation areas), or when budget constraints favour working with the existing shell rather than starting from scratch. Most London period properties — Victorian terraces, Georgian townhouses, Edwardian semis — fall firmly into the refurbishment category.
Demolition and rebuild is justified when the existing structure has significant defects — severe subsidence, failed foundations, widespread dry rot affecting the structural timber, or extensive asbestos contamination that makes strip-out more expensive than demolition. It may also make sense when the desired layout is so radically different from the existing building that the structural alterations required would cost more than rebuilding. In some cases, a Whole Energy Retrofit analysis may show that the existing building fabric is so thermally poor that a new build to current standards offers better long-term value.
A comprehensive refurbishment typically costs £650–£1,250/sqm depending on specification level. A demolition and rebuild (excluding land value) costs substantially more per square metre. However, the rebuild figure includes foundations, superstructure, roof, external walls and all services — elements that already exist in a refurbishment. The decision should be made on a case-by-case basis following a thorough structural survey. We provide honest advice on which route offers the best outcome for your specific property.
Sequencing a period property is largely about drying time and dust. Before anything is disturbed, we test paint layers and suspect materials, because a house of this age can hold lead in its original joinery paint and asbestos in later flue linings, artex ceiling finishes, boiler flues and rainwater goods. Those results set the strip-out method, not the other way round.
Weathertightness comes first. Slate repairs, valley gutter renewal, parapet and coping work, stack repointing and rainwater goods are completed early so the structure begins to dry from the moment the internal strip starts. Airbricks are then cleared or reinstated and the subfloor void inspected, since joist ends bearing into damp brickwork will not improve while the wall is still being fed water from above.
Structural moves follow: beams over knocked-through receptions, any chimney breast support, lintel replacement over widened openings, and joist repairs where a bathroom or stair has been cut into over the years. Only once the structure is fixed do first-fix services run, and in a Victorian house the routes are negotiated rather than chosen — notching depth is limited, and chases in soft lime-bedded brick are kept shallow and away from the mid-height of any wall.
Lime plaster then needs time. It is applied in coats, each one allowed to cure, and it will not be rushed to suit a decorating date; gypsum over a solid wall dries faster and traps moisture behind it. Joinery reinstatement, floor sanding and finishing, then decoration, close the programme.
Access shapes the calendar too. Much of the housing here sits on residential streets, so skips, scaffold licences, slate deliveries and lime deliveries are booked around parking restrictions. Where the work touches a shared wall in a terrace or a flat in one of the park-side blocks, notices and freeholder consents are started well before the first coat of plaster is mixed.
The order in which trades enter the building is critical. Getting the sequence wrong causes delays, rework and damage to finished surfaces. Here is the correct order and why it matters.
Everything that is being replaced is removed: kitchens, bathrooms, floor coverings, old plaster, redundant electrics and plumbing, partition walls. The building is taken back to its structural shell. This reveals the true condition of the property — hidden damp, rotten timbers, failed lintels, asbestos — allowing problems to be addressed before new work begins. Skipping a thorough strip-out is the most common cause of cost overruns, because defects discovered after new work has started require expensive rework.
Load-bearing walls are removed and steel beams installed. Floors are strengthened, lintels replaced, timber joists sistered or renewed. Any underpinning, foundation work or damp-proofing is completed at this stage. Structural work must be finished and signed off by building control before first fix begins, because the building must be structurally stable before services are installed within it.
New electrical cables are run to every socket, switch, light fitting and appliance position. Plumbing pipes are run to every tap, WC, bath, shower, washing machine and boiler location. Heating pipework (radiators or underfloor) is laid. Ventilation ductwork is installed. First fix happens before plastering because all cables and pipes need to be concealed within the walls and floors. Getting the positions right at this stage is critical — moving a socket after plastering means cutting out plaster, re-routing cable and re-plastering.
Walls and ceilings are plastered to a smooth finish over the first-fix services. This creates the final surface for decoration and must be done to a high standard — imperfections in plaster are visible through paint. Plaster must dry thoroughly (typically 2–4 weeks depending on season and ventilation) before decoration begins. Rushing this stage leads to paint failure and mould. We monitor moisture levels with a hygrometer and do not begin decoration until readings are within tolerance.
Electrical face plates (sockets, switches, light fittings) are installed. Bathroom and kitchen fittings are connected. Radiators or underfloor heating thermostats are fitted. Doors are hung, ironmongery fitted, skirting boards and architraves installed. This stage brings the house from a building site to something recognisable as a home.
