We deliver Hampstead Heath townhouse renovation with architects, engineers, surveyors and builders under one fixed-price contract - design, technical coordination, procurement, directly managed site teams, Building Control, programme control and final handover through one accountable team.
Every townhouse renovation project in Hampstead Heath is designed to respect the Hampstead Conservation Area and the character of Heath-adjacent Victorian villas, Edwardian terraces, Heath-facing mansion flats. Our in-house RIBA architects handle Camden planning applications, our chartered structural engineers specify any load-bearing work, and our directly-employed trades deliver the build under one fixed-price contract. We coordinate Building Control, Party Wall awards where needed, and all certifications through to handover.
In Hampstead Heath's conservation area, external alterations during refurbishment require Camden approval. Our architects balance modern interior requirements with heritage exterior preservation.
Properties directly adjoining Hampstead Heath command London's highest premiums. Combination of Hampstead and Highgate conservation areas with the most sensitive planning environment in north London.
Camden · NW3
Full Refurbishment projects in Hampstead Heath may require Camden planning permission depending on the scope of work. As a conservation area, Hampstead Heath has additional restrictions on external alterations. Our planning team assesses requirements at the initial consultation and manages all applications.
All full refurbishment work in Hampstead Heath must comply with building regulations. We manage the building control process, from initial notice through inspections to the completion certificate. Our in-house engineers ensure all structural work meets current standards.
Our RIBA architects design full refurbishment projects in Hampstead Heath that respect the character of large detached victorian and edwardian houses, arts & crafts properties, listed buildings and grand period homes. Conservation area policies require sympathetic design and appropriate materials. We balance contemporary living requirements with the architectural heritage of the area.
Every full refurbishment project in Hampstead Heath is managed by a dedicated project manager from design through to completion. We coordinate all trades, manage Camden inspections and keep you informed with weekly progress reports. Our fixed-price contracts mean no surprises.
Our in-house planning team handles applications across Camden. View our planning track record →
Camden · NW3
Strip it back, reimagine it, rebuild it beautifully. Our full refurbishment service takes a tired or dated London home and transforms every room — reconfiguring layouts, upgrading all services, installing new kitchens and bathrooms and delivering a cohesive interior design that unifies the entire property. One team, one contract, one vision.
A townhouse in Hampstead Heath NW3 is a tall, narrow building before it is anything else, and a whole-house renovation here begins by treating the vertical arrangement as the design problem. Living space is stacked over four, five or sometimes six levels, from a lower ground floor set against the front pavement to a top storey squeezed under the slope of the roof. Among the period houses on the streets around South End Road and Parliament Hill, the plan is rarely more than two rooms deep, so the brief is settled floor by floor rather than room by room.
The first decision is vertical zoning: which level carries the kitchen and everyday eating, which holds the quiet reception space, where the principal bedroom sits, and how many flights separate a child's room from an adult's. Get that wrong and the household spends its life on the staircase. Get it right and a narrow house feels generous, because each floor does one thing properly instead of three things badly.
Because the house is joined to neighbours on both sides, daylight and outlook can only arrive from the front, the rear and the roof. That is why so much of a townhouse scheme concentrates on the back elevation, the lightwell and rooflights above the stairwell. It is also why consent shapes the design early: Camden assesses proposals against the Hampstead Conservation Area statement adopted in October 2001, and where a house has a visual or physical relationship with the Heath, the Hampstead Neighbourhood Plan 2025-2040, adopted on 21 July 2025, asks that the lush open character of the Heath edge is preserved and impact minimised.
A full refurbishment goes far deeper than new paint and replacement kitchens. It addresses everything behind the walls — rewiring electrical systems that haven't been updated since the 1960s, replacing lead plumbing with copper and plastic, insulating solid walls that leak heat through every brick, and reconfiguring floor plans designed for a Victorian household with live-in servants, not a contemporary family.
Our approach starts with the layout. Before selecting a single tile or paint colour, our architects redesign the floor plan — opening up cramped ground floors, relocating bathrooms, creating en-suites, adding utility rooms, improving circulation and sight-lines, and ensuring every square metre works harder.
Once the layout is resolved, our interior designers develop a cohesive design language that runs through every room — material palettes, joinery profiles, ironmongery, lighting schemes, tile specifications and colour stories developed as a unified whole. The result is a home that feels intentional throughout.
