Golders Green · NW11 · Full Refurbishment

Full Refurbishment
in Golders Green, NW11

Architects, Engineers, Surveyors & Builders Under One Roof.

Surveyor-led refurbishment advice via Hampstead Chartered Surveyors →

One Studio. One Contract. One Team.

We deliver Golders Green full refurbishment with architects, engineers, surveyors and builders under one fixed-price contract - design, technical coordination, procurement, directly managed site teams, Building Control, programme control and final handover through one accountable team.

4.9 rating · £10M insurance · RIBA architectural team · Golders Green specialists
103+
Completed Projects
RIBA
In-House Chartered Architects
Structural
Engineering Calculations
Planning
Applications & Consents
Building
Control
Compliance Support
Leasehold
Licence for Alteration
£10M
Fully Insured
RICS
Chartered Surveyors

Full Refurbishment in Golders Green: What You Need to Know

This is our broadest refurbishment service in Golders Green. It covers structural alterations, complete M&E replacement, new kitchens and bathrooms, joinery, flooring, and decoration in one coordinated programme — with a single project manager as your point of contact throughout. Fixed price, weekly progress reports, and a 10-year structural guarantee on completion. Golders Green properties typically include Edwardian villas, 1920s semis, Arts & Crafts terraces.

Refurbishment projects in Golders Green may require planning permission for external changes. Internal renovations typically proceed under building regulations. We manage all approvals.

Diverse suburban neighbourhood in Barnet with a vibrant high street, excellent transport links and proximity to Hampstead Heath extension. Family-oriented with spacious properties.

Our Refurbishment Services

Our Refurbishment Services in Golders Green

Every project is delivered by our directly-employed teams — no subcontractors, no surprises, no hidden costs.

Full Refurbishment in Golders Green: Planning & Local Context

London Borough of Barnet · NW11

Planning for full refurbishment in Golders Green

Whole-property refurbishment in Golders Green frequently involves conservation-area consent — and listed-building consent where applicable — so London Borough of Barnet assesses external alterations, windows and structural changes alongside Building Regulations, often with party wall agreements on terraced and semi-detached homes.

London Borough of Barnet & conservation context

Golders Green NW11 sits within parts of the Golders Green and Hampstead Garden Suburb conservation areas, and Barnet's Local Plan applies, and in the Suburb the Hampstead Garden Suburb Trust adds a second, stricter layer of design control on top of council consent. Our RIBA architects prepare and submit every application to London Borough of Barnet and handle pre-application discussions where a scheme is finely balanced.

Building Regulations

Full Refurbishment in Golders Green must satisfy Building Regulations — covering structural alterations to Part A, fire safety to Part B, thermal upgrades to Part L, and electrical and gas certification. Our in-house engineers manage Building Control from initial notice through to the completion certificate.

Recent work & local links

Explore our other Golders Green services — Kitchen Renovation Loft Conversions — or the Golders Green renovation hub for the full picture of how we work locally.

Our in-house planning team prepares and submits every London Borough of Barnet application and manages building control end to end. View our planning track record →

Frequently Asked Questions About Full Refurbishment in Golders Green

Barnet · NW11

Full Refurbishment in Golders Green typically costs £650–£1,250/sqm. The final price depends on the scope, specification and complexity of the project. We provide a detailed fixed-price quotation after the initial consultation and design phase.

Whether planning permission is required in Golders Green depends on the scope of work. Our team assesses planning requirements at the initial consultation and manages all necessary applications.

Full Refurbishment projects in Golders Green typically take 12-20 weeks. Including design and any planning approvals, the total programme depends on project complexity. We provide a detailed timeline at the consultation stage.

We're specialists in edwardian semis and detached houses, inter-war properties, 1930s housing and some victorian terraces, with extensive experience in Golders Green and across Barnet. Our in-house team of RIBA architects, structural engineers and build crews delivers every project under one fixed-price contract — from design through to completion.

Whole-House Transformation

Refurbishment & Interiors

Strip it back, reimagine it, rebuild it beautifully. Our full refurbishment service takes a tired or dated London home and transforms every room — reconfiguring layouts, upgrading all services, installing new kitchens and bathrooms and delivering a cohesive interior design that unifies the entire property. One team, one contract, one vision.

RIBA ArchitectsLayout & interior design
Interior DesignersIn-house design studio
Fixed-PriceFrom £650/sqm
Full Refurbishment Includes
Every discipline under one fixed-price contract
Layout redesign & 3D rendersIncluded
Structural engineering-led alterationsIncluded
Full rewire & replumbIncluded
Kitchen & bathroomsIncluded
Flooring, joinery & decorationIncluded
Interior design & specificationIncluded
Typical project time12–24 weeks
Last updated: March 2026
Design Studio: 250 Finchley Road, NW3
Open Mon–Fri 9am – 6pm
Material library & finish samples on display
15+ Years Experience
RIBA Chartered Architects
RICS Surveying Oversight
£10M Insurance Cover
Fixed-Price Contracts

Whole-Property Refurbishment in Golders Green

Golders Green NW11 is a largely Edwardian and inter-war suburb of substantial houses, so a full refurbishment commonly renews a whole family house — structure, services, layout — with room for extension. Our architectural design and structural engineering teams lead the design so layout, structure and services are resolved together under one fixed-price process.

Planning & Building Control in Barnet

Refurbishment works fall under Barnet, and where the property is listed or in a conservation area, alterations to protected fabric can require listed building consent. We establish the relevant designations at feasibility and run the planning and conservation consents in parallel with the build.