Kitchen units, worktops, splashbacks and appliances are installed. Bathrooms are tiled, sanitaryware fitted, screens and mirrors hung. These are the highest-specification elements of the refurbishment and require careful protection during subsequent decoration work.
Walls are mist-coated (to seal new plaster), then finished with two coats of emulsion. Woodwork is undercoated and gloss-finished (or eggshell for a contemporary look). Ceilings are painted. Wallpaper is hung where specified. This stage must happen after all dusty trades (plastering, tiling, sanding) are complete to avoid contamination of wet paint surfaces.
A detailed room-by-room inspection identifies any defects: paint touch-ups, alignment adjustments, scratches, incomplete seals, stiff handles, squeaky floorboards. Every snag is logged, photographed and rectified before handover. We provide a full handover pack including appliance manuals, paint references, material specifications, electrical certificates, gas safety records and a 12-month defects liability warranty.
Period fabric meets modern regulation at several specific points, and knowing which control applies avoids abortive work. Structure is the clearest: forming a wider opening between the two receptions, taking out a chimney breast, or altering joists to suit a new bathroom are all notifiable, need calculations and are inspected. Support for the stack above a removed breast is checked in its own right, not treated as part of the general opening design.
Moisture and ventilation follow. Suspended timber ground floors depend on cross-ventilation through airbricks, and blocking them while insulating between joists is one of the more common ways to rot a floor that has survived for well over a century. Where internal wall insulation is added to a solid brick wall, the build-up must be vapour-open and detailed around joist ends, reveals and party wall junctions, since the calculation that satisfies energy requirements can still create an interstitial condensation risk if the material choice is wrong. Background and extract ventilation to kitchens and bathrooms is required whatever the age of the house.
Reopened fireplaces bring flue rules into play: lining, hearth construction, air supply and carbon monoxide alarms are all covered, and a swept, tested flue is not the same as a compliant one. Escape and protection to the stair enclosure apply once a loft is brought into use, and electrical and drainage work is certified in the usual way.
Consent sits alongside all of it. Wandsworth applies Article 4 controls and examines external change in its conservation areas, so windows, roof alterations and front elevations need permission checked before order. Listed buildings within SW11 require listed building consent for internal as well as external work, and in the mansion flats a Licence to Alter from the freeholder governs what may be touched. Shared walls in a terrace bring the party wall award process into the same timetable.
Not every refurbishment requires building regulations approval, but many elements do. Here are the key Approved Documents that commonly apply.
Any electrical work in a dwelling must be carried out by a Part P registered electrician or notified to building control. A full rewire, new consumer unit, new circuits, or work in bathrooms and kitchens all require Part P compliance. On completion, you receive an Electrical Installation Certificate and the work is registered on the national database. We use Part P registered electricians on every project and provide full certification as standard.
When you replace more than 25% of a thermal element (roof, walls, floors, windows), the replacement must meet current thermal performance standards. This means if you are replastering walls, you may need to add insulation to meet the required U-values. Similarly, window replacement triggers minimum energy performance requirements. In a full refurbishment where all elements are being renewed, a SAP assessment may be required to demonstrate overall energy performance. We design insulation strategies that improve thermal performance without compromising room proportions or period character.
If you are refurbishing a flat within a converted building, fire safety regulations apply to the means of escape. Fire doors (FD30S) must be fitted to all habitable rooms opening onto a communal hallway. Smoke detection systems must comply with BS 5839. Fire-resistant construction may be required to walls and ceilings separating your flat from communal areas and other dwellings. Where structural alterations create new openings in fire-separating elements, fire stopping must be installed to maintain compartmentalisation.
When converting a house into flats, or refurbishing an existing flat conversion, Part E requires minimum acoustic performance between dwellings. This typically means upgrading floor and wall constructions to achieve specified airborne and impact sound insulation values. Even in a single dwelling, acoustic insulation between bedrooms and living spaces significantly improves comfort. We specify acoustic mineral wool, resilient bars, acoustic plasterboard and floating floor systems where required to achieve or exceed the minimum standards.
A structured process ensuring nothing is missed.
Full property survey — structural condition, M&E assessment, damp checks, asbestos screening. We discuss how you use each room, your lifestyle priorities and aesthetic preferences. You receive a feasibility report with scope, budget and timeline.