Every refurbishment is delivered under a single fixed-price contract covering design, structural alterations, full M&E, kitchen, bathrooms, flooring, joinery, decoration and all finishes. We don't quote for building work then add extras for interiors — it's all one price.
A full refurbishment touches every element of your home.
Removing and repositioning internal walls, creating open-plan spaces, adding en-suites, reconfiguring staircases and improving circulation. Our architects redesign the entire floor plan before a single trade enters the building.
Complete consumer unit replacement, new circuits, contemporary socket layouts with USB charging, dimmer circuits, smart home pre-wiring and lighting design circuits. Certified to BS 7671 18th Edition.
Full replumb replacing lead pipework. New condensing boiler or heat pump, radiator upgrade or underfloor heating, pressurised hot water systems and new waste connections.
Bespoke kitchen design with premium cabinetry and appliances. Bathroom fit-outs with wall-hung sanitary ware, walk-in showers, freestanding baths and underfloor heating.
Engineered oak, natural stone, porcelain, encaustic tile — specified room by room. Bespoke skirting, architraves, wardrobes, bookcases, window seats and alcove units designed to the property's character.
Architectural lighting schemes layering ambient, task and accent lighting. Smart control (Lutron, Rako), multi-room audio pre-wiring, automated blinds and centralised home control.
Every room in a full refurbishment has its own technical requirements, specification decisions and sequencing considerations. Here is what is involved in each.
A full kitchen refurbishment begins with complete strip-out of existing units, flooring, wall finishes, electrics and plumbing. The space is then rewired with dedicated circuits for oven, hob, extraction, fridge-freezer and dishwasher, plus general socket circuits with USB provision. Plumbing is re-run in copper and plastic to new locations. The layout is redesigned for workflow efficiency — our kitchen designers follow the work-triangle principle while adapting to the specific proportions of your room. New installations include bespoke or premium cabinetry, stone or composite worktops, integrated appliances, feature lighting (under-cabinet, pendant, recessed), splashback tiling or glass, and engineered timber or stone flooring. Extraction is ducted to the outside. Underfloor heating is fitted beneath the finished floor.
Bathrooms require the most intensive waterproofing of any room in the house. We strip out all existing fittings, tiles and substrate, then apply tanking membrane to all wet areas (shower enclosures, bath surrounds, floors) before tiling. Underfloor heating is installed beneath porcelain or natural stone tiles. Plumbing is re-run to accommodate the new layout, often including relocation of waste stacks and soil pipes. Sanitaryware selection includes wall-hung WCs (for easier cleaning and a more spacious feel), freestanding or built-in baths, walk-in or wetroom showers with frameless glass enclosures, and twin basin vanity units. Heated towel rails, anti-mist mirrors, recessed LED lighting and extractor fans complete the specification.
Living rooms and reception rooms often involve structural alterations — removing load-bearing walls to create open-plan spaces, installing steel beams to support the floor above, and widening doorways to improve flow between rooms. Flooring is selected for acoustics and durability: engineered oak, natural stone or high-quality LVT. Lighting design layers ambient (recessed downlights or pendant fittings), task (reading lamps, desk lighting) and accent (picture lights, LED strips, uplighters) circuits on separate dimmer controls. Bespoke joinery — alcove shelving, window seats, media walls, fireplace surrounds — is designed to the proportions of each room. Walls are re-plastered to a smooth finish, and period features (cornicing, ceiling roses, dado rails) are restored or replicated where appropriate.
Bedroom refurbishment focuses on creating calm, well-organised spaces. Built-in wardrobes are designed floor-to-ceiling with internal fittings (hanging rails, shelving, drawers, shoe racks, lighting) tailored to how you dress. Acoustic insulation is installed in party walls and floors — particularly important in converted flats and terraced properties — using acoustic mineral wool and resilient bars to achieve meaningful sound reduction. Windows are overhauled or replaced: secondary glazing for listed properties, slim-profile double glazing for conservation areas, or high-performance triple glazing where planning allows. Blackout blinds, layered lighting (bedside, wardrobe, ambient) and smart controls complete a restful environment.