Structure, Party Wall & Programme

A full refurbishment touches structure throughout — openings, beams and often a basement or loft — so works to shared structures engage the Party Wall etc. Act 1996, and the programme is sequenced from strip-out through first fix, plaster, second fix and fit-out. See our Golders Green work or book a consultation.

103+
Completed Projects
RIBA
In-House Chartered Architects
Structural
Engineering Calculations
Planning
Applications & Consents
Building
Control
Compliance Support
Leasehold
Licence for Alteration
10M
Fully Insured
RICS
Chartered Surveyors

Whole-House Renovation for London's Period Homes

Golders Green grew quickly after the Underground arrived in 1907, and the housing that followed is confidently Edwardian and inter-war: Edwardian villas, 1920s and 1930s semis and Arts & Crafts terraces, with older Victorian and Edwardian terraces, mansion flats and mews-like pockets filling in between. A whole-house refurbishment in NW11 therefore begins behind the plaster rather than in front of it — the state of the services, the way the roof and any rear-extension interface meet the existing structure, and the bones of a suburban house planned for a different pattern of family life.

Layout comes first. On Highfield Avenue and Wentworth Road the villas and semis take well to a re-planned ground floor, better circulation and a loft conversion or rear extension, so the plan is resolved before a single finish is chosen. Towards Hoop Lane and the edge of Hampstead Garden Suburb, the Arts & Crafts terraces call for conservation-led restoration of render, brick and authentic timber detail, which decides what may change externally and what has to be repaired in kind.

Golders Green Road is a different project again: leasehold flats and conversions above the shops, where a Licence to Alter, managing-agent consent and acoustic separation between dwellings set the boundaries of the scheme. Facade and window decisions, party-wall coordination and Barnet’s conservation controls all feed the same design, so they are settled together rather than one at a time.

A full refurbishment goes far deeper than new paint and replacement kitchens. It addresses everything behind the walls — rewiring electrical systems that haven't been updated since the 1960s, replacing lead plumbing with copper and plastic, insulating solid walls that leak heat through every brick, and reconfiguring floor plans designed for a Victorian household with live-in servants, not a contemporary family.

Our approach starts with the layout. Before selecting a single tile or paint colour, our architects redesign the floor plan — opening up cramped ground floors, relocating bathrooms, creating en-suites, adding utility rooms, improving circulation and sight-lines, and ensuring every square metre works harder.

Once the layout is resolved, our interior designers develop a cohesive design language that runs through every room — material palettes, joinery profiles, ironmongery, lighting schemes, tile specifications and colour stories developed as a unified whole. The result is a home that feels intentional throughout.

Every refurbishment is delivered under a single fixed-price contract covering design, structural alterations, full M&E, kitchen, bathrooms, flooring, joinery, decoration and all finishes. We don't quote for building work then add extras for interiors — it's all one price.

Every Room, Every System, Every Detail

A full refurbishment touches every element of your home.

Layout Reconfiguration

Removing and repositioning internal walls, creating open-plan spaces, adding en-suites, reconfiguring staircases and improving circulation. Our architects redesign the entire floor plan before a single trade enters the building.

Electrical Rewire

Complete consumer unit replacement, new circuits, contemporary socket layouts with USB charging, dimmer circuits, smart home pre-wiring and lighting design circuits. Certified to BS 7671 18th Edition.

Plumbing & Heating

Full replumb replacing lead pipework. New condensing boiler or heat pump, radiator upgrade or underfloor heating, pressurised hot water systems and new waste connections.

Kitchen & Bathrooms

Bespoke kitchen design with premium cabinetry and appliances. Bathroom fit-outs with wall-hung sanitary ware, walk-in showers, freestanding baths and underfloor heating.

Flooring & Joinery

Engineered oak, natural stone, porcelain, encaustic tile — specified room by room. Bespoke skirting, architraves, wardrobes, bookcases, window seats and alcove units designed to the property's character.

Lighting & Smart Home

Architectural lighting schemes layering ambient, task and accent lighting. Smart control (Lutron, Rako), multi-room audio pre-wiring, automated blinds and centralised home control.

Room-by-Room Refurbishment Guide

Golders Green grew quickly after the Underground arrived in 1907, so room-by-room work in NW11 means Edwardian and inter-war fabric, and what you can do depends on which of the area's stock types you own.

  • Kitchens in the Edwardian villas and 1920s semis of Highfield Avenue and Wentworth Road sit at the back, so a kitchen scheme quickly becomes a rear-extension conversation about how the new roof meets the existing house and the garden boundary.
  • Bathrooms and heating in the mansion flats and conversions above the shops on Golders Green Road are leasehold work: relocating a wet room means acoustic separation between dwellings and managing-agent consent, not simply a new layout.
  • Living rooms and elevations in the Arts and Crafts terraces near Hoop Lane are restoration jobs: render, brick and authentic timber detail repaired to match, because these facades are read as a coherent street.
  • Lofts suit the villas and semis, where roof developments add rooms without giving up garden.
  • Lower-ground rooms divide sharply: converting an existing cellar is a fit-out problem, while a new basement extension means excavation and underpinning beneath a house never designed for it.

Across the terraces and semis, party-wall coordination with attached neighbours and service upgrades usually set the sequence every room follows.

Every room in a full refurbishment has its own technical requirements, specification decisions and sequencing considerations. Here is what is involved in each.

Kitchen

A full kitchen refurbishment begins with complete strip-out of existing units, flooring, wall finishes, electrics and plumbing. The space is then rewired with dedicated circuits for oven, hob, extraction, fridge-freezer and dishwasher, plus general socket circuits with USB provision. Plumbing is re-run in copper and plastic to new locations. The layout is redesigned for workflow efficiency — our kitchen designers follow the work-triangle principle while adapting to the specific proportions of your room. New installations include bespoke or premium cabinetry, stone or composite worktops, integrated appliances, feature lighting (under-cabinet, pendant, recessed), splashback tiling or glass, and engineered timber or stone flooring. Extraction is ducted to the outside. Underfloor heating is fitted beneath the finished floor.