Architects redesign the floor plan. Interior designers develop material palettes, colour schemes, joinery details, bathroom and kitchen schemes, lighting and furniture layouts — all in photorealistic 3D. Every selection approved from physical samples before ordering. Complete specification document locks in every finish before construction.
Property stripped to structural shell. Old kitchens, bathrooms, floor coverings, plaster, electrics and plumbing removed. Structural engineering-led alterations: walls removed, steels installed, floors strengthened. Asbestos professionally removed where found.
New electrical circuits, plumbing and heating throughout. Underfloor heating, insulation, plasterboarding, plastering and stud walls for new room configurations. Every socket, switch and pipe position exactly as specified.
Kitchen installation, bathroom tiling, flooring throughout, bespoke joinery, staircase renovation, door hanging, ironmongery, second fix electrics, painting and decoration — room by room to quality sign-off. Snagging and handover with 12-month warranty.
Guide prices per sqm. All tiers include design, structural work, full M&E, kitchens, bathrooms and decoration.
What makes our refurbishments different from a builder and a decorator.
Layout redesign by a RIBA architect and interior specification by a dedicated designer — working in tandem from day one. Spatial planning and material palette developed together, not sequentially.
Every room rendered in photorealistic 3D before construction. See exactly how finishes, furniture and lighting work together. Changes on screen, not on site.
One price for design, M&E, structural work, kitchen, bathrooms, flooring, joinery and decoration. Not a builder's quote with interiors as an extra — a single all-inclusive figure.
We understand Victorian proportions, Georgian joinery profiles, Edwardian ceiling heights and how to introduce contemporary elements that complement period character.
Our Finchley Road studio houses stone samples, timber swatches, tile displays, fabric books and ironmongery collections — all for in-person selection.
We manage procurement of every material and fitting — coordinating lead times across 50+ suppliers to ensure on-time site delivery.
Insulation improvements, draught-proofing, boiler upgrades and window enhancements that improve energy performance without compromising character.
Original sashes overhauled, draught-sealed, re-weighted and re-glazed rather than replaced — maintaining heritage character and avoiding replacement costs.
Dedicated project manager coordinates all trades, manages the programme, conducts weekly inspections and provides regular client updates.
We refurbish both vacant properties (fastest) and occupied homes (phased room-by-room). We advise the most practical approach for your circumstances.
Many clients appoint us before completing on a purchase — so the programme starts on day of exchange and the house is ready to move into on completion.
Selected whole-house refurbishments across London.
Full strip-back and reconfiguration. New open-plan ground floor, 3 bathrooms, bespoke kitchen and complete rewire/replumb.
Sensitive refurbishment: new kitchen-diner, 3 redesigned bathrooms, period joinery restoration and complete M&E upgrade.
Complete 95sqm flat refurbishment. New layout with en-suite master, open-plan kitchen-living, full rewire and contemporary interior.
Need a same-day repair in NW London?
Visit Hampstead On Demand →We bought a tired 1890s terrace and appointed Hampstead Renovations before exchange. They started the day we got the keys. Eighteen weeks later we moved into a home that felt like it had been built for us — the layout is completely different but every period detail respected. The interior design continuity room to room makes the whole house feel intentional.
The 3D room renders were game-changing. We could see exactly how the herringbone floor, wall colour, pendant lights and joinery worked together before orders were placed. We made two changes in design that would have cost thousands on site. The fixed price held exactly across 22 weeks and 240 square metres.
We refurbished our Maida Vale flat while renting it out — Hampstead managed everything without us visiting once during the 12-week build. The procurement coordination was extraordinary: every tile, fitting and piece of ironmongery arrived exactly when needed. Boutique hotel standard quality. Tenants moved in the day after handover.
Common questions about full house refurbishment.
A typical full refurbishment of a 3–4 bedroom London property takes 12–24 weeks on site, depending on the scope of structural works, specification level and property size. A smaller flat (1–2 bedrooms) with no structural alterations can be completed in 8–12 weeks. Larger properties (5+ bedrooms) or projects involving basement or loft conversions may take 6–9 months. Add 4–8 weeks of design time before construction begins. We provide a detailed programme at the start of every project showing weekly milestones and key decision points.