The hallway sets the tone for the entire house. In period properties, we restore original encaustic or geometric floor tiles, repair and French-polish timber balustrades, rebuild newel posts and reinstate panelled wainscoting or dado rails. Where the original features have been lost, we commission faithful reproductions from specialist joiners. Stair treads are repaired and finished in matching timber, with runners fitted for noise reduction and grip. Lighting is critical: a combination of pendant or lantern fittings, wall sconces and recessed lighting creates depth and warmth. Storage is built into dead space beneath staircases. Doorbells, entry systems, coat hooks, shoe storage and radiator covers are all specified as part of the design.
A dedicated utility room is one of the most requested additions in a full refurbishment. We create space for washing machine, tumble dryer (or washer-dryer), sink, drying rack, ironing station and cleaning supply storage. Plumbing and extraction are run to the utility room during first fix. Where space permits, a separate pantry with open shelving, cold storage and counter space significantly improves kitchen functionality. Plant rooms house the boiler (or heat pump indoor unit), hot water cylinder, consumer unit and any home automation hardware — keeping services accessible for maintenance while hidden from living spaces. Every cupboard and storage area is fitted with lighting and considered as part of the overall design.
On a townhouse the refurbish-or-rebuild question is not really a choice. A house joined to neighbours on both sides cannot be taken down and started again: the party walls carry your floor joists as well as theirs, and the terrace is a single structural run. So the honest version of the question is how far back to strip, and how many floors need to be opened at once.
The test is usually vertical, not cosmetic. If the house needs new services from the lower ground floor to the top storey, the walls and floors will be open anyway, and a back-to-brick approach on the affected levels adds little to the disruption of a partial one. If the wiring, drainage and heating were renewed within the last cycle and the stair, joists and roof are sound, the sensible scheme keeps the fabric and concentrates on kitchens, bathrooms, joinery and thermal comfort.
Three things should be surveyed before that decision is made: the staircase, because replacing it changes the geometry of every floor it passes; the front and rear walls, because a deep narrow plan puts almost all the movement and damp risk at the two ends; and the roof, because a top-floor addition is far less disruptive to build while the scaffold is already up.
External work is also constrained. Camden publishes an Article 4 schedule and map for the Hampstead Conservation Area, and Article 4 directions remove specified permitted-development rights, so a plan that assumes free rein over windows, roof form or front elevation details may need a formal application instead. That is a planning conversation to have before the demolition scope is written, not after.
Not every property is best served by refurbishment. Here is how to decide whether to refurbish the existing structure or demolish and rebuild.
Refurbishment is the right choice when the existing structure is fundamentally sound — solid walls, stable foundations, a serviceable roof. It is also the preferred route when the property has period features worth preserving (original cornicing, ceiling roses, fireplaces, panelled doors, timber floors), when planning restrictions make demolition difficult or impossible (listed buildings, conservation areas), or when budget constraints favour working with the existing shell rather than starting from scratch. Most London period properties — Victorian terraces, Georgian townhouses, Edwardian semis — fall firmly into the refurbishment category.
Demolition and rebuild is justified when the existing structure has significant defects — severe subsidence, failed foundations, widespread dry rot affecting the structural timber, or extensive asbestos contamination that makes strip-out more expensive than demolition. It may also make sense when the desired layout is so radically different from the existing building that the structural alterations required would cost more than rebuilding. In some cases, a Whole Energy Retrofit analysis may show that the existing building fabric is so thermally poor that a new build to current standards offers better long-term value.
A comprehensive refurbishment typically costs £650–£1,250/sqm depending on specification level. A demolition and rebuild (excluding land value) costs substantially more per square metre. However, the rebuild figure includes foundations, superstructure, roof, external walls and all services — elements that already exist in a refurbishment. The decision should be made on a case-by-case basis following a thorough structural survey. We provide honest advice on which route offers the best outcome for your specific property.
Sequencing a townhouse is a logistics exercise in one dimension. Everything - people, materials, waste, services - has to travel up and down one narrow staircase, and the order of work either respects that or fights it for the whole programme.
The usual pattern is structure first from the bottom, then finishes from the top. Underpinning, lowering a lower ground floor, forming openings in the spine wall and installing steels happen while the house is empty of finishes. Roof and top-floor work follows while the scaffold stands. Only then does the house get first-fix services, and this is the moment to fix the riser positions - one continuous vertical route from lower ground to roof for soil, water, heating flow and return, and data - because retrofitting a riser later means opening every floor again.
Access planning is its own workstream. Narrow NW3 streets restrict where a skip, hoist or delivery lorry can stand, so materials are often broken into stair-sized loads, and long items such as steels, stone slabs and baths may need to come in through a window opening or over the rear scaffold rather than through the front door. Waste follows the same route in reverse.
Party wall procedure sits at the front of the programme, not the middle. A mid-terrace house has neighbours on both sides, so notifiable work usually means two sets of notices and potentially two party wall awards, each with its own response period.
Phased occupation is possible where the staircase can be split into a clean household route and a works route, with sealed floors, dust screens and a temporary kitchen on an upper level while the lower floors are opened up.
The order in which trades enter the building is critical. Getting the sequence wrong causes delays, rework and damage to finished surfaces. Here is the correct order and why it matters.
Everything that is being replaced is removed: kitchens, bathrooms, floor coverings, old plaster, redundant electrics and plumbing, partition walls. The building is taken back to its structural shell. This reveals the true condition of the property — hidden damp, rotten timbers, failed lintels, asbestos — allowing problems to be addressed before new work begins. Skipping a thorough strip-out is the most common cause of cost overruns, because defects discovered after new work has started require expensive rework.
Load-bearing walls are removed and steel beams installed. Floors are strengthened, lintels replaced, timber joists sistered or renewed. Any underpinning, foundation work or damp-proofing is completed at this stage. Structural work must be finished and signed off by building control before first fix begins, because the building must be structurally stable before services are installed within it.
New electrical cables are run to every socket, switch, light fitting and appliance position. Plumbing pipes are run to every tap, WC, bath, shower, washing machine and boiler location. Heating pipework (radiators or underfloor) is laid. Ventilation ductwork is installed. First fix happens before plastering because all cables and pipes need to be concealed within the walls and floors. Getting the positions right at this stage is critical — moving a socket after plastering means cutting out plaster, re-routing cable and re-plastering.
Walls and ceilings are plastered to a smooth finish over the first-fix services. This creates the final surface for decoration and must be done to a high standard — imperfections in plaster are visible through paint. Plaster must dry thoroughly (typically 2–4 weeks depending on season and ventilation) before decoration begins. Rushing this stage leads to paint failure and mould. We monitor moisture levels with a hygrometer and do not begin decoration until readings are within tolerance.
Electrical face plates (sockets, switches, light fittings) are installed. Bathroom and kitchen fittings are connected. Radiators or underfloor heating thermostats are fitted. Doors are hung, ironmongery fitted, skirting boards and architraves installed. This stage brings the house from a building site to something recognisable as a home.
Kitchen units, worktops, splashbacks and appliances are installed. Bathrooms are tiled, sanitaryware fitted, screens and mirrors hung. These are the highest-specification elements of the refurbishment and require careful protection during subsequent decoration work.
Walls are mist-coated (to seal new plaster), then finished with two coats of emulsion. Woodwork is undercoated and gloss-finished (or eggshell for a contemporary look). Ceilings are painted. Wallpaper is hung where specified. This stage must happen after all dusty trades (plastering, tiling, sanding) are complete to avoid contamination of wet paint surfaces.
A detailed room-by-room inspection identifies any defects: paint touch-ups, alignment adjustments, scratches, incomplete seals, stiff handles, squeaky floorboards. Every snag is logged, photographed and rectified before handover. We provide a full handover pack including appliance manuals, paint references, material specifications, electrical certificates, gas safety records and a 12-month defects liability warranty.
Building control on a townhouse is dominated by one thing: the staircase is also the escape route, and the taller the house, the harder the rules work. Once any floor sits more than 4.5 metres above ground level - which in practice means the third storey of a typical NW3 period house, and every storey added above it - the stair normally has to be a protected route, with fire-resisting construction to the enclosure, self-closing fire doors to habitable rooms and a properly considered final exit. Adding a top-floor bedroom or converting a loft is what most often triggers this, and it can mean upgrading doors and linings on floors you had not planned to touch, or agreeing an alternative approach such as a suppression system where a compliant protected stair genuinely cannot be formed.
Stair geometry itself is regulated: rise and going, headroom, handrails and guarding all have minimum standards, and a historic stair that is retained is treated differently from a new one that replaces it. Structural approval is needed for openings in the spine wall, for removing chimney breasts on upper floors, and for any beam bearing into a party wall.
Lower ground floors bring their own set: drainage below the level of the sewer usually needs pumped provision, damp-proofing and tanking details have to be demonstrated, and mechanical ventilation is generally required where a room sits deep in the plan with only a lightwell for air. Thermal upgrades, replacement glazing and ventilation to new bathrooms and kitchens are all assessed too, and in a conservation area the specification has to satisfy Camden's design expectations as well as the regulations.
Not every refurbishment requires building regulations approval, but many elements do. Here are the key Approved Documents that commonly apply.
Any electrical work in a dwelling must be carried out by a Part P registered electrician or notified to building control. A full rewire, new consumer unit, new circuits, or work in bathrooms and kitchens all require Part P compliance. On completion, you receive an Electrical Installation Certificate and the work is registered on the national database. We use Part P registered electricians on every project and provide full certification as standard.
When you replace more than 25% of a thermal element (roof, walls, floors, windows), the replacement must meet current thermal performance standards. This means if you are replastering walls, you may need to add insulation to meet the required U-values. Similarly, window replacement triggers minimum energy performance requirements. In a full refurbishment where all elements are being renewed, a SAP assessment may be required to demonstrate overall energy performance. We design insulation strategies that improve thermal performance without compromising room proportions or period character.
If you are refurbishing a flat within a converted building, fire safety regulations apply to the means of escape. Fire doors (FD30S) must be fitted to all habitable rooms opening onto a communal hallway. Smoke detection systems must comply with BS 5839. Fire-resistant construction may be required to walls and ceilings separating your flat from communal areas and other dwellings. Where structural alterations create new openings in fire-separating elements, fire stopping must be installed to maintain compartmentalisation.
When converting a house into flats, or refurbishing an existing flat conversion, Part E requires minimum acoustic performance between dwellings. This typically means upgrading floor and wall constructions to achieve specified airborne and impact sound insulation values. Even in a single dwelling, acoustic insulation between bedrooms and living spaces significantly improves comfort. We specify acoustic mineral wool, resilient bars, acoustic plasterboard and floating floor systems where required to achieve or exceed the minimum standards.
A structured process ensuring nothing is missed.
Full property survey — structural condition, M&E assessment, damp checks, asbestos screening. We discuss how you use each room, your lifestyle priorities and aesthetic preferences. You receive a feasibility report with scope, budget and timeline.
Architects redesign the floor plan. Interior designers develop material palettes, colour schemes, joinery details, bathroom and kitchen schemes, lighting and furniture layouts — all in photorealistic 3D. Every selection approved from physical samples before ordering. Complete specification document locks in every finish before construction.
Property stripped to structural shell. Old kitchens, bathrooms, floor coverings, plaster, electrics and plumbing removed. Structural engineering-led alterations: walls removed, steels installed, floors strengthened. Asbestos professionally removed where found.
New electrical circuits, plumbing and heating throughout. Underfloor heating, insulation, plasterboarding, plastering and stud walls for new room configurations. Every socket, switch and pipe position exactly as specified.
Kitchen installation, bathroom tiling, flooring throughout, bespoke joinery, staircase renovation, door hanging, ironmongery, second fix electrics, painting and decoration — room by room to quality sign-off. Snagging and handover with 12-month warranty.
Guide prices per sqm. All tiers include design, structural work, full M&E, kitchens, bathrooms and decoration.
What makes our refurbishments different from a builder and a decorator.
Layout redesign by a RIBA architect and interior specification by a dedicated designer — working in tandem from day one. Spatial planning and material palette developed together, not sequentially.
Every room rendered in photorealistic 3D before construction. See exactly how finishes, furniture and lighting work together. Changes on screen, not on site.
One price for design, M&E, structural work, kitchen, bathrooms, flooring, joinery and decoration. Not a builder's quote with interiors as an extra — a single all-inclusive figure.
We understand Victorian proportions, Georgian joinery profiles, Edwardian ceiling heights and how to introduce contemporary elements that complement period character.
Our Finchley Road studio houses stone samples, timber swatches, tile displays, fabric books and ironmongery collections — all for in-person selection.
We manage procurement of every material and fitting — coordinating lead times across 50+ suppliers to ensure on-time site delivery.
Insulation improvements, draught-proofing, boiler upgrades and window enhancements that improve energy performance without compromising character.
Original sashes overhauled, draught-sealed, re-weighted and re-glazed rather than replaced — maintaining heritage character and avoiding replacement costs.
Dedicated project manager coordinates all trades, manages the programme, conducts weekly inspections and provides regular client updates.
We refurbish both vacant properties (fastest) and occupied homes (phased room-by-room). We advise the most practical approach for your circumstances.
Many clients appoint us before completing on a purchase — so the programme starts on day of exchange and the house is ready to move into on completion.
Selected whole-house refurbishments across London.
Full strip-back and reconfiguration. New open-plan ground floor, 3 bathrooms, bespoke kitchen and complete rewire/replumb.
Sensitive refurbishment: new kitchen-diner, 3 redesigned bathrooms, period joinery restoration and complete M&E upgrade.
Complete 95sqm flat refurbishment. New layout with en-suite master, open-plan kitchen-living, full rewire and contemporary interior.
Need a same-day repair in NW London?
Visit Hampstead On Demand →We bought a tired 1890s terrace and appointed Hampstead Renovations before exchange. They started the day we got the keys. Eighteen weeks later we moved into a home that felt like it had been built for us — the layout is completely different but every period detail respected. The interior design continuity room to room makes the whole house feel intentional.
The 3D room renders were game-changing. We could see exactly how the herringbone floor, wall colour, pendant lights and joinery worked together before orders were placed. We made two changes in design that would have cost thousands on site. The fixed price held exactly across 22 weeks and 240 square metres.
We refurbished our Maida Vale flat while renting it out — Hampstead managed everything without us visiting once during the 12-week build. The procurement coordination was extraordinary: every tile, fitting and piece of ironmongery arrived exactly when needed. Boutique hotel standard quality. Tenants moved in the day after handover.
Can we stay in the house while a townhouse renovation runs floor by floor?
Sometimes. Because a townhouse stacks its rooms, work can be phased so that upper floors stay sealed and habitable while the lower ground and ground floors are opened up, with a temporary kitchen on a bedroom level. It only works if the staircase can be divided into a clean household route and a works route, and if the noisiest structural weeks are grouped into one period you spend elsewhere.
Can a lift be fitted into a narrow period house near the Heath?
Occasionally, but the plan usually decides against it. A domestic lift needs an aligned shaft on every floor plus headroom and a pit, and in a two-rooms-deep house the only aligned space is normally the stair void or a corner of each room, which costs the same area four or five times over. Where it does work, it is generally designed in from the start rather than added later.
How do we get daylight into the middle of a deep, narrow plan?
Light has to be brought in from the ends and from above, because both flanks are party walls. The usual moves are a rooflight over the stairwell so light falls through the core of the house, a glazed return or side glazing where a rear addition steps in, and widening or deepening the front lightwell to serve the lower ground floor.
Do party wall awards apply on both sides of a mid-terrace house?
Yes, if the notifiable work affects both. Cutting into a party wall for beams, underpinning near a neighbour's foundations or excavating within the statutory distances requires notice to each adjoining owner separately, so a mid-terrace townhouse commonly ends up with two awards. Serving early matters, as each neighbour has their own response period before work can begin.
Common questions about full house refurbishment.
A typical full refurbishment of a 3–4 bedroom London property takes 12–24 weeks on site, depending on the scope of structural works, specification level and property size. A smaller flat (1–2 bedrooms) with no structural alterations can be completed in 8–12 weeks. Larger properties (5+ bedrooms) or projects involving basement or loft conversions may take 6–9 months. Add 4–8 weeks of design time before construction begins. We provide a detailed programme at the start of every project showing weekly milestones and key decision points.
For a full refurbishment — where every room is being stripped, rewired and replastered — we strongly recommend moving out. The property will have no functioning kitchen or bathroom during the works, dust levels are significant during strip-out and plastering phases, and the constant presence of trades makes daily living extremely difficult. Most clients either rent nearby, stay with family or use short-term accommodation. For partial refurbishments (one floor at a time), it may be possible to live in the unaffected part of the property, though this extends the programme and requires careful sequencing.
The terms are often used interchangeably, but in the construction industry, a refurbishment implies a more comprehensive scope than a renovation. A renovation might involve updating kitchens and bathrooms, redecorating and minor repairs — working with the existing layout and services. A full refurbishment typically means stripping the property back to its structural shell and rebuilding everything: new electrics, new plumbing, new heating, new layout, new finishes throughout. It is essentially creating a new home within an existing shell. Our full refurbishment service covers the complete scope from strip-out to handover.
Internal refurbishment work generally does not require planning permission — you can rewire, replumb, replaster, fit new kitchens and bathrooms, and redecorate without any planning application. However, planning permission is needed if you are: changing the external appearance of the building (new windows, changing door positions, removing chimneys), making structural alterations visible from outside, changing the use of the property, or working on a listed building (where Listed Building Consent is required for most internal and external works). In conservation areas, window replacement and external changes may also require planning consent.
Our full refurbishment costs typically range from £650–£1,250/sqm, depending on specification level. A standard refurbishment sits at the lower end of that range and includes complete rewire, replumb, plastering, new kitchen, new bathrooms, flooring and decoration to a good quality. A premium specification sits mid-range and adds bespoke joinery, designer kitchens, high-end sanitaryware, engineered timber flooring and architectural lighting. An ultra-premium specification sits at the top of that range and includes top-tier brands (Bulthaup, Lefroy Brooks, Dinesen), smart home systems, and bespoke everything. For a 150 sqm London house, expect total costs of £75,000–£180,000 depending on specification.
Our full refurbishment scope covers: architectural layout redesign, 3D visualisations, complete strip-out, structural alterations (wall removals, steels), full electrical rewire to 18th Edition, full replumb in copper and plastic, new heating system (boiler or heat pump), plastering throughout, new kitchen design and installation, new bathroom design and installation, flooring throughout (timber, stone, tile or LVT), bespoke joinery (wardrobes, shelving, media walls), staircase renovation, door replacement or overhaul, ironmongery, lighting design, decoration (paint, wallpaper), and snagging. Interior design specification is included as part of the package — not charged separately.
Yes, for most elements of a full refurbishment. Electrical rewiring must comply with Part P and be certified by a registered electrician. Structural engineering-led alterations (wall removals, new beams) require building regulations approval under Part A. Replacement windows must meet Part L energy standards. Heating installations must comply with Part J (combustion appliances) and Part L. In flats, fire safety (Part B) and acoustic (Part E) requirements apply. We manage all building regulations applications and inspections as part of our service, ensuring full compliance and providing all necessary certificates at handover.
Protecting original features is a priority on every period property refurbishment. Before strip-out, we conduct a detailed survey identifying features to retain: original cornicing, ceiling roses, fireplaces, floor tiles, timber floors, panelled doors, balustrades, stained glass and decorative plasterwork. These are either protected in situ with boarding, dust sheets and impact protection, or carefully removed, labelled and stored off-site for reinstatement. Our specialist plasterers can repair damaged cornicing and cast new sections to match existing profiles. Original timber floors are sanded and refinished. Fireplaces are restored, re-lined where necessary and fitted with appropriate grates or log burners. Where original features have been lost in previous unsympathetic alterations, we commission faithful reproductions from specialist craftspeople.
A full refurbishment often includes elements from our specialist services. Explore the detail.
Bespoke kitchen design, premium cabinetry, integrated appliances and stone worktops — our dedicated kitchen service delivers the heart of your refurbished home.
Walk-in showers, freestanding baths, wall-hung sanitaryware and underfloor heating — every bathroom designed as a spa-like retreat.
Wall removals, steel beam installations, floor strengthening and foundation work — the structural backbone of every refurbishment project.
Use these area-specific guide pages to compare the next build routes, planning questions and cost topics people commonly research in Hampstead Heath NW3.
Visit our studio or invite us to survey your home. We'll assess scope, discuss design possibilities and provide an honest budget framework — completely free.
We survey your property, discuss your vision and provide a clear budget framework.