Bathrooms

Bathrooms require the most intensive waterproofing of any room in the house. We strip out all existing fittings, tiles and substrate, then apply tanking membrane to all wet areas (shower enclosures, bath surrounds, floors) before tiling. Underfloor heating is installed beneath porcelain or natural stone tiles. Plumbing is re-run to accommodate the new layout, often including relocation of waste stacks and soil pipes. Sanitaryware selection includes wall-hung WCs (for easier cleaning and a more spacious feel), freestanding or built-in baths, walk-in or wetroom showers with frameless glass enclosures, and twin basin vanity units. Heated towel rails, anti-mist mirrors, recessed LED lighting and extractor fans complete the specification.

Living Spaces

Living rooms and reception rooms often involve structural alterations — removing load-bearing walls to create open-plan spaces, installing steel beams to support the floor above, and widening doorways to improve flow between rooms. Flooring is selected for acoustics and durability: engineered oak, natural stone or high-quality LVT. Lighting design layers ambient (recessed downlights or pendant fittings), task (reading lamps, desk lighting) and accent (picture lights, LED strips, uplighters) circuits on separate dimmer controls. Bespoke joinery — alcove shelving, window seats, media walls, fireplace surrounds — is designed to the proportions of each room. Walls are re-plastered to a smooth finish, and period features (cornicing, ceiling roses, dado rails) are restored or replicated where appropriate.

Bedrooms

Bedroom refurbishment focuses on creating calm, well-organised spaces. Built-in wardrobes are designed floor-to-ceiling with internal fittings (hanging rails, shelving, drawers, shoe racks, lighting) tailored to how you dress. Acoustic insulation is installed in party walls and floors — particularly important in converted flats and terraced properties — using acoustic mineral wool and resilient bars to achieve meaningful sound reduction. Windows are overhauled or replaced: secondary glazing for listed properties, slim-profile double glazing for conservation areas, or high-performance triple glazing where planning allows. Blackout blinds, layered lighting (bedside, wardrobe, ambient) and smart controls complete a restful environment.

Hallways & Stairs

The hallway sets the tone for the entire house. In period properties, we restore original encaustic or geometric floor tiles, repair and French-polish timber balustrades, rebuild newel posts and reinstate panelled wainscoting or dado rails. Where the original features have been lost, we commission faithful reproductions from specialist joiners. Stair treads are repaired and finished in matching timber, with runners fitted for noise reduction and grip. Lighting is critical: a combination of pendant or lantern fittings, wall sconces and recessed lighting creates depth and warmth. Storage is built into dead space beneath staircases. Doorbells, entry systems, coat hooks, shoe storage and radiator covers are all specified as part of the design.

Utility & Storage

A dedicated utility room is one of the most requested additions in a full refurbishment. We create space for washing machine, tumble dryer (or washer-dryer), sink, drying rack, ironing station and cleaning supply storage. Plumbing and extraction are run to the utility room during first fix. Where space permits, a separate pantry with open shelving, cold storage and counter space significantly improves kitchen functionality. Plant rooms house the boiler (or heat pump indoor unit), hot water cylinder, consumer unit and any home automation hardware — keeping services accessible for maintenance while hidden from living spaces. Every cupboard and storage area is fitted with lighting and considered as part of the overall design.

Refurbish vs Rebuild

In NW11 this question is usually settled by the planning position before it is settled by the building. Barnet’s conservation areas and Article 4 controls shape external change across much of Golders Green, and there are listed buildings within the postcode, so demolition and replacement is rarely the straightforward option it might be elsewhere. Homes towards the Suburb edge sit under a stricter regime again, and the coherent facades and garden boundaries that give these broad residential streets their character are exactly what the controls exist to hold.

Refurbishment is normally the right route when:

  • the property is one of the Edwardian villas or 1920s and 1930s semis on streets such as Highfield Avenue and Wentworth Road, where the structure is sound and the gains come from re-planning, a loft conversion or a rear extension;
  • the house is an Arts & Crafts terrace near Hoop Lane, where render, brick and authentic timber detail are worth restoring rather than replacing;
  • the home is a leasehold flat or conversion in the Golders Green Road mansion blocks, where the demise is the flat itself and works proceed under a Licence to Alter with managing-agent consent;
  • conservation area status, Article 4 controls or listed status make external alteration a matter for negotiation with Barnet rather than assumption.

A more radical structural approach only comes into view where the existing fabric is genuinely beyond economic repair and the planning position allows it — and inside a conservation area that is a conversation with the borough, not a default. In practice the great majority of Golders Green projects run from family whole-house refurbishment of a villa, semi or terrace through to leasehold works inside a mansion flat. Establishing Barnet’s conservation rules, and the tighter position just over the boundary in Hampstead Garden Suburb, before the design is fixed stops that decision having to be taken twice.

Not every property is best served by refurbishment. Here is how to decide whether to refurbish the existing structure or demolish and rebuild.

When Refurbishment Makes Sense

Refurbishment is the right choice when the existing structure is fundamentally sound — solid walls, stable foundations, a serviceable roof. It is also the preferred route when the property has period features worth preserving (original cornicing, ceiling roses, fireplaces, panelled doors, timber floors), when planning restrictions make demolition difficult or impossible (listed buildings, conservation areas), or when budget constraints favour working with the existing shell rather than starting from scratch. Most London period properties — Victorian terraces, Georgian townhouses, Edwardian semis — fall firmly into the refurbishment category.

When Rebuild Is Better

Demolition and rebuild is justified when the existing structure has significant defects — severe subsidence, failed foundations, widespread dry rot affecting the structural timber, or extensive asbestos contamination that makes strip-out more expensive than demolition. It may also make sense when the desired layout is so radically different from the existing building that the structural alterations required would cost more than rebuilding. In some cases, a Whole Energy Retrofit analysis may show that the existing building fabric is so thermally poor that a new build to current standards offers better long-term value.

Cost Comparison

A comprehensive refurbishment typically costs £650–£1,250/sqm depending on specification level. A demolition and rebuild (excluding land value) costs substantially more per square metre. However, the rebuild figure includes foundations, superstructure, roof, external walls and all services — elements that already exist in a refurbishment. The decision should be made on a case-by-case basis following a thorough structural survey. We provide honest advice on which route offers the best outcome for your specific property.

Sequencing Your Refurbishment

In Golders Green the running order starts before the first skip arrives. Conservation area status, Article 4 controls and, in the Golders Green Road mansion blocks, a Licence to Alter all have to be resolved while the drawings are still fluid, because they decide what the facade, windows and roof are permitted to become. Party-wall coordination belongs in the same early window: on the semis and terraces of NW11 the neighbouring house is part of your structure, and notices take their own time regardless of how ready the site is.

Once the consents are in hand, the build follows a fixed order.

  • Strip-out. The house is taken back to its shell so its real condition becomes visible. In stock of this age — largely Edwardian and inter-war, with older Victorian terraces mixed in — this is where hidden damp, tired timber and previous alterations show themselves, and dealing with them now costs far less than after new work has started.
  • Structure. Openings are formed, beams and lintels installed, floors strengthened. Where the scheme includes a basement extension, the excavation and underpinning sequence sits here and drives everything after it, with the party-wall position agreed earlier governing how work proceeds against the adjoining semi or terrace.
  • Envelope: roof, rear extension, facade. Roof developments and rear-extension interfaces are closed up and made watertight before anything internal is finished. On the Arts & Crafts terraces near Hoop Lane this is also the stage for conservation-led repair of render, brick and authentic timber detail, matched to what the conservation area expects rather than to whatever is quickest.
  • First fix. Wiring, pipework, heating and ventilation are run while the structure is open. Service upgrades are one of the recognised drivers of a Golders Green budget, and they are effectively locked at this point — relocating a bathroom or adding an en-suite afterwards means undoing finished work.
  • Plaster and dry lining. The house is closed up. In the leasehold flats and conversions above the shops, this is where the acoustic separation between dwellings agreed with the freeholder and managing agent is physically built in.
  • Second fix and joinery. Kitchens, bathrooms, doors, skirtings, architraves and restored period detail are fitted. In a villa on Highfield Avenue or a semi on Wentworth Road, joinery profiles are matched to whatever original detail survives elsewhere in the house.
  • Decoration, flooring and commissioning. Finishes, floors, lighting, then the testing and handover of the services.
  • External works. Boundaries, paths and planting last. Garden boundaries and coherent facades are part of how these broad residential streets read, so they are completed properly rather than treated as an afterthought.

The one departure from this order is a phased, occupied refurbishment, which is common in the mansion flats where moving out is not straightforward. The same sequence then runs zone by zone, keeping a working kitchen and bathroom available in whichever part of the flat is not currently on site.

The order in which trades enter the building is critical. Getting the sequence wrong causes delays, rework and damage to finished surfaces. Here is the correct order and why it matters.

1

Strip-Out

Everything that is being replaced is removed: kitchens, bathrooms, floor coverings, old plaster, redundant electrics and plumbing, partition walls. The building is taken back to its structural shell. This reveals the true condition of the property — hidden damp, rotten timbers, failed lintels, asbestos — allowing problems to be addressed before new work begins. Skipping a thorough strip-out is the most common cause of cost overruns, because defects discovered after new work has started require expensive rework.

2

Structural Works

Load-bearing walls are removed and steel beams installed. Floors are strengthened, lintels replaced, timber joists sistered or renewed. Any underpinning, foundation work or damp-proofing is completed at this stage. Structural work must be finished and signed off by building control before first fix begins, because the building must be structurally stable before services are installed within it.

3

First Fix (Electrics & Plumbing)

New electrical cables are run to every socket, switch, light fitting and appliance position. Plumbing pipes are run to every tap, WC, bath, shower, washing machine and boiler location. Heating pipework (radiators or underfloor) is laid. Ventilation ductwork is installed. First fix happens before plastering because all cables and pipes need to be concealed within the walls and floors. Getting the positions right at this stage is critical — moving a socket after plastering means cutting out plaster, re-routing cable and re-plastering.

4

Plastering

Walls and ceilings are plastered to a smooth finish over the first-fix services. This creates the final surface for decoration and must be done to a high standard — imperfections in plaster are visible through paint. Plaster must dry thoroughly (typically 2–4 weeks depending on season and ventilation) before decoration begins. Rushing this stage leads to paint failure and mould. We monitor moisture levels with a hygrometer and do not begin decoration until readings are within tolerance.

5

Second Fix

Electrical face plates (sockets, switches, light fittings) are installed. Bathroom and kitchen fittings are connected. Radiators or underfloor heating thermostats are fitted. Doors are hung, ironmongery fitted, skirting boards and architraves installed. This stage brings the house from a building site to something recognisable as a home.

6

Kitchen & Bathroom Fit

Kitchen units, worktops, splashbacks and appliances are installed. Bathrooms are tiled, sanitaryware fitted, screens and mirrors hung. These are the highest-specification elements of the refurbishment and require careful protection during subsequent decoration work.

7

Decoration

Walls are mist-coated (to seal new plaster), then finished with two coats of emulsion. Woodwork is undercoated and gloss-finished (or eggshell for a contemporary look). Ceilings are painted. Wallpaper is hung where specified. This stage must happen after all dusty trades (plastering, tiling, sanding) are complete to avoid contamination of wet paint surfaces.

8

Snagging & Handover

A detailed room-by-room inspection identifies any defects: paint touch-ups, alignment adjustments, scratches, incomplete seals, stiff handles, squeaky floorboards. Every snag is logged, photographed and rectified before handover. We provide a full handover pack including appliance manuals, paint references, material specifications, electrical certificates, gas safety records and a 12-month defects liability warranty.

Building Regulations for Refurbishments

Not every refurbishment requires building regulations approval, but many elements do. Here are the key Approved Documents that commonly apply.

Part P — Electrical Safety

Any electrical work in a dwelling must be carried out by a Part P registered electrician or notified to building control. A full rewire, new consumer unit, new circuits, or work in bathrooms and kitchens all require Part P compliance. On completion, you receive an Electrical Installation Certificate and the work is registered on the national database. We use Part P registered electricians on every project and provide full certification as standard.

Part L — Energy Efficiency

When you replace more than 25% of a thermal element (roof, walls, floors, windows), the replacement must meet current thermal performance standards. This means if you are replastering walls, you may need to add insulation to meet the required U-values. Similarly, window replacement triggers minimum energy performance requirements. In a full refurbishment where all elements are being renewed, a SAP assessment may be required to demonstrate overall energy performance. We design insulation strategies that improve thermal performance without compromising room proportions or period character.

Part B — Fire Safety (Flats)

If you are refurbishing a flat within a converted building, fire safety regulations apply to the means of escape. Fire doors (FD30S) must be fitted to all habitable rooms opening onto a communal hallway. Smoke detection systems must comply with BS 5839. Fire-resistant construction may be required to walls and ceilings separating your flat from communal areas and other dwellings. Where structural alterations create new openings in fire-separating elements, fire stopping must be installed to maintain compartmentalisation.

Part E — Acoustic Performance

When converting a house into flats, or refurbishing an existing flat conversion, Part E requires minimum acoustic performance between dwellings. This typically means upgrading floor and wall constructions to achieve specified airborne and impact sound insulation values. Even in a single dwelling, acoustic insulation between bedrooms and living spaces significantly improves comfort. We specify acoustic mineral wool, resilient bars, acoustic plasterboard and floating floor systems where required to achieve or exceed the minimum standards.

From Brief to Move-In Day

A structured process ensuring nothing is missed.

01
Weeks 1–2

Survey, Brief & Feasibility

Full property survey — structural condition, M&E assessment, damp checks, asbestos screening. We discuss how you use each room, your lifestyle priorities and aesthetic preferences. You receive a feasibility report with scope, budget and timeline.

Full property survey M&E condition report Design brief Budget framework
02
Weeks 3–8

Design, Interiors & Specification

Architects redesign the floor plan. Interior designers develop material palettes, colour schemes, joinery details, bathroom and kitchen schemes, lighting and furniture layouts — all in photorealistic 3D. Every selection approved from physical samples before ordering. Complete specification document locks in every finish before construction.

Floor plan redesign Room-by-room 3D renders Interior specification Fixed-price contract
03
Weeks 1–4 on site

Strip-Out & Structural Phase

Property stripped to structural shell. Old kitchens, bathrooms, floor coverings, plaster, electrics and plumbing removed. Structural engineering-led alterations: walls removed, steels installed, floors strengthened. Asbestos professionally removed where found.

Controlled strip-out Structural works Asbestos removal Damp treatment
04
Weeks 5–12

First Fix & Services

New electrical circuits, plumbing and heating throughout. Underfloor heating, insulation, plasterboarding, plastering and stud walls for new room configurations. Every socket, switch and pipe position exactly as specified.

Full rewire Full replumb Heating installation Plastering
05
Weeks 13–20+

Second Fix, Fit-Out & Interiors

Kitchen installation, bathroom tiling, flooring throughout, bespoke joinery, staircase renovation, door hanging, ironmongery, second fix electrics, painting and decoration — room by room to quality sign-off. Snagging and handover with 12-month warranty.

Kitchen & bathrooms Flooring & joinery Full decoration Snagging & handover

Transparent Pricing

Guide prices per sqm. All tiers include design, structural work, full M&E, kitchens, bathrooms and decoration.

Essential

Quality Foundations

£650/sqm
  • Full rewire & replumb
  • Layout reconfiguration
  • Good-quality kitchen & bathrooms
  • Engineered wood / LVT flooring
  • Painted finishes throughout
  • Standard lighting design
Premium

Most Popular

£1,250/sqm
  • Everything in Essential, plus:
  • Bespoke kitchen & premium bathrooms
  • Engineered oak / natural stone floors
  • Bespoke joinery throughout
  • Architectural lighting scheme
  • Underfloor heating
Luxury

No Compromise

£2,250/sqm+
  • Everything in Premium, plus:
  • Furniture-grade cabinetry & marble
  • Period detail restoration
  • Smart home integration
  • Designer fixtures & fittings
  • Full interior design service

Why Our Refurbishments Stand Apart

What makes our refurbishments different from a builder and a decorator.

Period Property Expertise

We understand Victorian proportions, Georgian joinery profiles, Edwardian ceiling heights and how to introduce contemporary elements that complement period character.

Material Library

Our Finchley Road studio houses stone samples, timber swatches, tile displays, fabric books and ironmongery collections — all for in-person selection.

Procurement Management

We manage procurement of every material and fitting — coordinating lead times across 50+ suppliers to ensure on-time site delivery.

Thermal Upgrading

Insulation improvements, draught-proofing, boiler upgrades and window enhancements that improve energy performance without compromising character.

Sash Window Restoration

Original sashes overhauled, draught-sealed, re-weighted and re-glazed rather than replaced — maintaining heritage character and avoiding replacement costs.

Project Management

Dedicated project manager coordinates all trades, manages the programme, conducts weekly inspections and provides regular client updates.

Vacant & Occupied

We refurbish both vacant properties (fastest) and occupied homes (phased room-by-room). We advise the most practical approach for your circumstances.

Pre-Purchase Refurbishments

Many clients appoint us before completing on a purchase — so the programme starts on day of exchange and the house is ready to move into on completion.

Recent Refurbishments

Selected whole-house refurbishments across London.

BEFORELOUNGEDININGKITUTILITYAFTEROPEN PLAN LIVINGISLAND KITCHENUTILITY + WCWhole House

Victorian Terrace — Complete

Crouch End, N8 — 4-Bed, 180 sqm

Full strip-back and reconfiguration. New open-plan ground floor, 3 bathrooms, bespoke kitchen and complete rewire/replumb.

180 sqm 18 weeks Premium
SECOND FL — 2 BEDS + BATHFIRST FL — MASTER + EN-SUITEGROUND — KITCHEN-DINER + STUDYPeriod

Georgian Townhouse — 3 Floors

Hampstead, NW3 — Grade II Listed

Sensitive refurbishment: new kitchen-diner, 3 redesigned bathrooms, period joinery restoration and complete M&E upgrade.

240 sqm 22 weeks Luxury
LIVINGKITCHENMASTER+ EN-SUITEBED 2BATHApartment

Mansion Block — Full Refit

Maida Vale, W9 — 2-Bed Apartment

Complete 95sqm flat refurbishment. New layout with en-suite master, open-plan kitchen-living, full rewire and contemporary interior.

95 sqm 12 weeks Premium
View Full Portfolio

Need a same-day repair in NW London?

Visit Hampstead On Demand →
4.9 on Google • 120+ reviews

What Clients Say

We bought a tired 1890s terrace and appointed Hampstead Renovations before exchange. They started the day we got the keys. Eighteen weeks later we moved into a home that felt like it had been built for us — the layout is completely different but every period detail respected. The interior design continuity room to room makes the whole house feel intentional.

VL
Victoria L.Whole-house, Highbury N5

The 3D room renders were game-changing. We could see exactly how the herringbone floor, wall colour, pendant lights and joinery worked together before orders were placed. We made two changes in design that would have cost thousands on site. The fixed price held exactly across 22 weeks and 240 square metres.

RM
Robert M.Georgian refurb, Hampstead NW3

We refurbished our Maida Vale flat while renting it out — Hampstead managed everything without us visiting once during the 12-week build. The procurement coordination was extraordinary: every tile, fitting and piece of ironmongery arrived exactly when needed. Boutique hotel standard quality. Tenants moved in the day after handover.

DF
Daniel F.Flat refurb, Maida Vale W9
HR
Reviewed by Hampstead Renovations
RIBA Chartered Architects & Heritage Specialists whose team brings 15+ years combined experience in North & Central London residential projects.

Refurbishment Questions

Common questions about full house refurbishment in Golders Green.

Is my Golders Green home in a conservation area?

Quite possibly. Conservation areas cover a number of Golders Green streets and protect the green setting around Hoop Lane and Golders Hill Park, and Barnet’s planning controls apply throughout them. There are listed buildings within NW11 as well. Designation attaches to the address rather than to the street name, so the position for your specific property is confirmed with Barnet before design work is committed.

What do Article 4 controls actually restrict?

Article 4 controls in Barnet withdraw permitted development rights for certain external changes, so alterations you might assume are automatic — to the front elevation, windows, roof or boundary — require an application instead. On streets where coherent facades and garden boundaries carry the character, that is precisely what they are there to hold. It affects the order of work more than the ambition of it: the external decisions simply have to be taken earlier.

Our house is on the Suburb edge. Does that change things?

Golders Green sits on the western edge of Hampstead Garden Suburb, and the regime just over that boundary is stricter again. Homes near the edge, including streets running towards Hoop Lane, are best approached on the basis that every external decision will be examined closely. Internally there is far more latitude; it is the facade, roof and boundary that need the early conversation.

I own a leasehold flat on Golders Green Road. What consents do I need?

The mansion blocks and conversions above the shops are leasehold, so alongside any statutory approvals you will need a Licence to Alter and the freeholder’s or managing agent’s consent. That process governs structural changes, the position of wet rooms, alterations to services and the standard of acoustic separation between flats. It runs on the landlord’s timetable rather than yours, which is why it is opened at the same time as the drawings rather than once they are finished.

Can I convert the loft or extend at the rear?

Roof developments and rear extensions are both familiar here, and the Edwardian villas and 1920s and 1930s semis on streets such as Highfield Avenue and Wentworth Road suit them particularly well — whole-house refurbishment, a loft conversion and a rear extension frequently form a single project. What decides the answer is the planning position of your address and how the new roof or extension meets the existing structure, both worth resolving on paper before anything is priced.

Is a basement extension possible?

Basement extensions are part of the picture in Golders Green, whether that means converting an existing cellar or excavating new space beneath the house. They are the most planning-sensitive and the most neighbour-sensitive element of any refurbishment here, because excavation and underpinning work directly against the party wall of the adjoining semi or terrace. A basement is a decision to take at the outset, not one to add mid-programme.

Will I need a party wall agreement?

Very likely, given the local stock. Semis, terraces and mansion flats all share structure with somebody, and party-wall coordination is one of the recognised drivers of a Golders Green programme. Notices, surveyors and awards take their own time, so they are served early and tracked alongside the planning and leasehold consents rather than behind them.

What sort of properties do you refurbish in NW11?

The full local range: Edwardian villas and 1920s and 1930s semis, Arts & Crafts terraces near Hoop Lane and the Suburb edge, older Victorian and Edwardian terraces, mews-like pockets and leasehold mansion flats. Projects run from family whole-house refurbishment through to leasehold works inside a flat in the mansion blocks.

What drives the scale of a refurbishment here?

Six things, consistently: whether the property is a terrace or a suburban house and how that structure behaves; facade and window decisions, which the conservation position often dictates; the roof or rear-extension interface; leasehold approvals where the home is a flat; party-wall coordination with the neighbours; and the extent of the service upgrades behind the plaster. Two houses on the same street can differ substantially on those points alone, so each is scoped individually rather than by floor area.

Do we have to move out?

For a full strip-back it is usually the sensible choice, since there is no working kitchen, bathroom or heating while the house is open. Where vacating is impractical — often the case in the mansion flats — the work is phased zone by zone so a usable kitchen and bathroom remain available, accepting that a phased programme runs longer than an empty-property one.

Do you work in the surrounding areas?

Yes. Golders Green sits alongside Hampstead Garden Suburb, Hampstead, West Hampstead, Highgate, Muswell Hill and Crouch End, and the housing types and planning questions carry across those boundaries even where the local authority position does not.

Where does a project start?

With the survey and the consent position together: the condition of structure, roof and services on one side, and conservation area status, Article 4 controls and any leasehold requirements on the other. Settling Barnet’s rules for your address, and the tighter position if you sit on the Suburb boundary, before the layout is fixed is what keeps a Golders Green refurbishment on its original programme.

Common questions about full house refurbishment.

How much does a full refurbishment cost?

All prices are in pounds sterling (GBP, £). Cosmetic refurbishment typically runs £650–£1,250/sqm, and comprehensive back-to-brick renovation £2,250–£3,250/sqm. A typical 150sqm refurbishment costs £120,000–£150,000 (GBP) fully inclusive of design, M&E, kitchens, bathrooms, flooring, joinery and decoration. All prices fixed before work begins.

How long does it take?

Design 4–8 weeks. Build: flats 12–14 weeks, 3-bed houses 16–18 weeks, larger properties 20–24 weeks. Vacant properties are faster (simultaneous room access); occupied refurbishments are phased and take longer.

Do I need to move out?

For a full strip-back, we recommend vacating — there will be no working kitchen, bathroom or heating for several weeks. For partial or phased refurbishments, you can remain in residence while we work room by room, maintaining a functioning kitchen and bathroom throughout.

Do you provide interior design?

Yes — interior design is core to our refurbishment service. In-house designers develop complete specifications: colour palettes, materials, joinery, tiles, lighting, ironmongery, bathrooms and kitchens. Everything in 3D and selected from physical samples. We also work happily to an external designer's specification.

Can you refurbish listed properties?

Absolutely — a significant proportion of our work involves listed buildings and conservation areas. We handle LBC applications, heritage-appropriate materials (lime plaster, traditional joinery, period ironmongery) and the need to respect original features while introducing contemporary services.

Will it add value?

A comprehensive refurbishment typically adds 25–40% to London property value — comfortably exceeding cost. The greatest uplift comes from properties bought in poor condition and refurbished to a high standard.

How long does a full refurbishment take?

A typical full refurbishment of a 3–4 bedroom London property takes 12–24 weeks on site, depending on the scope of structural works, specification level and property size. A smaller flat (1–2 bedrooms) with no structural alterations can be completed in 8–12 weeks. Larger properties (5+ bedrooms) or projects involving basement or loft conversions may take 6–9 months. Add 4–8 weeks of design time before construction begins. We provide a detailed programme at the start of every project showing weekly milestones and key decision points.

Can I live in the house during refurbishment?

For a full refurbishment — where every room is being stripped, rewired and replastered — we strongly recommend moving out. The property will have no functioning kitchen or bathroom during the works, dust levels are significant during strip-out and plastering phases, and the constant presence of trades makes daily living extremely difficult. Most clients either rent nearby, stay with family or use short-term accommodation. For partial refurbishments (one floor at a time), it may be possible to live in the unaffected part of the property, though this extends the programme and requires careful sequencing.

What is the difference between refurbishment and renovation?

The terms are often used interchangeably, but in the construction industry, a refurbishment implies a more comprehensive scope than a renovation. A renovation might involve updating kitchens and bathrooms, redecorating and minor repairs — working with the existing layout and services. A full refurbishment typically means stripping the property back to its structural shell and rebuilding everything: new electrics, new plumbing, new heating, new layout, new finishes throughout. It is essentially creating a new home within an existing shell. Our full refurbishment service covers the complete scope from strip-out to handover.

Do I need planning permission for a refurbishment?

Internal refurbishment work generally does not require planning permission — you can rewire, replumb, replaster, fit new kitchens and bathrooms, and redecorate without any planning application. However, planning permission is needed if you are: changing the external appearance of the building (new windows, changing door positions, removing chimneys), making structural alterations visible from outside, changing the use of the property, or working on a listed building (where Listed Building Consent is required for most internal and external works). In conservation areas, window replacement and external changes may also require planning consent.

How much does a full house refurbishment cost per sqm?

Our full refurbishment costs typically range from £650–£1,250/sqm, depending on specification level. A standard refurbishment sits at the lower end of that range and includes complete rewire, replumb, plastering, new kitchen, new bathrooms, flooring and decoration to a good quality. A premium specification sits mid-range and adds bespoke joinery, designer kitchens, high-end sanitaryware, engineered timber flooring and architectural lighting. An ultra-premium specification sits at the top of that range and includes top-tier brands (Bulthaup, Lefroy Brooks, Dinesen), smart home systems, and bespoke everything. For a 150 sqm London house, expect total costs of £75,000–£180,000 depending on specification.

What is included in a full refurbishment?

Our full refurbishment scope covers: architectural layout redesign, 3D visualisations, complete strip-out, structural alterations (wall removals, steels), full electrical rewire to 18th Edition, full replumb in copper and plastic, new heating system (boiler or heat pump), plastering throughout, new kitchen design and installation, new bathroom design and installation, flooring throughout (timber, stone, tile or LVT), bespoke joinery (wardrobes, shelving, media walls), staircase renovation, door replacement or overhaul, ironmongery, lighting design, decoration (paint, wallpaper), and snagging. Interior design specification is included as part of the package — not charged separately.

Do I need building regulations approval?

Yes, for most elements of a full refurbishment. Electrical rewiring must comply with Part P and be certified by a registered electrician. Structural engineering-led alterations (wall removals, new beams) require building regulations approval under Part A. Replacement windows must meet Part L energy standards. Heating installations must comply with Part J (combustion appliances) and Part L. In flats, fire safety (Part B) and acoustic (Part E) requirements apply. We manage all building regulations applications and inspections as part of our service, ensuring full compliance and providing all necessary certificates at handover.

How do you protect period features during refurbishment?

Protecting original features is a priority on every period property refurbishment. Before strip-out, we conduct a detailed survey identifying features to retain: original cornicing, ceiling roses, fireplaces, floor tiles, timber floors, panelled doors, balustrades, stained glass and decorative plasterwork. These are either protected in situ with boarding, dust sheets and impact protection, or carefully removed, labelled and stored off-site for reinstatement. Our specialist plasterers can repair damaged cornicing and cast new sections to match existing profiles. Original timber floors are sanded and refinished. Fireplaces are restored, re-lined where necessary and fitted with appropriate grates or log burners. Where original features have been lost in previous unsympathetic alterations, we commission faithful reproductions from specialist craftspeople.

Explore Our Other Services

A full refurbishment often includes elements from our specialist services. Explore the detail.

Further Reading

Related Guides & Articles

Victorian Guide
Victorian Property Renovation in North London
Kitchen Renovation
Kitchen Renovation Services
Bathroom Renovation
Bathroom Renovation Services
Structural Engineering
Structural Engineering Services
Hampstead
Full Refurbishment in Hampstead
Chelsea
Full Refurbishment in Chelsea
Guide Paths

Popular Guides for Golders Green

Use these area-specific guide pages to compare the next build routes, planning questions and cost topics people commonly research in Golders Green NW11.

Browse all guides →
Area Guide
Full House Refurbishment Golders Green NW11
Area Guide
Listed Building Renovation Golders Green NW11
Area Guide
Full House Refurbishment Cost Golders Green NW11
Area Guide
Builders Golders Green NW11

Book a Free Consultation

Visit our studio or invite us to survey your home. We'll assess scope, discuss design possibilities and provide an honest budget framework — completely free.

020 8054 8756Mon–Fri, 9am – 6pm
contact@hampsteadrenovations.co.ukWe respond within 24 hours
250 Finchley Road, NW3 6DNDesign studio — material library

Free Consultation

We survey your property, discuss your vision and provide a clear budget framework.

Book Free Consultation
No obligation Fixed-price quote 12-month warranty

Enquire before 2pm — we’ll call you the same day (Mon–Fri).

Local Expertise

Why Choose Us for Full Refurbishment in Golders Green

We're not a national chain — we're a local design and build practice with deep roots in Golders Green and the surrounding neighbourhoods.

Design Studio 8 minutes Away

Our design studio at 250 Finchley Road NW3 is just 8 minutes from Golders Green. Visit to see materials, meet the team, and discuss your project in person.

Barnet Planning Experts

Our RIBA architects have extensive experience with Barnet Council's planning department, conservation officers, and building control team. We know what gets approved.

We Know Golders Green Properties

From the Edwardian semis, 1930s detached houses and inter-war villas on The Ridgeway, Helenslea Avenue, Rotherwick Road and Hodford Road — we understand the specific construction challenges and planning context of every property type in NW11.

Full Refurbishment in Nearby Areas

Full Refurbishment in Hampstead Garden Suburb Full Refurbishment in Hampstead Full Refurbishment in West Hampstead Full Refurbishment in Muswell Hill Full Refurbishment in Highgate

Core Golders Green services

Golders Green Renovation Services House Refurbishment in Golders Green Flat Refurbishment in Golders Green House Extensions in Golders Green Loft Conversions in Golders Green Basement Conversions in Golders Green Kitchen Renovation in Golders Green Bathroom Renovation in Golders Green
Also Serving Nearby Areas

Full Refurbishment Near Golders Green

The same NW3 design-build team covers the neighbouring areas:

Full Refurbishment in Hampstead Garden Suburb → Full Refurbishment in Hampstead → Full Refurbishment in West Hampstead → Full refurbishment regional guide →
Chat with us!