For a full refurbishment — where every room is being stripped, rewired and replastered — we strongly recommend moving out. The property will have no functioning kitchen or bathroom during the works, dust levels are significant during strip-out and plastering phases, and the constant presence of trades makes daily living extremely difficult. Most clients either rent nearby, stay with family or use short-term accommodation. For partial refurbishments (one floor at a time), it may be possible to live in the unaffected part of the property, though this extends the programme and requires careful sequencing.
The terms are often used interchangeably, but in the construction industry, a refurbishment implies a more comprehensive scope than a renovation. A renovation might involve updating kitchens and bathrooms, redecorating and minor repairs — working with the existing layout and services. A full refurbishment typically means stripping the property back to its structural shell and rebuilding everything: new electrics, new plumbing, new heating, new layout, new finishes throughout. It is essentially creating a new home within an existing shell. Our full refurbishment service covers the complete scope from strip-out to handover.
Internal refurbishment work generally does not require planning permission — you can rewire, replumb, replaster, fit new kitchens and bathrooms, and redecorate without any planning application. However, planning permission is needed if you are: changing the external appearance of the building (new windows, changing door positions, removing chimneys), making structural alterations visible from outside, changing the use of the property, or working on a listed building (where Listed Building Consent is required for most internal and external works). In conservation areas, window replacement and external changes may also require planning consent.
Our full refurbishment costs typically range from £650–£1,250/sqm, depending on specification level. A standard refurbishment sits at the lower end of that range and includes complete rewire, replumb, plastering, new kitchen, new bathrooms, flooring and decoration to a good quality. A premium specification sits mid-range and adds bespoke joinery, designer kitchens, high-end sanitaryware, engineered timber flooring and architectural lighting. An ultra-premium specification sits at the top of that range and includes top-tier brands (Bulthaup, Lefroy Brooks, Dinesen), smart home systems, and bespoke everything. For a 150 sqm London house, expect total costs of £75,000–£180,000 depending on specification.
Our full refurbishment scope covers: architectural layout redesign, 3D visualisations, complete strip-out, structural alterations (wall removals, steels), full electrical rewire to 18th Edition, full replumb in copper and plastic, new heating system (boiler or heat pump), plastering throughout, new kitchen design and installation, new bathroom design and installation, flooring throughout (timber, stone, tile or LVT), bespoke joinery (wardrobes, shelving, media walls), staircase renovation, door replacement or overhaul, ironmongery, lighting design, decoration (paint, wallpaper), and snagging. Interior design specification is included as part of the package — not charged separately.
Yes, for most elements of a full refurbishment. Electrical rewiring must comply with Part P and be certified by a registered electrician. Structural engineering-led alterations (wall removals, new beams) require building regulations approval under Part A. Replacement windows must meet Part L energy standards. Heating installations must comply with Part J (combustion appliances) and Part L. In flats, fire safety (Part B) and acoustic (Part E) requirements apply. We manage all building regulations applications and inspections as part of our service, ensuring full compliance and providing all necessary certificates at handover.
Protecting original features is a priority on every period property refurbishment. Before strip-out, we conduct a detailed survey identifying features to retain: original cornicing, ceiling roses, fireplaces, floor tiles, timber floors, panelled doors, balustrades, stained glass and decorative plasterwork. These are either protected in situ with boarding, dust sheets and impact protection, or carefully removed, labelled and stored off-site for reinstatement. Our specialist plasterers can repair damaged cornicing and cast new sections to match existing profiles. Original timber floors are sanded and refinished. Fireplaces are restored, re-lined where necessary and fitted with appropriate grates or log burners. Where original features have been lost in previous unsympathetic alterations, we commission faithful reproductions from specialist craftspeople.
A full refurbishment often includes elements from our specialist services. Explore the detail.
Bespoke kitchen design, premium cabinetry, integrated appliances and stone worktops — our dedicated kitchen service delivers the heart of your refurbished home.
Walk-in showers, freestanding baths, wall-hung sanitaryware and underfloor heating — every bathroom designed as a spa-like retreat.
Wall removals, steel beam installations, floor strengthening and foundation work — the structural backbone of every refurbishment project.
Use these area-specific guide pages to compare the next build routes, planning questions and cost topics people commonly research in Battersea SW11.
Visit our studio or invite us to survey your home. We'll assess scope, discuss design possibilities and provide an honest budget framework — completely free.
We survey your property, discuss your vision and provide a clear budget framework.
Book Free ConsultationOur design studio is 25 minutes from Battersea. Wandsworth planning specialists.
The same NW3 design-build team covers the neighbouring areas: